Council planning record

Application to discharge conditions nos. 4 (external facing and roofing materials), 7 (scheme for the construction of the site access and the off-site works of highway improvement), 8 (surfacing materials of the access road and turning area), 9 (foul and surface water to be drained on separate systems), 10 (landscaping scheme), 12 (dwelling emission rate 19%), 13 (SAP assessment), 14 (surface water drainage scheme) and 15 (details of existing and proposed ground levels) of planning permission 19/01191/FUL (Erection of 2no. detached dwellings, following the demolition of existing buildings)

Double R Catering Supplies 289 Wood Lane Heskin Chorley PR7 5NT

RefusedReference: 21/00151/DISChorley Borough Council

Last published check: 9 Oct 2026, 02:21. Check the council record for more recent changes.

Application location

Double R Catering Supplies 289 Wood Lane Heskin Chorley PR7 5NT

This record has no verified map location.

View council map

Application summary

Status
Refused
Application type
Discharge of Condition(s)
Received
9 Feb 2021
Validated
9 Feb 2021
Determination deadline
4 May 2021
Local authority
Chorley Borough Council

Application overview

Application to discharge conditions nos. 4 (external facing and roofing materials), 7 (scheme for the construction of the site access and the off-site works of highway improvement), 8 (surfacing materials of the access road and turning area), 9 (foul and surface water to be drained on separate systems), 10 (landscaping scheme), 12 (dwelling emission rate 19%), 13 (SAP assessment), 14 (surface water drainage scheme) and 15 (details of existing and proposed ground levels) of planning permission 19/01191/FUL (Erection of 2no. detached dwellings, following the demolition of existing buildings)

Proposal details

Reference
21/00151/DIS
Alternative references
PP-09483278
Ward
Eccleston, Heskin And Charnock Richard
Parish
Heskin
Agent
CW Planning Solutions Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 26 of 26

DocumentPublishedAction
GENERAL LETTERCorrespondence · PDF19 Apr 2023View
GENERAL LETTERCorrespondence · PDF16 Dec 2022View
GENERAL LETTERCorrespondence · PDF8 Sept 2021View
C7 & C8 ACCESS PLANAmended Plans · PDF15 Apr 2021View
C4 EXTERNAL FACING MATERIALSAmended Plans · PDF31 Mar 2021View
C10 LANDSCAPE PLANAmended Plans · PDF31 Mar 2021View
CONSULTATION LETTERCorrespondence · PDF25 Mar 2021View
C15 LEVELSAmended Plans · PDF25 Mar 2021View
C14 DRAINAGE LAYOUTAmended Plans · PDF25 Mar 2021View
UNITED UTILITIESConsultee Response · PDF3 Mar 2021View
LCC HIGHWAYSConsultee Response · PDF1 Mar 2021View
CONSULTATION LETTERCorrespondence · PDF15 Feb 2021View
CONSULTATION LETTERCorrespondence · PDF15 Feb 2021View
CONSULTATION LETTERCorrespondence · PDF15 Feb 2021View
CONSULTATION LETTERCorrespondence · PDF15 Feb 2021View
ACKNOWLEDGEMENT LETTERCorrespondence · PDF15 Feb 2021View
C12 DER PLOT 1 FABRICPlanning Application (inc initial correspondence) · PDF9 Feb 2021View
C12 DER PLOT 1Planning Application (inc initial correspondence) · PDF9 Feb 2021View
C12 DER PLOT 2 FABRICPlanning Application (inc initial correspondence) · PDF9 Feb 2021View
C12 DER PLOT 2Planning Application (inc initial correspondence) · PDF9 Feb 2021View
ENERGY STATEMENTPlanning Application (inc initial correspondence) · PDF9 Feb 2021View
C14 DRAINAGE STATEMENTPlanning Application (inc initial correspondence) · PDF9 Feb 2021View
C14 FLOOD MAP PLANNINGPlanning Application (inc initial correspondence) · PDF9 Feb 2021View
C14 UU DRAINAGE RECORDSPlanning Application (inc initial correspondence) · PDF9 Feb 2021View
C14 SW RUNOOFF CALCSPlanning Application (inc initial correspondence) · PDF9 Feb 2021View
APPLICATION FORM REDACTEDPlanning Application (inc initial correspondence) · PDF9 Feb 2021View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Issued Date

    Published milestoneCouncil source

Decision & conditions

Condition(s) not discharged
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.