Council planning record

Discharge of conditions 7 (Badger survey), 14 (Land levels), 15 (Contamination), 18 (Discharge of surface water), 30 (Management of surface water drainage), 31 (Flood storage), 32 (Drainage hierarchy) and 37 (Written Scheme of Investigation) of application CHE/21/00554/OUT- Outline planning application for erection of warehouse units (Class B2/B8) up to 68,000 sq. m gross, with ancillary office accommodation; construction of new access road; provision of service yards and internal vehicle circulation and parking areas; erection of covered cycle parking areas, pump house and sprinkler tank, gate houses and perimeter fencing; associated drainage works, site levelling and landscaping; and realignment of existing public right of way

Land At North East To Markham Vale and Employment Site and M1 and The South West Of B6419 Seymour Link Road Woodthorpe Chesterfield Derbyshire

DecidedReference: CHE/25/00043/DOCChesterfield Borough Council

Last published check: 14 Oct 2026, 07:25. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Issued Date

    Published milestoneCouncil source
  5. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided
Application type
Discharge of Conditions
Received
24 Jan 2025
Validated
30 Jan 2025
Determination deadline
27 Mar 2025
Local authority
Chesterfield Borough Council

Application overview

Discharge of conditions 7 (Badger survey), 14 (Land levels), 15 (Contamination), 18 (Discharge of surface water), 30 (Management of surface water drainage), 31 (Flood storage), 32 (Drainage hierarchy) and 37 (Written Scheme of Investigation) of application CHE/21/00554/OUT- Outline planning application for erection of warehouse units (Class B2/B8) up to 68,000 sq. m gross, with ancillary office accommodation; construction of new access road; provision of service yards and internal vehicle circulation and parking areas; erection of covered cycle parking areas, pump house and sprinkler tank, gate houses and perimeter fencing; associated drainage works, site levelling and landscaping; and realignment of existing public right of way

Proposal details

Reference
CHE/25/00043/DOC
Ward
Staveley North
Parish
Staveley Town Council
Agent
Peacock and Smith

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Land At North East To Markham Vale and Employment Site and M1 and The South West Of B6419 Seymour Link Road Woodthorpe Chesterfield Derbyshire

This record has no verified map location.

View council map

Documents 44 of 44

DocumentPublishedAction
DECISION LETTERDecision Notice · PDF30 Dec 2025View
UPDATE LETTERCorrespondence · PDF30 Jul 2025View
LEAD LOCAL FLOOD AUTHORITY COMMENTSConsultee Comment · PDF18 Jun 2025View
RESPONSE TO LLFA COMMENTSCorrespondence · PDF16 Jun 2025View
NORTHERN CATCHMENT FEH RESULTS 2025 (1 YEAR FEH 1999) - DRAINAGE CALCULATIONBackground Documents · PDF16 Jun 2025View
NORTHERN CATCHMENT FSR RESULTS 2025 (1 YEAR) - DRAINAGE CALCULATIONBackground Documents · PDF16 Jun 2025View
SOUTHERN CATCHMENT FEH RESULTS 2025 (1 YEAR FEH 1999) - DRAINAGE CALCULATIONBackground Documents · PDF16 Jun 2025View
SOUTHERN CATCHMENT FEH RESULTS 2025 ( 1 YEAR) - DRAINAGE CALCULATIONBackground Documents · PDF16 Jun 2025View
NORTHERN CATCHMENT FSR RESULTS 2025 - DRAINAGE CALCULATIONBackground Documents · PDF16 Jun 2025View
SOUTHERN CATCHMENT FEH RESULTS 2025 - DRAINAGE CALCULATIONBackground Documents · PDF16 Jun 2025View
SOUTHERN CATCHMENT FSR RESULTS 2025 - DRAINAGE CALCULATIONBackground Documents · PDF16 Jun 2025View
NORTHERN CATCHMENT FEH RESULTS 2025 - DRAINAGE CALCULATIONBackground Documents · PDF16 Jun 2025View
LLFA COMMENTSConsultee Comment · PDF12 Jun 2025View
SITE SECTION BETWEEN: GIST AND PROPOSED UNIT A. UNIT A CONTEXT ELEVATION AND SECRevised Drawing · PDF10 Jun 2025View
TYPICAL SECTIONSRevised Drawing · PDF10 Jun 2025View
AGENT EMAILCorrespondence · PDF10 Jun 2025View
YORKSHIRE WATER COMMENTConsultee Comment · PDF6 Jun 2025View
UPDATE LETTERCorrespondence · PDF4 Jun 2025View
UPDATE LETTERCorrespondence · PDF22 May 2025View
CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN (UPDATED)Background Documents · PDF22 May 2025View
SITE SECTIONS LOCATION PLANRevised Drawing · PDF22 May 2025View
SITE SECTIONS SHEET 1Revised Drawing · PDF22 May 2025View
DCC COMMENTS TO BDCBackground Documents · PDF22 May 2025View
RESPONSE TO UPDATE LETTERCorrespondence · PDF22 May 2025View
BAT HIBERNATION SURVEYBackground Documents · PDF1 Apr 2025View
UPDATE LETTERCorrespondence · PDF12 Mar 2025View
DECISION LETTERDecision Notice · PDF12 Mar 2025View
COAL AUTHORITY COMMENTConsultee Comment · PDF27 Feb 2025View
DERBYSHIRE WILDLIFE TRUST COMMENTSConsultee Comment · PDF24 Feb 2025View
DCC ARCHAEOLOGY COMMENTConsultee Comment · PDF18 Feb 2025View
ENVIRONMENTAL HEALTH OFFICERConsultee Comment · PDF11 Feb 2025View
APPLICATIONFORMApplication Form · PDF24 Jan 2025View
PLOT A AND HIGHWAYS FINISHED LEVELS PLANDrawing · PDF24 Jan 2025View
PLOT B AND FLOOD COMPENSATION ZONE FINISHED LEVELS PLANDrawing · PDF24 Jan 2025View
PHASE 2 GEO-ENVIRONMENTAL ASSESSMENT PART 1Background Documents · PDF24 Jan 2025View
PHASE 2 GEO-ENVIRONMENTAL ASSESSMENT PART 2Background Documents · PDF24 Jan 2025View
PHASE 2 GEO-ENVIRONMENTAL ASSESSMENT PART 3Background Documents · PDF24 Jan 2025View
PLOT A AND HIGHWAYS PROPOSED DRAINAGE STRATEGY PLANDrawing · PDF24 Jan 2025View
PLOT B AND FLOOD COMPENSATION ZONE PROPOSED DRAINAGE STRATEGY PLANDrawing · PDF24 Jan 2025View
FLOOD RISK ASSESSMENTBackground Documents · PDF24 Jan 2025View
SUSTAINABLE DRAINAGE STATEMENTBackground Documents · PDF24 Jan 2025View
WRITTEN SCHEME OF INVESTIGATIONBackground Documents · PDF24 Jan 2025View
SUDS OPERATION AND MAINTENANCE PLANBackground Documents · PDF24 Jan 2025View
COVER LETTERCorrespondence · PDF24 Jan 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Partial Discharge of Condition
DECISION LETTER DECISION LETTER

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.