Council planning record

Discharge of conditions 5 (Phasing scheme), 6 (Delivery of Local Centre),7 (Delivery strategy),11 (Design Code/Framework),16 (Scheme to improve pedestrian connectivity with Bolsover Road),17 (Construction Management Plan), 18 (Construction details of estate roads), 20 (Highways details),23 (Disposal of highway surface water),25 (Management of streets) ,31 (Outfall of surface water), 32 (Disposal of on and off site foul surface water sewerage),33 (Drainage investigations),34 (Drainage hierarchy),35 (Avoidance of additional surface water run-off),36 (Attenuation ponds),38 (Site investigations) ,39 (Findings of site investigations),40 (Desktop study and remedial works),41 (Habitat metric),44 (Badger survey),45 (Construction Environmental Management Plan),46 (Badger protection measures),47 (Landscape and ecological management plan),49 (Tree protection plan and arboricultural method statement),51 (Management of public areas),52 (Written Scheme of Investigation),53 (Employment and Training Scheme),55 (Materials),56 (Land levels),57 (In accordance with noise and vibration assessment) and 58 (Sustainability statement) of application CHE/20/00700/OUT- Residential development of up to 650 dwellings, a residential care facility with extra care, a Local Centre (including local retail, health facilities,leisure facilities, other local facilities and services, offices), open space, community garden extension, community building, parking andassociated infrastructure and earthworks

Land South Of Worksop Road Mastin Moor Chesterfield Derbyshire

DecidedReference: CHE/23/00197/DOCChesterfield Borough Council

Last published check: 14 Oct 2026, 08:00. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Issued Date

    Published milestoneCouncil source
  5. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided
Application type
Discharge of Conditions
Received
24 Mar 2023
Validated
31 Mar 2023
Determination deadline
26 May 2023
Local authority
Chesterfield Borough Council

Application overview

Discharge of conditions 5 (Phasing scheme), 6 (Delivery of Local Centre),7 (Delivery strategy),11 (Design Code/Framework),16 (Scheme to improve pedestrian connectivity with Bolsover Road),17 (Construction Management Plan), 18 (Construction details of estate roads), 20 (Highways details),23 (Disposal of highway surface water),25 (Management of streets) ,31 (Outfall of surface water), 32 (Disposal of on and off site foul surface water sewerage),33 (Drainage investigations),34 (Drainage hierarchy),35 (Avoidance of additional surface water run-off),36 (Attenuation ponds),38 (Site investigations) ,39 (Findings of site investigations),40 (Desktop study and remedial works),41 (Habitat metric),44 (Badger survey),45 (Construction Environmental Management Plan),46 (Badger protection measures),47 (Landscape and ecological management plan),49 (Tree protection plan and arboricultural method statement),51 (Management of public areas),52 (Written Scheme of Investigation),53 (Employment and Training Scheme),55 (Materials),56 (Land levels),57 (In accordance with noise and vibration assessment) and 58 (Sustainability statement) of application CHE/20/00700/OUT- Residential development of up to 650 dwellings, a residential care facility with extra care, a Local Centre (including local retail, health facilities,leisure facilities, other local facilities and services, offices), open space, community garden extension, community building, parking andassociated infrastructure and earthworks

Proposal details

Reference
CHE/23/00197/DOC
Ward
Staveley North
Parish
Staveley Town Council
Agent
Planning and Design Group (UK) Limited

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Land South Of Worksop Road Mastin Moor Chesterfield Derbyshire

This record has no verified map location.

View council map

Documents 283 of 283

DocumentPublishedAction
DECISION LETTER ARCHAEOLOGY WHOLE SITE CONDITION 52Decision Notice · PDF24 Feb 2026View
DCC ARCHAEOLOGIST COMMENTSConsultee Comment · PDF4 Feb 2026View
DECISION LETTERDecision Notice · PDF4 Feb 2026View
DECISIONDecision Notice · PDF29 Jan 2026View
LLFA COMMENTSConsultee Comment · PDF2 Jan 2026View
CATCH PIT DETAILRevised Drawing · PDF16 Dec 2025View
PHASE 2 BASIN DETAILS AND SECTIONSRevised Drawing · PDF16 Dec 2025View
DRAINAGE CATCHMENT AREAS PLANRevised Drawing · PDF16 Dec 2025View
PHASE 1 INFRASTRUCTURE DRAINAGE DETAILSRevised Drawing · PDF16 Dec 2025View
PHASE 2 INFRASTRUCTURE DRAINAGE DETAILSRevised Drawing · PDF16 Dec 2025View
HYDRAULIC MODEL EXTENTSRevised Drawing · PDF16 Dec 2025View
EXCEEDANCE FLOW ROUTESRevised Drawing · PDF16 Dec 2025View
DRAINAGE CALCS - ? 22188-IML-PH1-XX-FLOW-SW FEH P17Background Documents · PDF16 Dec 2025View
AGENT RE REVISIONSCorrespondence · PDF16 Dec 2025View
LEAD LOCAL FLOOD AUTHORITY COMMENTSConsultee Comment · PDF14 Oct 2025View
LLFA EMAILConsultee Comment · PDF14 Oct 2025View
TECHNICAL NOTE RESPONSE TO PLANNING COMMENTSCorrespondence · PDF5 Sept 2025View
HYDRAULIC MODEL EXTENTSDrawing · PDF5 Sept 2025View
SPINE ROAD FEH P16Background Documents · PDF5 Sept 2025View
PH2 FEH P9Background Documents · PDF5 Sept 2025View
PHASE 2 EXTENT OF HYDRAULIC MODELDrawing · PDF5 Sept 2025View
HYDRAULIC MODELLING REPORTBackground Documents · PDF5 Sept 2025View
INFRASTRUCTURE DRAINAGE DETAILS PHASE 1Drawing · PDF5 Sept 2025View
INFRASTRUCTURE DRAINAGE DETAIL PHASE 2Drawing · PDF5 Sept 2025View
LEAD LOCAL FLOOD AUTHORITY COMMENTSConsultee Comment · PDF11 Jun 2025View
DRAINAGE VALIDATION REPORT V2Background Documents · PDF7 Apr 2025View
AGENT EMAILCorrespondence · PDF7 Apr 2025View
EMAILS CONFIRMING SHAFT CLOSURE RE PERMIT 28901Background Documents · PDF3 Apr 2025View
AGENT RE COND. 38 & 39Correspondence · PDF3 Apr 2025View
AGENT RE COND. 38 & 39Correspondence · PDF15 Jan 2025View
SHAFT DRILLING REPORTBackground Documents · PDF15 Jan 2025View
EMAILS MRA-DG RE MINESHAFT REMEDIATION DECEMBERBackground Documents · PDF15 Jan 2025View
COAL AUTHORITY PERMITBackground Documents · PDF15 Jan 2025View
AGENT RE CONDITION 52 / ARCHAEOLOGYCorrespondence · PDF30 Sept 2024View
AGENT RE CONDITION 52 PART A,B,CCorrespondence · PDF30 Sept 2024View
ADDENDUM TO POST-EXCAVATION ASSESSMENT & UPDATED PROJECT DESIGNBackground Documents · PDF30 Sept 2024View
COAL AUTHORITY COMMENTConsultee Comment · PDF10 Sept 2024View
SHAFT SEARCH LETTERBackground Documents · PDF27 Aug 2024View
MINE ENTRY TREATMENT SPECBackground Documents · PDF27 Aug 2024View
AGENT RE COAL/COND. 38 & 39Correspondence · PDF27 Aug 2024View
MINING SURVEY DATADrawing · PDF2 Aug 2024View
PHASE 1 ENABLING WORKS DRAINAGERevised Drawing · PDF9 Jul 2024View
AGENT RE COND. 33 & 36Correspondence · PDF8 Jul 2024View
RESPONSE TO LLFABackground Documents · PDF8 Jul 2024View
EXTENTS OF LAND OWNERSHIP BOUNDARYRevised Drawing · PDF8 Jul 2024View
DRAINAGE CATCHMENT AREAS PLANRevised Drawing · PDF8 Jul 2024View
PHASE 2 ENABLING WORKS DRAINAGERevised Drawing · PDF8 Jul 2024View
S38 DRAINAGE PLANRevised Drawing · PDF8 Jul 2024View
DRAINAGE CALCULATIONS 1Background Documents · PDF8 Jul 2024View
DRAINAGE CALCULATIONS 2Background Documents · PDF8 Jul 2024View
PHASE1 BASIN DETAILS AND SECTIONSRevised Drawing · PDF8 Jul 2024View
PHASE2 BASIN DETAILS AND SECTIONSRevised Drawing · PDF8 Jul 2024View
LANDSCAPE & ECOLOGY MANAGEMENT PLAN (REVISED)Background Documents · PDF2 Jul 2024View
AGENT RE COND. 47 / LEMPCorrespondence · PDF2 Jul 2024View
UPDATE LETTERCorrespondence · PDF17 Jun 2024View
OFFICER EMAIL RE COND. 33 & 36Correspondence · PDF17 Jun 2024View
DCC HIGHWAYS COMMENTConsultee Comment · PDF14 Jun 2024View
LEAD LOCAL FLOOD AUTHORITY COMMENTSPublic Comment · PDF14 Jun 2024View
TYPICAL GATEWAYS - DRYSTONE WALL DETAILRevised Drawing · PDF3 Jun 2024View
STONE SPECIFICATION SHEETBackground Documents · PDF3 Jun 2024View
AGENT RE COND. 55Correspondence · PDF3 Jun 2024View
COAL AUTHORITY COMMENTConsultee Comment · PDF1 May 2024View
COAL AUTHORITY COMMENTConsultee Comment · PDF30 Apr 2024View
LETTER RE COAL SHAFT 445375-007Background Documents · PDF17 Apr 2024View
AGENT RE COAL AUTHORITY CONCERNSCorrespondence · PDF17 Apr 2024View
DERBYSHIRE WILDLIFE TRUST COMMENTSConsultee Comment · PDF9 Apr 2024View
UPDATE LETTERCorrespondence · PDF28 Mar 2024View
COAL AUTHORITY COMMENTConsultee Comment · PDF21 Mar 2024View
MINESHAFT PROBING LETTER REPORTBackground Documents · PDF6 Mar 2024View
AGENT RE MINESHAFT PROBINGCorrespondence · PDF6 Mar 2024View
OFFICER COMMENT ON CONDITION 5, SECOND PHASING SCHEMECorrespondence · PDF19 Feb 2024View
AGENT RE COND. 5Correspondence · PDF26 Jan 2024View
AGENT SUMMARY OF CONDITIONSCorrespondence · PDF22 Jan 2024View
ENVIRONMENTAL HEALTH OFFICERConsultee Comment · PDF10 Jan 2024View
UPDATE LETTERCorrespondence · PDF3 Jan 2024View
COAL AUTHORITY COMMENTConsultee Comment · PDF28 Dec 2023View
DESIGN CODE (REVISED)Background Documents · PDF13 Dec 2023View
AGENT DESIGN CODE CHANGES TABLECorrespondence · PDF13 Dec 2023View
AGENT RE COND. 34Correspondence · PDF13 Dec 2023View
AGENT RE COND. 35Correspondence · PDF13 Dec 2023View
AGENT RE COND. 38 & 39Correspondence · PDF13 Dec 2023View
INVESTIGATION OF MINE ENTRY LETTERBackground Documents · PDF13 Dec 2023View
LEAD LOCAL FLOOD AUTHORITY COMMENTSConsultee Comment · PDF1 Dec 2023View
AGENT RE COND. 117Correspondence · PDF8 Nov 2023View
CONSTRUCTION MANAGEMENT PLAN (ISSUE 3)Background Documents · PDF8 Nov 2023View
TEMPORARY SW SILT MANAGEMENT STRATEGYRevised Drawing · PDF6 Nov 2023View
AGENT RE COND. 35Correspondence · PDF6 Nov 2023View
AGENT EMAIL RE CONDITION 11Correspondence · PDF3 Nov 2023View
AGENT RE CONDITION 16Correspondence · PDF3 Nov 2023View
AGENT RE COND. 45Correspondence · PDF3 Nov 2023View
AGENT RE COND. 47Correspondence · PDF3 Nov 2023View
AGENT RE COND. 56Correspondence · PDF3 Nov 2023View
COAL AUTHORITY COMMENTConsultee Comment · PDF17 Oct 2023View
UPDATE LETTERCorrespondence · PDF12 Oct 2023View
ENVIRONMENTAL HEALTH OFFICERConsultee Comment · PDF10 Oct 2023View
YORKSHIRE WATER COMMENTConsultee Comment · PDF6 Oct 2023View
FOUL WATER FLOW GENERATION REV B - PHASES 1 & 2Background Documents · PDF2 Oct 2023View
PS FLOWS AND VOLUMESBackground Documents · PDF2 Oct 2023View
AGENT RE COND. 32Correspondence · PDF2 Oct 2023View
HYDRAULIC MODELLING REPORT REV ABackground Documents · PDF2 Oct 2023View
AGENT RE COND. 33Correspondence · PDF2 Oct 2023View
PARAMETER PLAN - PHASING STRATEGYRevised Drawing · PDF28 Sept 2023View
AGENT RE CONDITION 5 - PHASINGCorrespondence · PDF28 Sept 2023View
YORKSHIRE WATER AUTHORITY COMMENTSConsultee Comment · PDF12 Sept 2023View
AGENT RE CONDITION 33Correspondence · PDF31 Aug 2023View
WATERCOURSE CONDITION CR-22188-23-292Background Documents · PDF31 Aug 2023View
LLFA DRAINAGE CALCULATIONS GUIDEConsultee Comment · PDF18 Aug 2023View
LEAD LOCAL FLOOD AUTHORITY COMMENTSConsultee Comment · PDF18 Aug 2023View
EXISTING UTILITIES - PHOTO REPORTBackground Documents · PDF18 Aug 2023View
EXISTING UTILITIES - RISING MAIN MASTERBackground Documents · PDF18 Aug 2023View
EXISTING UTILITIES - REPORT MASTER FINALBackground Documents · PDF18 Aug 2023View
COMBINED STAGE 1 & 2 ROAD SAFETY AUDITBackground Documents · PDF18 Aug 2023View
ACCESS GENERAL ARRANGEMENT & INDICATIVE DRAINAGE LAYOUTRevised Drawing · PDF18 Aug 2023View
STANDARD DETAILSRevised Drawing · PDF18 Aug 2023View
PROPOSED PAVEMENT, ROAD MARKINGS, KERBING & SITE CLEARANCERevised Drawing · PDF18 Aug 2023View
INDICATIVE MASTERPLANRevised Drawing · PDF18 Aug 2023View
COMBINED STAGE 1 AND STAGE 2 ROAD SAFETY AUDITBackground Documents · PDF18 Aug 2023View
S278 BOLSOVER ROAD MASTIN MOOR - PHASE 1 - DA3Background Documents · PDF18 Aug 2023View
SUDS MANAGEMENT & MAINTENANCEBackground Documents · PDF18 Aug 2023View
CMP APDX A - INDICATIVE MPBackground Documents · PDF17 Aug 2023View
S38 DRAINAGE PLANRevised Drawing · PDF17 Aug 2023View
S38 GENERAL ARRANGEMENTRevised Drawing · PDF17 Aug 2023View
PROPOSED CONTOURS PH1 ENABLING WORKS AND PH2Revised Drawing · PDF17 Aug 2023View
ISOPACHYTE PH1 ENABLING WORKS AND PH2Revised Drawing · PDF17 Aug 2023View
EARTHWORKS PROPOSED SITE SECTIONS SHEET 1Revised Drawing · PDF17 Aug 2023View
EARTHWORKS PROPOSED SITE SECTIONS SHEET 2Revised Drawing · PDF17 Aug 2023View
APPLICATION BOUNDARYRevised Drawing · PDF17 Aug 2023View
COMPOUND PLANRevised Drawing · PDF17 Aug 2023View
PHASE 1 ENABLING WORKS DRAINAGERevised Drawing · PDF17 Aug 2023View
PHASE 2 ENABLING WORKS DRAINAGERevised Drawing · PDF17 Aug 2023View
MANHOLE SCHEDULERevised Drawing · PDF17 Aug 2023View
INFRASTRUCTURE DRAINAGE LONG SECTIONSRevised Drawing · PDF17 Aug 2023View
INFRASTRUCTURE DRAINAGE DETAILSRevised Drawing · PDF17 Aug 2023View
T03 DRAINAGE LS AND MH SCHEDRevised Drawing · PDF17 Aug 2023View
S38 HIGHWAY LONG SECTIONS 1 OF 2Revised Drawing · PDF17 Aug 2023View
S38 HIGHWAY LONG SECTIONS 2 OF 2Revised Drawing · PDF17 Aug 2023View
S38 KERBING & SURFACINGRevised Drawing · PDF17 Aug 2023View
S38 DETAILSRevised Drawing · PDF17 Aug 2023View
LANDSCAPE MASTERPLANRevised Drawing · PDF17 Aug 2023View
LANDSCAPE GA PLAN SHEET 1 OF 4Revised Drawing · PDF17 Aug 2023View
LANDSCAPE GA PLAN SHEET 2 OF 4Revised Drawing · PDF17 Aug 2023View
LANDSCAPE GA PLAN SHEET 3 OF 4Revised Drawing · PDF17 Aug 2023View
LANDSCAPE GA PLAN SHEET 4 OF 4Revised Drawing · PDF17 Aug 2023View
PATH MOUND INTERFACE DETAILRevised Drawing · PDF17 Aug 2023View
GATEWAYS - ENTRANCE 1-6Revised Drawing · PDF17 Aug 2023View
GATEWAYS - ENTRANCE 7-10Revised Drawing · PDF17 Aug 2023View
LANDSCAPE SOFTWORKS SHEET 1 OF 4Revised Drawing · PDF17 Aug 2023View
LANDSCAPE SOFTWORKS SHEET 2 OF 4Revised Drawing · PDF17 Aug 2023View
LANDSCAPE SOFTWORKS SHEET 3 OF 4Revised Drawing · PDF17 Aug 2023View
LANDSCAPE SOFTWORKS SHEET 4 OF 4Revised Drawing · PDF17 Aug 2023View
PLANTING DETAILSRevised Drawing · PDF17 Aug 2023View
PLANTING SCHEDULERevised Drawing · PDF17 Aug 2023View
LANDSCAPE SPECIFICATIONBackground Documents · PDF17 Aug 2023View
LANDSCAPE MANAGEMENT AND MAINTENANCE PLANBackground Documents · PDF17 Aug 2023View
HIGHWAY GENERAL ARRANGEMENTRevised Drawing · PDF17 Aug 2023View
CMP APDX E - CONTRACTOR COMPOUND AND HAUL ROAD PLANRevised Drawing · PDF16 Aug 2023View
CONSTRUCTION MANAGEMENT PLAN (ISSUE 2)Background Documents · PDF16 Aug 2023View
CMP APDX B - LANDSCAPE MASTERPLANRevised Drawing · PDF16 Aug 2023View
CMP APDX C - PHASING PLAN P01Revised Drawing · PDF16 Aug 2023View
CMP APDX D - DEVELOPMENT PROGRAMMEBackground Documents · PDF16 Aug 2023View
YORKSHIRE WATER COMMENTConsultee Comment · PDF26 Jul 2023View
DCC HIGHWAYS FURTHER COMMENTConsultee Comment · PDF13 Jul 2023View
DCC HIGHWAYS COMMENTConsultee Comment · PDF12 Jul 2023View
EMAIL RE COND. 11 - DESIGN CODECorrespondence · PDF11 Jul 2023View
S38 GENERAL ARRANGEMENTRevised Drawing · PDF11 Jul 2023View
AGENT RE S38 GA, CONDS. 18, 20, 23Correspondence · PDF11 Jul 2023View
AGENT RE COND. 32Correspondence · PDF11 Jul 2023View
FOUL AND SURFACE WATER SEWERAGE - STATEMENTBackground Documents · PDF11 Jul 2023View
LANDSCAPE & ECOLOGY MANAGEMENT PLAN (REVISED)Background Documents · PDF11 Jul 2023View
AMENDED DESIGN CODE/FRAMEWORKBackground Documents · PDF10 Jul 2023View
EARTHWORKS PROPOSED SITE SECTIONSRevised Drawing · PDF10 Jul 2023View
AGENT RE COND. 45Correspondence · PDF10 Jul 2023View
CEMP ? BIODIVERSITY UPDATED JUL 23Background Documents · PDF10 Jul 2023View
LANDSCAPE MANAGEMENT & MAINTENANCE PLAN (REVISED)Background Documents · PDF10 Jul 2023View
LANDSCAPING DELIVERY PHASES 1 AND 2 10-7-23Revised Drawing · PDF10 Jul 2023View
LANDSCAPE GA PLAN - FRONTING BOLSOVER RD & ESTATE RDRevised Drawing · PDF10 Jul 2023View
AGENT RE COND. 51Correspondence · PDF10 Jul 2023View
AGENT EMAIL TO LLFACorrespondence · PDF30 Jun 2023View
ECONOMIC DEVELOPMENT COMMENTConsultee Comment · PDF29 Jun 2023View
AGENT RE CONDITION 53 & ECONOMIC DEVELOPMENTCorrespondence · PDF27 Jun 2023View
EDU COMMENT ON RESERVED MATTERS APPLICATION 18.4.23Background Documents · PDF27 Jun 2023View
DERBYSHIRE WILDLIFE TRUSTConsultee Comment · PDF13 Jun 2023View
DERBYSHIRE SWIFT CONSERVATIONPublic Comment · PDF10 Jun 2023View
UPDATE LETTERCorrespondence · PDF9 Jun 2023View
TREE OFFICER COMMENTConsultee Comment · PDF28 Apr 2023View
YORKSHIRE WATER COMMENTConsultee Comment · PDF24 Apr 2023View
MRS NYREE CLARKPublic Comment · PDF22 Apr 2023View
DCC ARCHAEOLOGIST COMMENTConsultee Comment · PDF21 Apr 2023View
EXISTING UTILITIES- PHOTO REPORTBackground Documents · PDF31 Mar 2023View
EXISTING UTILITIES- RAISING MAIN MASTERBackground Documents · PDF31 Mar 2023View
EXISTING UTILITIES- REPORTBackground Documents · PDF31 Mar 2023View
INDICATIVE MASTERPLANDrawing · PDF31 Mar 2023View
PROPOSED BOLSOVER ROAD SITE ACCESS STAGE 1 AND 2 ROAD SAFETY AUDITBackground Documents · PDF31 Mar 2023View
APPLICATIONFORMREDACTEDApplication Form · PDF24 Mar 2023View
APPENDIX C- PHASING PLANDrawing · PDF24 Mar 2023View
C5 - PHASING SCHEME - STATEMENTBackground Documents · PDF24 Mar 2023View
PARAMETER PLANS- PHASINGDrawing · PDF24 Mar 2023View
C6 - PROGRAMME FOR DELIVERY OF THE LOCAL CENTRE - STATEMENTBackground Documents · PDF24 Mar 2023View
LOCAL CENTRE DELIVERY PROGRAMME REV BBackground Documents · PDF24 Mar 2023View
C7 - STRATEGY FOR DELIVERY OF ADOPTABLE AND ACCESSIBLE DWELLINGS STATEMENTBackground Documents · PDF24 Mar 2023View
C11- DESIGN CODE STATEMENTBackground Documents · PDF24 Mar 2023View
DESIGN CODEBackground Documents · PDF24 Mar 2023View
C16- PEDESTRIAN CONNECTIVITY SCHEME STATEMENTBackground Documents · PDF24 Mar 2023View
ACCESS GENERAL ARRANGEMENT AND INDICATIVE DRAINAGE LAYOUTDrawing · PDF24 Mar 2023View
STANDARD DETAILSDrawing · PDF24 Mar 2023View
PAVEMENT AND SITE CLEARANCEDrawing · PDF24 Mar 2023View
PROPOSED CONTOURS AND PROPOSED PROFILEDrawing · PDF24 Mar 2023View
APPENDIX A - INDICATIVE MASTERPLANDrawing · PDF24 Mar 2023View
APPENDIX B - LANDSCAPE MASTERPLANDrawing · PDF24 Mar 2023View
APPENDIX D - DEVELOPMENT PROGRAMME REV JBackground Documents · PDF24 Mar 2023View
APPENDIX E - MAIN CONTRACTOR COMPOUND LOCATION PLANDrawing · PDF24 Mar 2023View
C17- CONSTRUCTION MANAGEMENT PLAN STATEMENTBackground Documents · PDF24 Mar 2023View
CONSTRUCTION MANAGEMENT PLAN PHASE 1 AND 2Background Documents · PDF24 Mar 2023View
C18- CONSTRUCTION DETAILS OF RESIDENTIAL ESTATE ROADS AND FOOTWAYS STATEMENTBackground Documents · PDF24 Mar 2023View
C20- SAFETY AUDIT - STATEMENTBackground Documents · PDF24 Mar 2023View
C23- DISPOSAL OF HIGHWAY SURFACE WATER STATEMENTBackground Documents · PDF24 Mar 2023View
C25- MANAGEMENT AND MAINTENANCE OF STREETS STATEMENTBackground Documents · PDF24 Mar 2023View
ROAD MAINTENANCE AND ADOPTION - REV 1Background Documents · PDF24 Mar 2023View
C31- DISCHARGE OF SURFACE WATER STATEMENTBackground Documents · PDF24 Mar 2023View
C32- FOUL AND SURFACE WATER SEWERAGE STATEMENTBackground Documents · PDF24 Mar 2023View
GENERAL ARRANGEMENT OF PUMPS WITH PIPEWORK, VALVES AND CONTROLSDrawing · PDF24 Mar 2023View
GENERAL ARRANGEMENT OF PUMPS WITH PIPEWORK, VALVES AND CONTROLSDrawing · PDF24 Mar 2023View
SUDS MANAGEMENT AND MAINTENANCEBackground Documents · PDF24 Mar 2023View
C33- MINE DRAINAGE STATEMENTBackground Documents · PDF24 Mar 2023View
C34 - DRAINAGE HIERARCHY - STATEMENTBackground Documents · PDF24 Mar 2023View
C35 - AVOIDANCE OF ADDITIONAL SURFACE WATER RUN-OFFBackground Documents · PDF24 Mar 2023View
PHASE 1 ENABLING WORKS DRAINAGEDrawing · PDF24 Mar 2023View
PHASE 2 ENABLING WORKS DRAINAGEDrawing · PDF24 Mar 2023View
S38 DRAINAGE PLANDrawing · PDF24 Mar 2023View
C36 - ATTENUATION PONDS - STATEMENTBackground Documents · PDF24 Mar 2023View
C38- SCHEME OF INTRUSIVE SITE INVESTIGATIONS STATEMENTBackground Documents · PDF24 Mar 2023View
C39 - INTRUSIVE SITE INVESTIGATIONS - FINDINGS STATEMENTBackground Documents · PDF24 Mar 2023View
C40 - SITE INVESTIGATION AND REMEDIATION - STATEMENTBackground Documents · PDF24 Mar 2023View
C41 - BIODIVERSITY NET GAIN - STATEMENTBackground Documents · PDF24 Mar 2023View
BIODIVERSITY METRICBackground Documents24 Mar 2023View
C44 - BADGER SURVEY AND MITIGATION - STATEMENTBackground Documents · PDF24 Mar 2023View
CONSTRUCTION ENVIRONMENT MANAGEMENT PLAN (CEMP) PHASE 1 AND 2Background Documents · PDF24 Mar 2023View
C46 - BADGER PROTECTION MEASURES - STATEMENTBackground Documents · PDF24 Mar 2023View
C47 - LANDSCAPE AND ECOLOGICAL MANAGEMENT PLAN - STATEMENTBackground Documents · PDF24 Mar 2023View
PHASE 1 AND 2 LANDSCAPE ECOLOGICAL MANAGEMENT PLANBackground Documents · PDF24 Mar 2023View
C49 - TREES HEDGEROWS AND HABITATS PROTECTION - STATEMENTBackground Documents · PDF24 Mar 2023View
C51 - LANDSCAPING MANAGEMENT AND MAINTENANCE - STATEMENTBackground Documents · PDF24 Mar 2023View
LANDSCAPE MANAGEMENT AND MAINTENANCE PLANBackground Documents · PDF24 Mar 2023View
WRITTEN SCHEME OF INVESTIGATION FOR ARCHAEOLOGICAL EVALUATIONBackground Documents · PDF24 Mar 2023View
WRITTEN SCHEME OF INVESTIGATION FOR ARCHAEOLOGICAL STRIP, MAP AND RECORD WORKSBackground Documents · PDF24 Mar 2023View
WRITTEN SCHEME OF INVESTIGATION FOR ARCHAEOLOGICAL WATCHING BRIEF ON GROUND INVEBackground Documents · PDF24 Mar 2023View
C52 - ARCHAEOLOGICAL WRITTEN SCHEME OF INVESTIGATION- STATEMENTBackground Documents · PDF24 Mar 2023View
C53 - EMPLOYMENT AND TRAINING SCHEME - STATEMENTBackground Documents · PDF24 Mar 2023View
C55 - EXTERNAL MATERIALS - STATEMENTBackground Documents · PDF24 Mar 2023View
TYPICAL GATEWAYS - DRYSTONE WALL DETAILDrawing · PDF24 Mar 2023View
PROPOSED CONTOURS PH1 ENABLING WORKS AND PH2Drawing · PDF24 Mar 2023View
ISOPACHYTE PH1 ENABLING WORKS AND PH2Drawing · PDF24 Mar 2023View
C56 - EXISTING AND PROPOSED LEVELS - STATEMENTBackground Documents · PDF24 Mar 2023View
TOPOGRAPHICAL SURVEY- SHEET 1 OF 7Drawing · PDF24 Mar 2023View
TOPOGRAPHICAL SURVEY - SHEET 2 OF 7Drawing · PDF24 Mar 2023View
TOPOGRAPHICAL SURVEY - SHEET 3 OF 7Drawing · PDF24 Mar 2023View
C57 - NOISE AND VIBRATION - STATEMENTBackground Documents · PDF24 Mar 2023View
C58 - SUSTAINABILITY STATEMENTBackground Documents · PDF24 Mar 2023View
COVER LETTERCorrespondence · PDF24 Mar 2023View
DISCHARGE OF CONDITIONS SCHEDULEBackground Documents · PDF24 Mar 2023View
BIODIVERSITY NET GAIN ASSESSMENTBackground Documents · PDF24 Mar 2023View
C45- CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN- STATEMENTBackground Documents · PDF24 Mar 2023View
GEO-ENVIRONMENTAL ASSESSMENTBackground Documents · PDF24 Mar 2023View
GEOTECHNICAL AND GEOENVIRONMENTAL SITE INVESTIGATIONBackground Documents · PDF24 Mar 2023View
MINE WATER WITH PROPOSED LAYOUTDrawing · PDF24 Mar 2023View
TEMPORARY SURFACE WATER & SILT MANAGEMENT STRATEGYDrawing · PDF24 Mar 2023View
INFRASTRUCTURE PH1 MANHOLE SCHEDULEDrawing · PDF24 Mar 2023View
INFRASTRUCTURE DRAINAGE DETAILSDrawing · PDF24 Mar 2023View
INFRASTRUCTURE DRAINAGE DETAILSDrawing · PDF24 Mar 2023View
INFRASTRUCTURE DRAINAGE DETAILSDrawing · PDF24 Mar 2023View
INFRASTRUCTURE DRAINAGE DETAILS PHASE 1Drawing · PDF24 Mar 2023View
INFRASTRUCTURE PH1 DRAINAGE LONG SECTIONSDrawing · PDF24 Mar 2023View
INFRASTRUCTURE PH1 DRAINAGE LONG SECTIONSDrawing · PDF24 Mar 2023View
INFRASTRUCTURE PH1 DRAINAGE LONG SECTIONSDrawing · PDF24 Mar 2023View
INFRASTRUCTURE PH1 DRAINAGE LONG SECTIONSDrawing · PDF24 Mar 2023View
INFRASTRUCTURE PH2 LONGSECTION AND MANHOLE SCHEDULEDrawing · PDF24 Mar 2023View
SECTION 38 DETAILSDrawing · PDF24 Mar 2023View
LINING GADrawing · PDF24 Mar 2023View
PHASE 1 S38 HIGHWAY LONGSECTIONS SHEET 1 OF 2Drawing · PDF24 Mar 2023View
PHASE 1 S38 HIGHWAY LONGSECTIONS SHEET 2 OF 2Drawing · PDF24 Mar 2023View
SECTION 38 GENERAL ARRANGEMENTDrawing · PDF24 Mar 2023View
SECTION 38 KERBING AND SURFACINGDrawing · PDF24 Mar 2023View
INFRASTRUCTURE PH1 DRAINAGE LONG SECTIONSDrawing · PDF24 Mar 2023View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Discharge of Planning Conditions
DECISION LETTER ARCHAEOLOGY WHOLE SITE CONDITION 52 DECISION LETTER DECISION
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.