Council planning record

Application to discharge conditions nos.18 (engineering, drainage and constructional details for adopted roads) and 22 (construction management plan) of planning permission ref: 19/00654/OUTMAJ / appeal ref: APP/D2320/W/20/3247136 (Outline planning application for the erection of up to 180 dwellings including 30% affordable housing, with public open space, structural planting and landscaping, surface water flood mitigation and attenuation and vehicular access points from School Lane. All matters reserved except for means of vehicular access)

Land Between Pear Tree Lane And School Lane Pear Tree Lane Euxton

GrantedReference: 22/00240/DISChorley Borough Council

Last published check: 2 Oct 2026, 11:15. Check the council record for more recent changes.

Application location

Land Between Pear Tree Lane And School Lane Pear Tree Lane Euxton

This record has no verified map location.

View council map

Application summary

Status
Granted
Application type
Discharge of Condition(s)
Received
2 Mar 2022
Validated
2 Mar 2022
Determination deadline
27 Apr 2022
Local authority
Chorley Borough Council

Application overview

Application to discharge conditions nos.18 (engineering, drainage and constructional details for adopted roads) and 22 (construction management plan) of planning permission ref: 19/00654/OUTMAJ / appeal ref: APP/D2320/W/20/3247136 (Outline planning application for the erection of up to 180 dwellings including 30% affordable housing, with public open space, structural planting and landscaping, surface water flood mitigation and attenuation and vehicular access points from School Lane. All matters reserved except for means of vehicular access)

Proposal details

Reference
22/00240/DIS
Alternative references
PP-11076774
Ward
Euxton
Parish
Euxton

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 30 of 30

DocumentPublishedAction
LCC HIGHWAYSConsultee Comment · PDF8 Jan 2024View
GENERAL LETTERCorrespondence · PDF8 Jan 2024View
DISCHARGE OF COND 22.Correspondence · PDF20 Apr 2022View
C.22 REVISED CMP (REV.A)Amended Plans · PDF19 Apr 2022View
LCC HIGHWAYSConsultee Comment5 Apr 2022View
EH FURTHER COMMENTSConsultee Response1 Apr 2022View
MR PAUL LEEConsultee Comment · PDF10 Mar 2022View
CONSULTATION LETTERCorrespondence · PDF9 Mar 2022View
CONSULTATION LETTERCorrespondence · PDF9 Mar 2022View
CONSULTATION LETTERCorrespondence · PDF9 Mar 2022View
ACKNOWLEDGEMENT LETTERCorrespondence · PDF9 Mar 2022View
APPLICATIONFORMREDACTEDPlanning Application (inc initial correspondence) · PDF2 Mar 2022View
C.18 - 30460_3_1_LONGITUDINAL SECTIONSPlanning Application (inc initial correspondence) · PDF2 Mar 2022View
C.18 - 30460_3_2_LONGITUDINAL SECTIONSPlanning Application (inc initial correspondence) · PDF2 Mar 2022View
C.18 - 30460_3_3_LONGITUDINAL SECTIONSPlanning Application (inc initial correspondence) · PDF2 Mar 2022View
C.18 - 30460_3_4_LONGITUDINAL SECTIONSPlanning Application (inc initial correspondence) · PDF2 Mar 2022View
C.18 - 30460_3_5_LONGITUDINAL SECTIONSPlanning Application (inc initial correspondence) · PDF2 Mar 2022View
C.18 - 30460_4_TYPICAL HIGHWAY DETAILSPlanning Application (inc initial correspondence) · PDF2 Mar 2022View
C.18 - 30460_5_1A_SURFACE WATER MANHOLE SCHEDULESPlanning Application (inc initial correspondence) · PDF2 Mar 2022View
C.18 - 30460_5_2A_SURFACE WATER MANHOLE SCHEDULESPlanning Application (inc initial correspondence) · PDF2 Mar 2022View
C.18 - 30460_5_3A_SURFACE WATER MANHOLE SCHEDULESPlanning Application (inc initial correspondence) · PDF2 Mar 2022View
C.18 - 30460_5_4A_SURFACE WATER MANHOLE SCHEDULESPlanning Application (inc initial correspondence) · PDF2 Mar 2022View
C.18 - 30460_6_1A_FOUL MANHOLE SCHEDULESPlanning Application (inc initial correspondence) · PDF2 Mar 2022View
C.18 - 30460_6_2A_FOUL MANHOLE SCHEDULESPlanning Application (inc initial correspondence) · PDF2 Mar 2022View
C.18 - 30460_6_3A_FOUL MANHOLE SCHEDULESPlanning Application (inc initial correspondence) · PDF2 Mar 2022View
C.18 - 30460_7_CONTROL MANHOLE DETAILSPlanning Application (inc initial correspondence) · PDF2 Mar 2022View
C.18 - 30460_12A_SECTION 38 AGREEMENT LAYOUTPlanning Application (inc initial correspondence) · PDF2 Mar 2022View
C.18 - 30460_13A_PROPOSED ROAD CONTOURSPlanning Application (inc initial correspondence) · PDF2 Mar 2022View
C.18 - 30460_1A_HIGHWAYSPlanning Application (inc initial correspondence) · PDF2 Mar 2022View
C.18 - 30460_2A_ROAD SETTING OUT DETAILSPlanning Application (inc initial correspondence) · PDF2 Mar 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Issued Date

    Published milestoneCouncil source

Decision & conditions

Condition(s) discharged

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.