Council planning record

Application to discharge conditions 4 (existing and proposed ground levels and proposed building finished floor levels) and 12 (engineering, drainage, street lighting and constructional details of the streets) of reserved matters consent 18/00269/REMMAJ (Erection of 125 no. residential dwellings (including 60 affordable dwellings) and associated landscape and highway works (pursuant to outline permission ref: 14/00927/OUTMAJ) (Resubmission of 17/00767/REMMAJ)

Group 1 Euxton Lane Euxton

UnknownReference: 18/00640/DISChorley Borough Council

Last published check: 9 Oct 2026, 14:03. Check the council record for more recent changes.

Application location

Group 1 Euxton Lane Euxton

This record has no verified map location.

View council map

Application summary

Status
Unknown
Application type
Discharge of Condition(s)
Received
28 Jun 2018
Validated
10 Apr 2025
Determination deadline
5 Jun 2025
Local authority
Chorley Borough Council

Application overview

Application to discharge conditions 4 (existing and proposed ground levels and proposed building finished floor levels) and 12 (engineering, drainage, street lighting and constructional details of the streets) of reserved matters consent 18/00269/REMMAJ (Erection of 125 no. residential dwellings (including 60 affordable dwellings) and associated landscape and highway works (pursuant to outline permission ref: 14/00927/OUTMAJ) (Resubmission of 17/00767/REMMAJ)

Proposal details

Reference
18/00640/DIS
Alternative references
PP-07090812
Ward
Astley And Buckshaw
Parish
Euxton
Agent
N.a

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 25 of 25

DocumentPublishedAction
GENERAL LETTERCorrespondence · PDF6 Jan 2026View
HIGHWAY COMMENTSConsultee Response · PDF7 May 2025View
ACKNOWLEDGEMENT LETTERCorrespondence · PDF10 Apr 2025View
CONSULTATION LETTERCorrespondence · PDF10 Apr 2025View
15048-2 C3104 (S185 long sections sheet 2)Site Elevations, Building Plans etc. · PDF28 Jun 2018View
15048-2 C1001 B (External works sheet 2)Site Elevations, Building Plans etc. · PDF28 Jun 2018View
15048-2 C2003 E (PLOT DRAINAGE SHEET 2)Site Elevations, Building Plans etc. · PDF28 Jun 2018View
15048-2 C3001 B (Road setting out information)Site Elevations, Building Plans etc. · PDF28 Jun 2018View
15048-2 C3102 E (LONGITUDINAL SECTIONS SHEET 2)Site Elevations, Building Plans etc. · PDF28 Jun 2018View
15048-2-C3201 A (Construction details)Site Elevations, Building Plans etc. · PDF28 Jun 2018View
FeeCalculationPlanning Application (inc initial correspondence) · PDF28 Jun 2018View
15048-2 C2007 B (S185 diversion plan)Site Elevations, Building Plans etc. · PDF28 Jun 2018View
15048-2 C2203 D (FOUL WATER 1 to 20 DETAILS)Site Elevations, Building Plans etc. · PDF28 Jun 2018View
15048-2 C3103 (S185 long sections sheet 1)Site Elevations, Building Plans etc. · PDF28 Jun 2018View
ApplicationFormPlanning Application (inc initial correspondence) · PDF28 Jun 2018View
15048-2 C3002 A ( Kerb and surfacing layout)Site Elevations, Building Plans etc. · PDF28 Jun 2018View
OLSL-09-18-02-01 REV A (S38 Street Lighting proposed)Site Elevations, Building Plans etc. · PDF28 Jun 2018View
15048-2 C2002 F (PLOT DRAINAGE SHEET 1)Site Elevations, Building Plans etc. · PDF28 Jun 2018View
15048-2 C1000 B (External works sheet 1)Site Elevations, Building Plans etc. · PDF28 Jun 2018View
15048-2 C2201 G (SCHEDULE MANHOLES)Site Elevations, Building Plans etc. · PDF28 Jun 2018View
15048-2 C3101 E (LONGITUDINAL SECTIONS SHEET 1)Site Elevations, Building Plans etc. · PDF28 Jun 2018View
15048-2 C2204 A (FOUL WATER 1 to 20 DETAILS)Site Elevations, Building Plans etc. · PDF28 Jun 2018View
AttachmentSummaryPlanning Application (inc initial correspondence) · PDF28 Jun 2018View
15048-2 C2202 B (SURFACE WATER 1 to 20 DETAILS)Site Elevations, Building Plans etc. · PDF28 Jun 2018View
15048-2 C2001 M (DRAINAGE LAYOUT)Site Elevations, Building Plans etc. · PDF28 Jun 2018View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Issued Date

    Published milestoneCouncil source

Decision & conditions

Split Decision

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.