Council planning record

Discharge of conditions 5 (CEMP) 6 (ecology) and 9 (lighting) from planning permission BO/24/01012/FUL

Land North Of Highgrove Farm Main Road Bosham West Sussex

PermitReference: 24/02892/DOCChichester District Council

Last published check: 3 Oct 2026, 01:16. Check the council record for more recent changes.

Application location

Land North Of Highgrove Farm Main Road Bosham West Sussex

This record has no verified map location.

View council map

Application summary

Status
Permit
Application type
Discharge of Conditions
Received
18 Dec 2024
Validated
18 Dec 2024
Determination deadline
12 Feb 2025
Local authority
Chichester District Council

Application overview

Discharge of conditions 5 (CEMP) 6 (ecology) and 9 (lighting) from planning permission BO/24/01012/FUL

Proposal details

Reference
24/02892/DOC
Alternative references
PP-13637174
Ward
Harbour Villages
Parish
Bosham

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 33 of 33

DocumentPublishedAction
CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN 12/3/25Application Documents · PDF3 Apr 2025View
EMAIL FROM WSCC HIGHWAYS 11/3/25 -Correspondence · PDF12 Mar 2025View
Decision NoticeDecision Notice · PDF12 Mar 2025View
WSCC TRANSPORT PLANNER EMAIL AND CEMP DEPARTURE FROM STANDARD FORMApplication Documents · PDF11 Mar 2025View
EOT - 12.03.2025Correspondence · PDF6 Feb 2025View
CDC ENVIRONMENTAL PROTECTIONConsultee Comment · PDF28 Jan 2025View
PUBLIC COMMENTThird Party Other · PDF20 Jan 2025View
WSCC HIGHWAYSConsultee Comment · PDF14 Jan 2025View
CDC ENVIRONMENTAL STRATEGYConsultee Comment · PDF6 Jan 2025View
HRA SCREENING MATRIXApplication Documents24 Dec 2024View
WESTERN CONSTRUCTION CROSSOVER SWEPT PATH ANALYSIS SHEET 2Plan - Under Consideration · PDF23 Dec 2024View
WESTERN CONSTRUCTION CROSSOVER SWEPT PATH ANALYSIS SHEET 1Plan - Under Consideration · PDF23 Dec 2024View
APPENDIX F - WESTERN CONSTRUCTION CROSSOVER S184 GENERAL ARRANGEMENT AND DETAILSPlan - Under Consideration · PDF23 Dec 2024View
LARGE CAR SWEPT PATH ANALYSIS - TEMPORARY SALES ACCESSPlan - Under Consideration · PDF23 Dec 2024View
GENERAL ARRANGEMENT TEMPORARY SALES ACCESSPlan - Under Consideration · PDF23 Dec 2024View
GENERAL ARRANGEMENT TEMPORARY SALES ACCESSPlan - Superseded · PDF23 Dec 2024View
GENERAL ARRANGEMENT PERMANENT EMERGENCY ACCESSPlan - Superseded · PDF23 Dec 2024View
FIRE TENDER SWEPT PATH ANALYSIS - TEMPORARY SALES ACCESSPlan - Under Consideration · PDF23 Dec 2024View
FIRE TENDER SWEPT ANALYSIS - PERMANENT EMERGENCY ACCESSPlan - Under Consideration · PDF23 Dec 2024View
APPENDIX F - EASTERN CONSTRUCTION CROSSOVER SWEPT PATH ANALYSIS SHEET 2Plan - Under Consideration · PDF23 Dec 2024View
APPENDIX F - EASTERN CONSTRUCTION CROSSOVER SWEPT PATH ANALYSIS SHEET 1Plan - Under Consideration · PDF23 Dec 2024View
APPENDIX F - EASTERN CONSTRUCTION CROSSOVER S184 GENERAL ARRANGEMENT AND DETAILSPlan - Under Consideration · PDF23 Dec 2024View
STAGE 2 ROAD SAFETY AUDIT REPORTApplication Documents · PDF23 Dec 2024View
APPLICATION FORMApplication Form · PDF18 Dec 2024View
LIGHTING ASSESSMENTApplication Documents · PDF18 Dec 2024View
ECOLOGICAL MITIGATION AND MANAGEMENT PLANApplication Documents · PDF18 Dec 2024View
PROPOSED SITE LAYOUTPlan - Under Consideration · PDF18 Dec 2024View
APPENDIX D - GENERAL ARRANGEMENTPlan - Under Consideration · PDF18 Dec 2024View
APPENDIX A - SITE IMPLEMENTATION PLANPlan - Under Consideration · PDF18 Dec 2024View
APPENDIX B - CONSTRUCTION TRAFFIC ROUTEApplication Documents · PDF18 Dec 2024View
APPENDIX C - GENERIC STANDARD (INTERNAL) SITE COMPOUNDPlan - Under Consideration · PDF18 Dec 2024View
CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLANSuperseded Document · PDF18 Dec 2024View
COVERING LETTERApplication Documents · PDF18 Dec 2024View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Decision Issued Date

    Published milestoneCouncil source
  7. Decision Made Date

    Published milestoneCouncil source
  8. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

PERMIT
Decision Notice
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.