Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Land South Of Worksop Road Mastin Moor Chesterfield Derbyshire
Last published check: 14 Oct 2026, 08:00. Check the council record for more recent changes.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceDischarge of conditions 5 (Phasing scheme), 6 (Delivery of Local Centre),7 (Delivery strategy),11 (Design Code/Framework),16 (Scheme to improve pedestrian connectivity with Bolsover Road),17 (Construction Management Plan), 18 (Construction details of estate roads), 20 (Highways details),23 (Disposal of highway surface water),25 (Management of streets) ,31 (Outfall of surface water), 32 (Disposal of on and off site foul surface water sewerage),33 (Drainage investigations),34 (Drainage hierarchy),35 (Avoidance of additional surface water run-off),36 (Attenuation ponds),38 (Site investigations) ,39 (Findings of site investigations),40 (Desktop study and remedial works),41 (Habitat metric),44 (Badger survey),45 (Construction Environmental Management Plan),46 (Badger protection measures),47 (Landscape and ecological management plan),49 (Tree protection plan and arboricultural method statement),51 (Management of public areas),52 (Written Scheme of Investigation),53 (Employment and Training Scheme),55 (Materials),56 (Land levels),57 (In accordance with noise and vibration assessment) and 58 (Sustainability statement) of application CHE/20/00700/OUT- Residential development of up to 650 dwellings, a residential care facility with extra care, a Local Centre (including local retail, health facilities,leisure facilities, other local facilities and services, offices), open space, community garden extension, community building, parking andassociated infrastructure and earthworks
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsLand South Of Worksop Road Mastin Moor Chesterfield Derbyshire
This record has no verified map location.
View council map| Document | Published | Action |
|---|---|---|
| DECISION LETTER ARCHAEOLOGY WHOLE SITE CONDITION 52Decision Notice · PDF | 24 Feb 2026 | View |
| DCC ARCHAEOLOGIST COMMENTSConsultee Comment · PDF | 4 Feb 2026 | View |
| DECISION LETTERDecision Notice · PDF | 4 Feb 2026 | View |
| DECISIONDecision Notice · PDF | 29 Jan 2026 | View |
| LLFA COMMENTSConsultee Comment · PDF | 2 Jan 2026 | View |
| CATCH PIT DETAILRevised Drawing · PDF | 16 Dec 2025 | View |
| PHASE 2 BASIN DETAILS AND SECTIONSRevised Drawing · PDF | 16 Dec 2025 | View |
| DRAINAGE CATCHMENT AREAS PLANRevised Drawing · PDF | 16 Dec 2025 | View |
| PHASE 1 INFRASTRUCTURE DRAINAGE DETAILSRevised Drawing · PDF | 16 Dec 2025 | View |
| PHASE 2 INFRASTRUCTURE DRAINAGE DETAILSRevised Drawing · PDF | 16 Dec 2025 | View |
| HYDRAULIC MODEL EXTENTSRevised Drawing · PDF | 16 Dec 2025 | View |
| EXCEEDANCE FLOW ROUTESRevised Drawing · PDF | 16 Dec 2025 | View |
| DRAINAGE CALCS - ? 22188-IML-PH1-XX-FLOW-SW FEH P17Background Documents · PDF | 16 Dec 2025 | View |
| AGENT RE REVISIONSCorrespondence · PDF | 16 Dec 2025 | View |
| LEAD LOCAL FLOOD AUTHORITY COMMENTSConsultee Comment · PDF | 14 Oct 2025 | View |
| LLFA EMAILConsultee Comment · PDF | 14 Oct 2025 | View |
| TECHNICAL NOTE RESPONSE TO PLANNING COMMENTSCorrespondence · PDF | 5 Sept 2025 | View |
| HYDRAULIC MODEL EXTENTSDrawing · PDF | 5 Sept 2025 | View |
| SPINE ROAD FEH P16Background Documents · PDF | 5 Sept 2025 | View |
| PH2 FEH P9Background Documents · PDF | 5 Sept 2025 | View |
| PHASE 2 EXTENT OF HYDRAULIC MODELDrawing · PDF | 5 Sept 2025 | View |
| HYDRAULIC MODELLING REPORTBackground Documents · PDF | 5 Sept 2025 | View |
| INFRASTRUCTURE DRAINAGE DETAILS PHASE 1Drawing · PDF | 5 Sept 2025 | View |
| INFRASTRUCTURE DRAINAGE DETAIL PHASE 2Drawing · PDF | 5 Sept 2025 | View |
| LEAD LOCAL FLOOD AUTHORITY COMMENTSConsultee Comment · PDF | 11 Jun 2025 | View |
| DRAINAGE VALIDATION REPORT V2Background Documents · PDF | 7 Apr 2025 | View |
| AGENT EMAILCorrespondence · PDF | 7 Apr 2025 | View |
| EMAILS CONFIRMING SHAFT CLOSURE RE PERMIT 28901Background Documents · PDF | 3 Apr 2025 | View |
| AGENT RE COND. 38 & 39Correspondence · PDF | 3 Apr 2025 | View |
| AGENT RE COND. 38 & 39Correspondence · PDF | 15 Jan 2025 | View |
| SHAFT DRILLING REPORTBackground Documents · PDF | 15 Jan 2025 | View |
| EMAILS MRA-DG RE MINESHAFT REMEDIATION DECEMBERBackground Documents · PDF | 15 Jan 2025 | View |
| COAL AUTHORITY PERMITBackground Documents · PDF | 15 Jan 2025 | View |
| AGENT RE CONDITION 52 / ARCHAEOLOGYCorrespondence · PDF | 30 Sept 2024 | View |
| AGENT RE CONDITION 52 PART A,B,CCorrespondence · PDF | 30 Sept 2024 | View |
| ADDENDUM TO POST-EXCAVATION ASSESSMENT & UPDATED PROJECT DESIGNBackground Documents · PDF | 30 Sept 2024 | View |
| COAL AUTHORITY COMMENTConsultee Comment · PDF | 10 Sept 2024 | View |
| SHAFT SEARCH LETTERBackground Documents · PDF | 27 Aug 2024 | View |
| MINE ENTRY TREATMENT SPECBackground Documents · PDF | 27 Aug 2024 | View |
| AGENT RE COAL/COND. 38 & 39Correspondence · PDF | 27 Aug 2024 | View |
| MINING SURVEY DATADrawing · PDF | 2 Aug 2024 | View |
| PHASE 1 ENABLING WORKS DRAINAGERevised Drawing · PDF | 9 Jul 2024 | View |
| AGENT RE COND. 33 & 36Correspondence · PDF | 8 Jul 2024 | View |
| RESPONSE TO LLFABackground Documents · PDF | 8 Jul 2024 | View |
| EXTENTS OF LAND OWNERSHIP BOUNDARYRevised Drawing · PDF | 8 Jul 2024 | View |
| DRAINAGE CATCHMENT AREAS PLANRevised Drawing · PDF | 8 Jul 2024 | View |
| PHASE 2 ENABLING WORKS DRAINAGERevised Drawing · PDF | 8 Jul 2024 | View |
| S38 DRAINAGE PLANRevised Drawing · PDF | 8 Jul 2024 | View |
| DRAINAGE CALCULATIONS 1Background Documents · PDF | 8 Jul 2024 | View |
| DRAINAGE CALCULATIONS 2Background Documents · PDF | 8 Jul 2024 | View |
| PHASE1 BASIN DETAILS AND SECTIONSRevised Drawing · PDF | 8 Jul 2024 | View |
| PHASE2 BASIN DETAILS AND SECTIONSRevised Drawing · PDF | 8 Jul 2024 | View |
| LANDSCAPE & ECOLOGY MANAGEMENT PLAN (REVISED)Background Documents · PDF | 2 Jul 2024 | View |
| AGENT RE COND. 47 / LEMPCorrespondence · PDF | 2 Jul 2024 | View |
| UPDATE LETTERCorrespondence · PDF | 17 Jun 2024 | View |
| OFFICER EMAIL RE COND. 33 & 36Correspondence · PDF | 17 Jun 2024 | View |
| DCC HIGHWAYS COMMENTConsultee Comment · PDF | 14 Jun 2024 | View |
| LEAD LOCAL FLOOD AUTHORITY COMMENTSPublic Comment · PDF | 14 Jun 2024 | View |
| TYPICAL GATEWAYS - DRYSTONE WALL DETAILRevised Drawing · PDF | 3 Jun 2024 | View |
| STONE SPECIFICATION SHEETBackground Documents · PDF | 3 Jun 2024 | View |
| AGENT RE COND. 55Correspondence · PDF | 3 Jun 2024 | View |
| COAL AUTHORITY COMMENTConsultee Comment · PDF | 1 May 2024 | View |
| COAL AUTHORITY COMMENTConsultee Comment · PDF | 30 Apr 2024 | View |
| LETTER RE COAL SHAFT 445375-007Background Documents · PDF | 17 Apr 2024 | View |
| AGENT RE COAL AUTHORITY CONCERNSCorrespondence · PDF | 17 Apr 2024 | View |
| DERBYSHIRE WILDLIFE TRUST COMMENTSConsultee Comment · PDF | 9 Apr 2024 | View |
| UPDATE LETTERCorrespondence · PDF | 28 Mar 2024 | View |
| COAL AUTHORITY COMMENTConsultee Comment · PDF | 21 Mar 2024 | View |
| MINESHAFT PROBING LETTER REPORTBackground Documents · PDF | 6 Mar 2024 | View |
| AGENT RE MINESHAFT PROBINGCorrespondence · PDF | 6 Mar 2024 | View |
| OFFICER COMMENT ON CONDITION 5, SECOND PHASING SCHEMECorrespondence · PDF | 19 Feb 2024 | View |
| AGENT RE COND. 5Correspondence · PDF | 26 Jan 2024 | View |
| AGENT SUMMARY OF CONDITIONSCorrespondence · PDF | 22 Jan 2024 | View |
| ENVIRONMENTAL HEALTH OFFICERConsultee Comment · PDF | 10 Jan 2024 | View |
| UPDATE LETTERCorrespondence · PDF | 3 Jan 2024 | View |
| COAL AUTHORITY COMMENTConsultee Comment · PDF | 28 Dec 2023 | View |
| DESIGN CODE (REVISED)Background Documents · PDF | 13 Dec 2023 | View |
| AGENT DESIGN CODE CHANGES TABLECorrespondence · PDF | 13 Dec 2023 | View |
| AGENT RE COND. 34Correspondence · PDF | 13 Dec 2023 | View |
| AGENT RE COND. 35Correspondence · PDF | 13 Dec 2023 | View |
| AGENT RE COND. 38 & 39Correspondence · PDF | 13 Dec 2023 | View |
| INVESTIGATION OF MINE ENTRY LETTERBackground Documents · PDF | 13 Dec 2023 | View |
| LEAD LOCAL FLOOD AUTHORITY COMMENTSConsultee Comment · PDF | 1 Dec 2023 | View |
| AGENT RE COND. 117Correspondence · PDF | 8 Nov 2023 | View |
| CONSTRUCTION MANAGEMENT PLAN (ISSUE 3)Background Documents · PDF | 8 Nov 2023 | View |
| TEMPORARY SW SILT MANAGEMENT STRATEGYRevised Drawing · PDF | 6 Nov 2023 | View |
| AGENT RE COND. 35Correspondence · PDF | 6 Nov 2023 | View |
| AGENT EMAIL RE CONDITION 11Correspondence · PDF | 3 Nov 2023 | View |
| AGENT RE CONDITION 16Correspondence · PDF | 3 Nov 2023 | View |
| AGENT RE COND. 45Correspondence · PDF | 3 Nov 2023 | View |
| AGENT RE COND. 47Correspondence · PDF | 3 Nov 2023 | View |
| AGENT RE COND. 56Correspondence · PDF | 3 Nov 2023 | View |
| COAL AUTHORITY COMMENTConsultee Comment · PDF | 17 Oct 2023 | View |
| UPDATE LETTERCorrespondence · PDF | 12 Oct 2023 | View |
| ENVIRONMENTAL HEALTH OFFICERConsultee Comment · PDF | 10 Oct 2023 | View |
| YORKSHIRE WATER COMMENTConsultee Comment · PDF | 6 Oct 2023 | View |
| FOUL WATER FLOW GENERATION REV B - PHASES 1 & 2Background Documents · PDF | 2 Oct 2023 | View |
| PS FLOWS AND VOLUMESBackground Documents · PDF | 2 Oct 2023 | View |
| AGENT RE COND. 32Correspondence · PDF | 2 Oct 2023 | View |
| HYDRAULIC MODELLING REPORT REV ABackground Documents · PDF | 2 Oct 2023 | View |
| AGENT RE COND. 33Correspondence · PDF | 2 Oct 2023 | View |
| PARAMETER PLAN - PHASING STRATEGYRevised Drawing · PDF | 28 Sept 2023 | View |
| AGENT RE CONDITION 5 - PHASINGCorrespondence · PDF | 28 Sept 2023 | View |
| YORKSHIRE WATER AUTHORITY COMMENTSConsultee Comment · PDF | 12 Sept 2023 | View |
| AGENT RE CONDITION 33Correspondence · PDF | 31 Aug 2023 | View |
| WATERCOURSE CONDITION CR-22188-23-292Background Documents · PDF | 31 Aug 2023 | View |
| LLFA DRAINAGE CALCULATIONS GUIDEConsultee Comment · PDF | 18 Aug 2023 | View |
| LEAD LOCAL FLOOD AUTHORITY COMMENTSConsultee Comment · PDF | 18 Aug 2023 | View |
| EXISTING UTILITIES - PHOTO REPORTBackground Documents · PDF | 18 Aug 2023 | View |
| EXISTING UTILITIES - RISING MAIN MASTERBackground Documents · PDF | 18 Aug 2023 | View |
| EXISTING UTILITIES - REPORT MASTER FINALBackground Documents · PDF | 18 Aug 2023 | View |
| COMBINED STAGE 1 & 2 ROAD SAFETY AUDITBackground Documents · PDF | 18 Aug 2023 | View |
| ACCESS GENERAL ARRANGEMENT & INDICATIVE DRAINAGE LAYOUTRevised Drawing · PDF | 18 Aug 2023 | View |
| STANDARD DETAILSRevised Drawing · PDF | 18 Aug 2023 | View |
| PROPOSED PAVEMENT, ROAD MARKINGS, KERBING & SITE CLEARANCERevised Drawing · PDF | 18 Aug 2023 | View |
| INDICATIVE MASTERPLANRevised Drawing · PDF | 18 Aug 2023 | View |
| COMBINED STAGE 1 AND STAGE 2 ROAD SAFETY AUDITBackground Documents · PDF | 18 Aug 2023 | View |
| S278 BOLSOVER ROAD MASTIN MOOR - PHASE 1 - DA3Background Documents · PDF | 18 Aug 2023 | View |
| SUDS MANAGEMENT & MAINTENANCEBackground Documents · PDF | 18 Aug 2023 | View |
| CMP APDX A - INDICATIVE MPBackground Documents · PDF | 17 Aug 2023 | View |
| S38 DRAINAGE PLANRevised Drawing · PDF | 17 Aug 2023 | View |
| S38 GENERAL ARRANGEMENTRevised Drawing · PDF | 17 Aug 2023 | View |
| PROPOSED CONTOURS PH1 ENABLING WORKS AND PH2Revised Drawing · PDF | 17 Aug 2023 | View |
| ISOPACHYTE PH1 ENABLING WORKS AND PH2Revised Drawing · PDF | 17 Aug 2023 | View |
| EARTHWORKS PROPOSED SITE SECTIONS SHEET 1Revised Drawing · PDF | 17 Aug 2023 | View |
| EARTHWORKS PROPOSED SITE SECTIONS SHEET 2Revised Drawing · PDF | 17 Aug 2023 | View |
| APPLICATION BOUNDARYRevised Drawing · PDF | 17 Aug 2023 | View |
| COMPOUND PLANRevised Drawing · PDF | 17 Aug 2023 | View |
| PHASE 1 ENABLING WORKS DRAINAGERevised Drawing · PDF | 17 Aug 2023 | View |
| PHASE 2 ENABLING WORKS DRAINAGERevised Drawing · PDF | 17 Aug 2023 | View |
| MANHOLE SCHEDULERevised Drawing · PDF | 17 Aug 2023 | View |
| INFRASTRUCTURE DRAINAGE LONG SECTIONSRevised Drawing · PDF | 17 Aug 2023 | View |
| INFRASTRUCTURE DRAINAGE DETAILSRevised Drawing · PDF | 17 Aug 2023 | View |
| T03 DRAINAGE LS AND MH SCHEDRevised Drawing · PDF | 17 Aug 2023 | View |
| S38 HIGHWAY LONG SECTIONS 1 OF 2Revised Drawing · PDF | 17 Aug 2023 | View |
| S38 HIGHWAY LONG SECTIONS 2 OF 2Revised Drawing · PDF | 17 Aug 2023 | View |
| S38 KERBING & SURFACINGRevised Drawing · PDF | 17 Aug 2023 | View |
| S38 DETAILSRevised Drawing · PDF | 17 Aug 2023 | View |
| LANDSCAPE MASTERPLANRevised Drawing · PDF | 17 Aug 2023 | View |
| LANDSCAPE GA PLAN SHEET 1 OF 4Revised Drawing · PDF | 17 Aug 2023 | View |
| LANDSCAPE GA PLAN SHEET 2 OF 4Revised Drawing · PDF | 17 Aug 2023 | View |
| LANDSCAPE GA PLAN SHEET 3 OF 4Revised Drawing · PDF | 17 Aug 2023 | View |
| LANDSCAPE GA PLAN SHEET 4 OF 4Revised Drawing · PDF | 17 Aug 2023 | View |
| PATH MOUND INTERFACE DETAILRevised Drawing · PDF | 17 Aug 2023 | View |
| GATEWAYS - ENTRANCE 1-6Revised Drawing · PDF | 17 Aug 2023 | View |
| GATEWAYS - ENTRANCE 7-10Revised Drawing · PDF | 17 Aug 2023 | View |
| LANDSCAPE SOFTWORKS SHEET 1 OF 4Revised Drawing · PDF | 17 Aug 2023 | View |
| LANDSCAPE SOFTWORKS SHEET 2 OF 4Revised Drawing · PDF | 17 Aug 2023 | View |
| LANDSCAPE SOFTWORKS SHEET 3 OF 4Revised Drawing · PDF | 17 Aug 2023 | View |
| LANDSCAPE SOFTWORKS SHEET 4 OF 4Revised Drawing · PDF | 17 Aug 2023 | View |
| PLANTING DETAILSRevised Drawing · PDF | 17 Aug 2023 | View |
| PLANTING SCHEDULERevised Drawing · PDF | 17 Aug 2023 | View |
| LANDSCAPE SPECIFICATIONBackground Documents · PDF | 17 Aug 2023 | View |
| LANDSCAPE MANAGEMENT AND MAINTENANCE PLANBackground Documents · PDF | 17 Aug 2023 | View |
| HIGHWAY GENERAL ARRANGEMENTRevised Drawing · PDF | 17 Aug 2023 | View |
| CMP APDX E - CONTRACTOR COMPOUND AND HAUL ROAD PLANRevised Drawing · PDF | 16 Aug 2023 | View |
| CONSTRUCTION MANAGEMENT PLAN (ISSUE 2)Background Documents · PDF | 16 Aug 2023 | View |
| CMP APDX B - LANDSCAPE MASTERPLANRevised Drawing · PDF | 16 Aug 2023 | View |
| CMP APDX C - PHASING PLAN P01Revised Drawing · PDF | 16 Aug 2023 | View |
| CMP APDX D - DEVELOPMENT PROGRAMMEBackground Documents · PDF | 16 Aug 2023 | View |
| YORKSHIRE WATER COMMENTConsultee Comment · PDF | 26 Jul 2023 | View |
| DCC HIGHWAYS FURTHER COMMENTConsultee Comment · PDF | 13 Jul 2023 | View |
| DCC HIGHWAYS COMMENTConsultee Comment · PDF | 12 Jul 2023 | View |
| EMAIL RE COND. 11 - DESIGN CODECorrespondence · PDF | 11 Jul 2023 | View |
| S38 GENERAL ARRANGEMENTRevised Drawing · PDF | 11 Jul 2023 | View |
| AGENT RE S38 GA, CONDS. 18, 20, 23Correspondence · PDF | 11 Jul 2023 | View |
| AGENT RE COND. 32Correspondence · PDF | 11 Jul 2023 | View |
| FOUL AND SURFACE WATER SEWERAGE - STATEMENTBackground Documents · PDF | 11 Jul 2023 | View |
| LANDSCAPE & ECOLOGY MANAGEMENT PLAN (REVISED)Background Documents · PDF | 11 Jul 2023 | View |
| AMENDED DESIGN CODE/FRAMEWORKBackground Documents · PDF | 10 Jul 2023 | View |
| EARTHWORKS PROPOSED SITE SECTIONSRevised Drawing · PDF | 10 Jul 2023 | View |
| AGENT RE COND. 45Correspondence · PDF | 10 Jul 2023 | View |
| CEMP ? BIODIVERSITY UPDATED JUL 23Background Documents · PDF | 10 Jul 2023 | View |
| LANDSCAPE MANAGEMENT & MAINTENANCE PLAN (REVISED)Background Documents · PDF | 10 Jul 2023 | View |
| LANDSCAPING DELIVERY PHASES 1 AND 2 10-7-23Revised Drawing · PDF | 10 Jul 2023 | View |
| LANDSCAPE GA PLAN - FRONTING BOLSOVER RD & ESTATE RDRevised Drawing · PDF | 10 Jul 2023 | View |
| AGENT RE COND. 51Correspondence · PDF | 10 Jul 2023 | View |
| AGENT EMAIL TO LLFACorrespondence · PDF | 30 Jun 2023 | View |
| ECONOMIC DEVELOPMENT COMMENTConsultee Comment · PDF | 29 Jun 2023 | View |
| AGENT RE CONDITION 53 & ECONOMIC DEVELOPMENTCorrespondence · PDF | 27 Jun 2023 | View |
| EDU COMMENT ON RESERVED MATTERS APPLICATION 18.4.23Background Documents · PDF | 27 Jun 2023 | View |
| DERBYSHIRE WILDLIFE TRUSTConsultee Comment · PDF | 13 Jun 2023 | View |
| DERBYSHIRE SWIFT CONSERVATIONPublic Comment · PDF | 10 Jun 2023 | View |
| UPDATE LETTERCorrespondence · PDF | 9 Jun 2023 | View |
| TREE OFFICER COMMENTConsultee Comment · PDF | 28 Apr 2023 | View |
| YORKSHIRE WATER COMMENTConsultee Comment · PDF | 24 Apr 2023 | View |
| MRS NYREE CLARKPublic Comment · PDF | 22 Apr 2023 | View |
| DCC ARCHAEOLOGIST COMMENTConsultee Comment · PDF | 21 Apr 2023 | View |
| EXISTING UTILITIES- PHOTO REPORTBackground Documents · PDF | 31 Mar 2023 | View |
| EXISTING UTILITIES- RAISING MAIN MASTERBackground Documents · PDF | 31 Mar 2023 | View |
| EXISTING UTILITIES- REPORTBackground Documents · PDF | 31 Mar 2023 | View |
| INDICATIVE MASTERPLANDrawing · PDF | 31 Mar 2023 | View |
| PROPOSED BOLSOVER ROAD SITE ACCESS STAGE 1 AND 2 ROAD SAFETY AUDITBackground Documents · PDF | 31 Mar 2023 | View |
| APPLICATIONFORMREDACTEDApplication Form · PDF | 24 Mar 2023 | View |
| APPENDIX C- PHASING PLANDrawing · PDF | 24 Mar 2023 | View |
| C5 - PHASING SCHEME - STATEMENTBackground Documents · PDF | 24 Mar 2023 | View |
| PARAMETER PLANS- PHASINGDrawing · PDF | 24 Mar 2023 | View |
| C6 - PROGRAMME FOR DELIVERY OF THE LOCAL CENTRE - STATEMENTBackground Documents · PDF | 24 Mar 2023 | View |
| LOCAL CENTRE DELIVERY PROGRAMME REV BBackground Documents · PDF | 24 Mar 2023 | View |
| C7 - STRATEGY FOR DELIVERY OF ADOPTABLE AND ACCESSIBLE DWELLINGS STATEMENTBackground Documents · PDF | 24 Mar 2023 | View |
| C11- DESIGN CODE STATEMENTBackground Documents · PDF | 24 Mar 2023 | View |
| DESIGN CODEBackground Documents · PDF | 24 Mar 2023 | View |
| C16- PEDESTRIAN CONNECTIVITY SCHEME STATEMENTBackground Documents · PDF | 24 Mar 2023 | View |
| ACCESS GENERAL ARRANGEMENT AND INDICATIVE DRAINAGE LAYOUTDrawing · PDF | 24 Mar 2023 | View |
| STANDARD DETAILSDrawing · PDF | 24 Mar 2023 | View |
| PAVEMENT AND SITE CLEARANCEDrawing · PDF | 24 Mar 2023 | View |
| PROPOSED CONTOURS AND PROPOSED PROFILEDrawing · PDF | 24 Mar 2023 | View |
| APPENDIX A - INDICATIVE MASTERPLANDrawing · PDF | 24 Mar 2023 | View |
| APPENDIX B - LANDSCAPE MASTERPLANDrawing · PDF | 24 Mar 2023 | View |
| APPENDIX D - DEVELOPMENT PROGRAMME REV JBackground Documents · PDF | 24 Mar 2023 | View |
| APPENDIX E - MAIN CONTRACTOR COMPOUND LOCATION PLANDrawing · PDF | 24 Mar 2023 | View |
| C17- CONSTRUCTION MANAGEMENT PLAN STATEMENTBackground Documents · PDF | 24 Mar 2023 | View |
| CONSTRUCTION MANAGEMENT PLAN PHASE 1 AND 2Background Documents · PDF | 24 Mar 2023 | View |
| C18- CONSTRUCTION DETAILS OF RESIDENTIAL ESTATE ROADS AND FOOTWAYS STATEMENTBackground Documents · PDF | 24 Mar 2023 | View |
| C20- SAFETY AUDIT - STATEMENTBackground Documents · PDF | 24 Mar 2023 | View |
| C23- DISPOSAL OF HIGHWAY SURFACE WATER STATEMENTBackground Documents · PDF | 24 Mar 2023 | View |
| C25- MANAGEMENT AND MAINTENANCE OF STREETS STATEMENTBackground Documents · PDF | 24 Mar 2023 | View |
| ROAD MAINTENANCE AND ADOPTION - REV 1Background Documents · PDF | 24 Mar 2023 | View |
| C31- DISCHARGE OF SURFACE WATER STATEMENTBackground Documents · PDF | 24 Mar 2023 | View |
| C32- FOUL AND SURFACE WATER SEWERAGE STATEMENTBackground Documents · PDF | 24 Mar 2023 | View |
| GENERAL ARRANGEMENT OF PUMPS WITH PIPEWORK, VALVES AND CONTROLSDrawing · PDF | 24 Mar 2023 | View |
| GENERAL ARRANGEMENT OF PUMPS WITH PIPEWORK, VALVES AND CONTROLSDrawing · PDF | 24 Mar 2023 | View |
| SUDS MANAGEMENT AND MAINTENANCEBackground Documents · PDF | 24 Mar 2023 | View |
| C33- MINE DRAINAGE STATEMENTBackground Documents · PDF | 24 Mar 2023 | View |
| C34 - DRAINAGE HIERARCHY - STATEMENTBackground Documents · PDF | 24 Mar 2023 | View |
| C35 - AVOIDANCE OF ADDITIONAL SURFACE WATER RUN-OFFBackground Documents · PDF | 24 Mar 2023 | View |
| PHASE 1 ENABLING WORKS DRAINAGEDrawing · PDF | 24 Mar 2023 | View |
| PHASE 2 ENABLING WORKS DRAINAGEDrawing · PDF | 24 Mar 2023 | View |
| S38 DRAINAGE PLANDrawing · PDF | 24 Mar 2023 | View |
| C36 - ATTENUATION PONDS - STATEMENTBackground Documents · PDF | 24 Mar 2023 | View |
| C38- SCHEME OF INTRUSIVE SITE INVESTIGATIONS STATEMENTBackground Documents · PDF | 24 Mar 2023 | View |
| C39 - INTRUSIVE SITE INVESTIGATIONS - FINDINGS STATEMENTBackground Documents · PDF | 24 Mar 2023 | View |
| C40 - SITE INVESTIGATION AND REMEDIATION - STATEMENTBackground Documents · PDF | 24 Mar 2023 | View |
| C41 - BIODIVERSITY NET GAIN - STATEMENTBackground Documents · PDF | 24 Mar 2023 | View |
| BIODIVERSITY METRICBackground Documents | 24 Mar 2023 | View |
| C44 - BADGER SURVEY AND MITIGATION - STATEMENTBackground Documents · PDF | 24 Mar 2023 | View |
| CONSTRUCTION ENVIRONMENT MANAGEMENT PLAN (CEMP) PHASE 1 AND 2Background Documents · PDF | 24 Mar 2023 | View |
| C46 - BADGER PROTECTION MEASURES - STATEMENTBackground Documents · PDF | 24 Mar 2023 | View |
| C47 - LANDSCAPE AND ECOLOGICAL MANAGEMENT PLAN - STATEMENTBackground Documents · PDF | 24 Mar 2023 | View |
| PHASE 1 AND 2 LANDSCAPE ECOLOGICAL MANAGEMENT PLANBackground Documents · PDF | 24 Mar 2023 | View |
| C49 - TREES HEDGEROWS AND HABITATS PROTECTION - STATEMENTBackground Documents · PDF | 24 Mar 2023 | View |
| C51 - LANDSCAPING MANAGEMENT AND MAINTENANCE - STATEMENTBackground Documents · PDF | 24 Mar 2023 | View |
| LANDSCAPE MANAGEMENT AND MAINTENANCE PLANBackground Documents · PDF | 24 Mar 2023 | View |
| WRITTEN SCHEME OF INVESTIGATION FOR ARCHAEOLOGICAL EVALUATIONBackground Documents · PDF | 24 Mar 2023 | View |
| WRITTEN SCHEME OF INVESTIGATION FOR ARCHAEOLOGICAL STRIP, MAP AND RECORD WORKSBackground Documents · PDF | 24 Mar 2023 | View |
| WRITTEN SCHEME OF INVESTIGATION FOR ARCHAEOLOGICAL WATCHING BRIEF ON GROUND INVEBackground Documents · PDF | 24 Mar 2023 | View |
| C52 - ARCHAEOLOGICAL WRITTEN SCHEME OF INVESTIGATION- STATEMENTBackground Documents · PDF | 24 Mar 2023 | View |
| C53 - EMPLOYMENT AND TRAINING SCHEME - STATEMENTBackground Documents · PDF | 24 Mar 2023 | View |
| C55 - EXTERNAL MATERIALS - STATEMENTBackground Documents · PDF | 24 Mar 2023 | View |
| TYPICAL GATEWAYS - DRYSTONE WALL DETAILDrawing · PDF | 24 Mar 2023 | View |
| PROPOSED CONTOURS PH1 ENABLING WORKS AND PH2Drawing · PDF | 24 Mar 2023 | View |
| ISOPACHYTE PH1 ENABLING WORKS AND PH2Drawing · PDF | 24 Mar 2023 | View |
| C56 - EXISTING AND PROPOSED LEVELS - STATEMENTBackground Documents · PDF | 24 Mar 2023 | View |
| TOPOGRAPHICAL SURVEY- SHEET 1 OF 7Drawing · PDF | 24 Mar 2023 | View |
| TOPOGRAPHICAL SURVEY - SHEET 2 OF 7Drawing · PDF | 24 Mar 2023 | View |
| TOPOGRAPHICAL SURVEY - SHEET 3 OF 7Drawing · PDF | 24 Mar 2023 | View |
| C57 - NOISE AND VIBRATION - STATEMENTBackground Documents · PDF | 24 Mar 2023 | View |
| C58 - SUSTAINABILITY STATEMENTBackground Documents · PDF | 24 Mar 2023 | View |
| COVER LETTERCorrespondence · PDF | 24 Mar 2023 | View |
| DISCHARGE OF CONDITIONS SCHEDULEBackground Documents · PDF | 24 Mar 2023 | View |
| BIODIVERSITY NET GAIN ASSESSMENTBackground Documents · PDF | 24 Mar 2023 | View |
| C45- CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN- STATEMENTBackground Documents · PDF | 24 Mar 2023 | View |
| GEO-ENVIRONMENTAL ASSESSMENTBackground Documents · PDF | 24 Mar 2023 | View |
| GEOTECHNICAL AND GEOENVIRONMENTAL SITE INVESTIGATIONBackground Documents · PDF | 24 Mar 2023 | View |
| MINE WATER WITH PROPOSED LAYOUTDrawing · PDF | 24 Mar 2023 | View |
| TEMPORARY SURFACE WATER & SILT MANAGEMENT STRATEGYDrawing · PDF | 24 Mar 2023 | View |
| INFRASTRUCTURE PH1 MANHOLE SCHEDULEDrawing · PDF | 24 Mar 2023 | View |
| INFRASTRUCTURE DRAINAGE DETAILSDrawing · PDF | 24 Mar 2023 | View |
| INFRASTRUCTURE DRAINAGE DETAILSDrawing · PDF | 24 Mar 2023 | View |
| INFRASTRUCTURE DRAINAGE DETAILSDrawing · PDF | 24 Mar 2023 | View |
| INFRASTRUCTURE DRAINAGE DETAILS PHASE 1Drawing · PDF | 24 Mar 2023 | View |
| INFRASTRUCTURE PH1 DRAINAGE LONG SECTIONSDrawing · PDF | 24 Mar 2023 | View |
| INFRASTRUCTURE PH1 DRAINAGE LONG SECTIONSDrawing · PDF | 24 Mar 2023 | View |
| INFRASTRUCTURE PH1 DRAINAGE LONG SECTIONSDrawing · PDF | 24 Mar 2023 | View |
| INFRASTRUCTURE PH1 DRAINAGE LONG SECTIONSDrawing · PDF | 24 Mar 2023 | View |
| INFRASTRUCTURE PH2 LONGSECTION AND MANHOLE SCHEDULEDrawing · PDF | 24 Mar 2023 | View |
| SECTION 38 DETAILSDrawing · PDF | 24 Mar 2023 | View |
| LINING GADrawing · PDF | 24 Mar 2023 | View |
| PHASE 1 S38 HIGHWAY LONGSECTIONS SHEET 1 OF 2Drawing · PDF | 24 Mar 2023 | View |
| PHASE 1 S38 HIGHWAY LONGSECTIONS SHEET 2 OF 2Drawing · PDF | 24 Mar 2023 | View |
| SECTION 38 GENERAL ARRANGEMENTDrawing · PDF | 24 Mar 2023 | View |
| SECTION 38 KERBING AND SURFACINGDrawing · PDF | 24 Mar 2023 | View |
| INFRASTRUCTURE PH1 DRAINAGE LONG SECTIONSDrawing · PDF | 24 Mar 2023 | View |
Documents open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.