Council planning record

Variation of conditions 2 (Approved plans), 4 (Construction Environmental Management Plan), 5 (Flood Risk Assessment), 6 (Surface water management), 7 (Drainage hierarchy), 8 (Surface Water runoff), 9 (Non-native species protocol), 11 (HMMP), 12 (Species Enhancement Plan), 14 (Employment and Training Scheme), 15 (Sustainability statement), 16 (Retaining details), 19 (Boundary treatments), 20 (Landscaping), 31 (Construction Management Plan), 33 (Construction Environmental Management Plan), 35 (LEAP), 36 (M4(2) units) and 37 (Drainage works details) of application CHE/24/00432/FUL (Residential development comprising the erection of 102 dwellings, together with landscaping, infrastructure, access arrangements and associated works)

Land To The West Of Bevan Drive Inkersall Chesterfield Derbyshire

Awaiting decisionReference: CHE/26/00360/VCONChesterfield Borough Council

Last published check: 16 Oct 2026, 15:31. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Neighbour Consultation Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Agreed Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Awaiting decision
Application type
Vary condition
Received
13 May 2026
Validated
4 Jun 2026
Determination deadline
3 Sept 2026
Local authority
Chesterfield Borough Council

Application overview

Variation of conditions 2 (Approved plans), 4 (Construction Environmental Management Plan), 5 (Flood Risk Assessment), 6 (Surface water management), 7 (Drainage hierarchy), 8 (Surface Water runoff), 9 (Non-native species protocol), 11 (HMMP), 12 (Species Enhancement Plan), 14 (Employment and Training Scheme), 15 (Sustainability statement), 16 (Retaining details), 19 (Boundary treatments), 20 (Landscaping), 31 (Construction Management Plan), 33 (Construction Environmental Management Plan), 35 (LEAP), 36 (M4(2) units) and 37 (Drainage works details) of application CHE/24/00432/FUL (Residential development comprising the erection of 102 dwellings, together with landscaping, infrastructure, access arrangements and associated works)

Proposal details

Reference
CHE/26/00360/VCON
Ward
Staveley South
Parish
Staveley Town Council
Agent
Nexus Planning

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Land To The West Of Bevan Drive Inkersall Chesterfield Derbyshire

This record has no verified map location.

View council map

Documents 170 of 170

DocumentPublishedAction
RESIDENT COMMENTPublic Comment · PDF15 Oct 2026View
LEAD LOCAL FLOOD AUTHORITY COMMENTSConsultee Comment · PDF15 Oct 2026View
NHS DERBYSHIREConsultee Comment · PDF15 Oct 2026View
STRATEGIC PLANNING COMMENTSConsultee Comment · PDF15 Oct 2026View
COAL AUTHORITY COMMENTConsultee Comment · PDF9 Oct 2026View
DERBYSHIRE WILDLIFE TRUST COMMENTSConsultee Comment · PDF8 Oct 2026View
PLANNING STATEMENTBackground Documents · PDF6 Oct 2026View
HIMALAYAN BALSAM RECOMMENDATIONSBackground Documents · PDF5 Oct 2026View
JAPANESE KNOTWEED METHODS STATEMENTBackground Documents · PDF5 Oct 2026View
DRAINAGE MAINTENANCE & MANAGEMENT SCHEDULEBackground Documents · PDF5 Oct 2026View
ENGINEERING LAYOUTRevised Drawing · PDF5 Oct 2026View
SURFACE FINISHES AND KERBSRevised Drawing · PDF5 Oct 2026View
SECTION 104 AGREEMENT PLANRevised Drawing · PDF5 Oct 2026View
MANHOLE SCHEDULESBackground Documents · PDF5 Oct 2026View
HARDSTANDING AREASRevised Drawing · PDF5 Oct 2026View
GULLY CATCHMENT PLANRevised Drawing · PDF5 Oct 2026View
PLOTWORKS DRAINAGE SHEET 1Revised Drawing · PDF5 Oct 2026View
PLOTWORKS DRAINAGE SHEET 2Revised Drawing · PDF5 Oct 2026View
DRAINAGE DETAILS SHEET 1Revised Drawing · PDF5 Oct 2026View
DRAINAGE DETAILS SHEET 2Revised Drawing · PDF5 Oct 2026View
HYDROBRAKE DETAILSRevised Drawing · PDF5 Oct 2026View
SUDS DETAILSRevised Drawing · PDF5 Oct 2026View
FLOOD ROUTING PLANRevised Drawing · PDF5 Oct 2026View
ADOPTABLE ROAD AND SEWER LONG SECTIONS SHEET 1Revised Drawing · PDF5 Oct 2026View
ADOPTABLE ROAD AND SEWER LONG SECTIONS SHEET 2Revised Drawing · PDF5 Oct 2026View
PLOTWORKS EXTERNAL LEVELS SHEET 1Revised Drawing · PDF5 Oct 2026View
PLOTWORKS EXTERNAL LEVELS SHEET 2Revised Drawing · PDF5 Oct 2026View
EXTERNAL RETAINING WALL DETAILSRevised Drawing · PDF5 Oct 2026View
PUBLIC RIGHT OF WAYRevised Drawing · PDF5 Oct 2026View
SURFACE WATER CONSTRUCTION MANAGEMENT PLANRevised Drawing · PDF5 Oct 2026View
LANDSCAPE PROPOSALS SHEET 1 OF 3Revised Drawing · PDF5 Oct 2026View
LANDSCAPE PROPOSALS SHEET 2 OF 3Revised Drawing · PDF5 Oct 2026View
LANDSCAPE PROPOSALS SHEET 3 OF 3Revised Drawing · PDF5 Oct 2026View
LEAP DESIGNRevised Drawing · PDF5 Oct 2026View
SITE LAYOUT PLANRevised Drawing · PDF5 Oct 2026View
MATERIALS SCHEDULE PLANRevised Drawing · PDF5 Oct 2026View
SITE LAYOUT PLAN (M4(2) PLAN)Revised Drawing · PDF5 Oct 2026View
BLOCK LOCATIONSRevised Drawing · PDF5 Oct 2026View
STREET SCENESRevised Drawing · PDF5 Oct 2026View
SITE SECTIONS SHEET 1 OF 3Revised Drawing · PDF5 Oct 2026View
SITE SECTIONS SHEET 2 OF 3Revised Drawing · PDF5 Oct 2026View
SITE SECTIONS SHEET 3 OF 3Revised Drawing · PDF5 Oct 2026View
PHASING PLANRevised Drawing · PDF5 Oct 2026View
BLOCK 01 HOUSE TYPE DORTON HT22-HT22Revised Drawing · PDF5 Oct 2026View
BLOCK 02 HOUSE TYPE DORTON HT22-HT22 RENDERRevised Drawing · PDF5 Oct 2026View
BLOCK 03 HOUSE TYPE DORTONRevised Drawing · PDF5 Oct 2026View
BLOCK 04 HOUSE TYPE ELLINGHAM HT31 V1-HT31 V1Revised Drawing · PDF5 Oct 2026View
BLOCK 05 HOUSE TYPE ELLINGHAM HT31 V2-HT31 V2Revised Drawing · PDF5 Oct 2026View
BLOCK 06 HOUSE TYPE GAYTON & DORTON HT33-HT22Revised Drawing · PDF5 Oct 2026View
BLOCK 07 HOUSE TYPE DORTON & GAYTON HT22-HT33Revised Drawing · PDF5 Oct 2026View
BLOCK 08 HOUSE TYPE ELLINGHAM & GAYTON HT31 V1-HT33Revised Drawing · PDF5 Oct 2026View
BLOCK 09 HOUSE TYPE GAYTON & ELLINGHAM X2 HT33-HT31V2-HT31V2Revised Drawing · PDF5 Oct 2026View
BLOCK 10 HOUSE TYPE ELLINGHAM HT31 V2-HT31 V2-HT31 V2Revised Drawing · PDF5 Oct 2026View
BLOCK 11 HOUSE TYPE GAYTON & DORTON X2 HT33-HT22-HT22Revised Drawing · PDF5 Oct 2026View
BLOCK 12 HOUSE TYPE MADALAY HT42-HT42Revised Drawing · PDF5 Oct 2026View
BLOCK 13 HOUSE TYPE MADALAY HT42-HT42 RENDERRevised Drawing · PDF5 Oct 2026View
ADDENDUM TO DESIGN & ACCESS STATEMENTBackground Documents · PDF5 Oct 2026View
CONVEYANCE PLANRevised Drawing · PDF5 Oct 2026View
LANDSCAPE MANAGEMENT PLANBackground Documents · PDF5 Oct 2026View
SPECIES ENHANCEMENT PLANBackground Documents · PDF5 Oct 2026View
EMPLOYMENT AND TRAINING SCHEMEBackground Documents · PDF5 Oct 2026View
PROJECT EXECUTION PLANBackground Documents · PDF5 Oct 2026View
ENVIRONMENTAL SPECIFICATIONSBackground Documents · PDF5 Oct 2026View
CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLANBackground Documents · PDF5 Oct 2026View
CONTACTOR MANAGEMENTBackground Documents · PDF5 Oct 2026View
CDMBackground Documents · PDF5 Oct 2026View
TEMPORARY WORKSBackground Documents · PDF5 Oct 2026View
SITE LAYOUT PLANRevised Drawing · PDF5 Oct 2026View
WASTE MANAGEMENT AND POLLUTION CONTROLBackground Documents · PDF5 Oct 2026View
ENERGY STATEMENTBackground Documents · PDF5 Oct 2026View
SCHEDULE 2 HEADER AND REPORTOther · PDF5 Oct 2026View
SCHEDULE 2 REPORT TABLE AS MINUTEDOther · PDF5 Oct 2026View
NHS PRIMARY CARE ESTATES TEAM COMMENTConsultee Comment · PDF18 Jul 2026View
URBAN DESIGN OFFICER COMMENTSConsultee Comment · PDF7 Jul 2026View
DERBYSHIRE FIRE AND RESCUE COMMENTSConsultee Comment · PDF6 Jul 2026View
LEAD LOCAL FLOOD AUTHORITY COMMENTSConsultee Comment · PDF2 Jul 2026View
DESIGN SERVICES DRAINAGEConsultee Comment · PDF1 Jul 2026View
PUBLIC COMMENTPublic Comment · PDF29 Jun 2026View
COAL AUTHORITY COMMENTConsultee Comment · PDF24 Jun 2026View
YORKSHIRE WATER COMMENTConsultee Comment · PDF19 Jun 2026View
RESIDENT COMMENTPublic Comment · PDF19 Jun 2026View
DCC HIGHWAYS COMMENTConsultee Comment · PDF18 Jun 2026View
ECONOMIC DEVELOPMENT UNIT COMMENTConsultee Comment · PDF18 Jun 2026View
RESIDENT COMMENTPublic Comment · PDF16 Jun 2026View
RESIDENT COMMENTPublic Comment · PDF16 Jun 2026View
DCC ARCHAEOLOGY COMMENTSConsultee Comment · PDF16 Jun 2026View
RESIDENT COMMENTPublic Comment · PDF15 Jun 2026View
RESIDENT COMMENTPublic Comment · PDF14 Jun 2026View
RESIDENT COMMENTPublic Comment · PDF12 Jun 2026View
RESIDENT COMMENTPublic Comment · PDF12 Jun 2026View
ENVIRONMENTAL HEALTH COMMENTSConsultee Comment · PDF10 Jun 2026View
ADDENDUM TO DESIGN & ACCESS STATEMENTBackground Documents · PDF4 Jun 2026View
(SUPERSEDED) BLOCK 03 HOUSE TYPE DORTON HT22-HT22-HT22Drawing · PDF4 Jun 2026View
(SUPERSEDED) BLOCK 06 HOUSE TYPE GAYTON & DORTON HT33-HT22Drawing · PDF3 Jun 2026View
(SUPERSEDED) BLOCK 09 HOUSE TYPE GAYTON & ELLINGHAM X2 HT33-HT31 V2-HT31 V2Drawing · PDF3 Jun 2026View
(SUPERSEDED) BLOCK 11 HOUSE TYPE GAYTON & DORTON X2Drawing · PDF3 Jun 2026View
(SUPERSEDED) STREET SCENESDrawing · PDF3 Jun 2026View
(SUPERSEDED) SITE SECTIONS SHEET 3 OF 3Drawing · PDF3 Jun 2026View
(SUPERSEDED) PLANNING STATEMENTBackground Documents · PDF1 Jun 2026View
HIMALAYAN BALSAM RECOMMENDATIONSBackground Documents · PDF1 Jun 2026View
JAPANESE KNOTWEED REMEDIATION METHOD STATEMENTBackground Documents · PDF1 Jun 2026View
(SUPERSEDED) SITE LAYOUT PLANDrawing · PDF1 Jun 2026View
(SUPERSEDED) SITE LAYOUT PLAN (COLOUR)Drawing · PDF1 Jun 2026View
(SUPERSEDED) BOUNDARY TREATMENT PLAN AND DETAILSDrawing · PDF1 Jun 2026View
(SUPERSEDED) MATERIALS SCHEDULE PLANDrawing · PDF1 Jun 2026View
(SUPERSEDED) SITE LAYOUT PLAN M4(2)Drawing · PDF1 Jun 2026View
(SUPERSEDED) BLOCK LOCATIONSDrawing · PDF1 Jun 2026View
(SUPERSEDED) SITE SECTIONS SHEET 1 OF 3Drawing · PDF1 Jun 2026View
(SUPERSEDED) SITE SECTIONS SHEET 2 OF 3Drawing · PDF1 Jun 2026View
(SUPERSEDED) PHASING PLANDrawing · PDF1 Jun 2026View
(SUPERSEDED) BLOCK 01 HOUSE TYPE DORTON H22-H22Drawing · PDF1 Jun 2026View
(SUPERSEDED) BLOCK 02 HOUSE TYPE DORTON H22-H22 RENDERDrawing · PDF1 Jun 2026View
(SUPERSEDED) BLOCK 04 HOUSE TYPE ELLINGHAM HT31 V1-HT31 V1Drawing · PDF1 Jun 2026View
(SUPERSEDED) BLOCK 05 HT31 V2-HT31 V2Drawing · PDF1 Jun 2026View
(SUPERSEDED) BLOCK 07 HOUSE TYPE DORTON AND GAYTON HT22-HT33Drawing · PDF1 Jun 2026View
(SUPERSEDED) BLOCK 08 HOUSE TYPE ELLINGHAM & GAYTON HT31 V1-HT33Drawing · PDF1 Jun 2026View
(SUPERSEDED) BLOCK 10 HOUSE TYPE ELLINGHAM X3Drawing · PDF1 Jun 2026View
(SUPERSEDED) BLOCK 12 HOUSE TYPE MADALAYDrawing · PDF1 Jun 2026View
(SUPERSEDED) BLOCK 13 HOUSE TYPE MADALAY RENDERDrawing · PDF1 Jun 2026View
STATUTORY METRICBackground Documents1 Jun 2026View
APPLICATIONFORMREDACTEDApplication Form · PDF13 May 2026View
DEVELOPMENTS SAFETY, HEALTH AND ENVIRONMENTBackground Documents · PDF13 May 2026View
CONTRACTOR MANAGEMENTBackground Documents · PDF13 May 2026View
CDMBackground Documents · PDF13 May 2026View
TEMPORARY WORKSBackground Documents · PDF13 May 2026View
(SUPERSEDED) WASTE MANAGEMENT AND POLLUTION CONTROLBackground Documents · PDF13 May 2026View
(SUPERSEDED) FLOOD RISK ASSESSMENT & DRAINAGE STRATEGYBackground Documents · PDF13 May 2026View
(SUPERSEDED) FLOOD RISK ASSESSMENT APPENDICESBackground Documents · PDF13 May 2026View
(SUPERSEDED) SURFACE WATER CONSTRUCTION MANAGAMENT PLANDrawing · PDF13 May 2026View
(SUPERSEDED) HABITAT MANAGEMENT AND MONITORING PLANBackground Documents · PDF13 May 2026View
(SUPERSEDED) CONSTRUCTION ENVIRONMENT MANAGEMENT PLAN FOR BIODIVERSITYBackground Documents · PDF13 May 2026View
(SUPERSEDED) SPECIES ENHANCEMENT PLANBackground Documents · PDF13 May 2026View
(SUPERSEDED) ENERGY STATEMENTBackground Documents · PDF13 May 2026View
(SUPERSEDED) RETAINING WALL STRUCTURAL CALCULATIONSBackground Documents · PDF13 May 2026View
(SUPERSEDED) EXTERNAL RETAINING WALL DETAILSDrawing · PDF13 May 2026View
(SUPERSEDED) LANDSCAPE PROPOSALS SHEET 1 OF 3Drawing · PDF13 May 2026View
(SUPERSEDED) LANDSCAPE PROPOSALS SHEET 2 OF 3Drawing · PDF13 May 2026View
(SUPERSEDED) LANDSCAPE PROPOSALS SHEET 3 OF 3Drawing · PDF13 May 2026View
(SUPERSEDED) PROPOSED PLAY AREADrawing · PDF13 May 2026View
(SUPERSEDED) LANDSCAPE MANAGEMENT PLANBackground Documents · PDF13 May 2026View
(SUPERSEDED) BIODIVERSITY GAIN PLANBackground Documents · PDF13 May 2026View
ASSESSMENT OF BIODIVERSITY NET GAINBackground Documents · PDF13 May 2026View
STATUTORY METRICBackground Documents · PDF13 May 2026View
UPDATED PRELIMINARY ECOLOGICAL APPRAISALBackground Documents · PDF13 May 2026View
DRAINAGE CALCULATIONSBackground Documents · PDF13 May 2026View
DRAINAGE MAINTENANCE & MANAGEMENT SCHEDULEBackground Documents · PDF13 May 2026View
(SUPERSEDED) HYDROBRAKE DETAILSDrawing · PDF13 May 2026View
AFFORDABLE HOUSING STATEMENTBackground Documents · PDF13 May 2026View
ARBORICULTURAL SURVEYBackground Documents · PDF13 May 2026View
ARBORICULTURAL IMPACT ASSESSMENT AND ARBORICULTURAL METHOD STATEMENTBackground Documents · PDF13 May 2026View
(SUPERSEDED) EMPLOYMENT AND TRAINING SCHEMEBackground Documents · PDF13 May 2026View
(SUPERSEDED) ENGINEERING LAYOUTDrawing · PDF13 May 2026View
(SUPERSEDED) SURFACE FINISHES AND KERBSDrawing · PDF13 May 2026View
(SUPERSEDED) MANHOLE SCHEDULESBackground Documents · PDF13 May 2026View
(SUPERSEDED) HARDSTANDING AREASDrawing · PDF13 May 2026View
(SUPERSEDED) GULLY CATCHMENT PLANDrawing · PDF13 May 2026View
(SUPERSEDED) PLOTWORKS DRAINAGE SHEET 1Drawing · PDF13 May 2026View
(SUPERSEDED) PLOTWORKS DRAINAGE SHEET 2Drawing · PDF13 May 2026View
(SUPERSEDED) DRAINAGE DETAILSDrawing · PDF13 May 2026View
(SUPERSEDED) SUDS DETAILSDrawing · PDF13 May 2026View
(SUPERSEDED) FLOOD ROUTING PLANDrawing · PDF13 May 2026View
(SUPERSEDED) ADOPTABLE ROAD AND SEWER LONG SECTIONS SHEET 1Drawing · PDF13 May 2026View
(SUPERSEDED) ADOPTABLE ROAD AND SEWER LONG SECTIONS SHEET 2Drawing · PDF13 May 2026View
(SUPERSEDED) HIGHWAY SETTING OUTDrawing · PDF13 May 2026View
(SUPERSEDED) HIGHWAY SETTING OUT TABLESDrawing · PDF13 May 2026View
(SUPERSEDED) HIGHWAY DETAILSDrawing · PDF13 May 2026View
(SUPERSEDED) PLOTWORKS EXTERNAL LEVELS SHEET 1Drawing · PDF13 May 2026View
(SUPERSEDED) PLOTWORKS EXTERNAL LEVELS SHEET 2Drawing · PDF13 May 2026View
(SUPERSEDED) SWEPT PATH ANALYSIS REFUSE VEHICLE AND LUXURY 4X4Drawing · PDF13 May 2026View
(SUPERSEDED) CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLANBackground Documents · PDF13 May 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.