Council planning record

Discharge of conditions: 3 (Highway improvement works), 4 (Development program), 6 (Highway Construction Management Statement/Plan), 7 (Vehicular access junctions), 8 (Construction details of the estate streets and footways), 11 (Travel plan), 12 (Junction visibility sightlines), 17 (Employment and Training Scheme), 19 (Implementation of coal mining remediation work), 21 (Construction Environmental Management Plan), 22 (Scheme for the investigation and recording of contamination), 25 (Ecological Enhancement Plan), 31 (Tree protection plan and arboricultural method statement), 36 (Proposed street scene), 37 (Contour and attenuation pond details), 38 (Detailed design and associated management and maintenance plan of the surface water for the site), 39 (Assessment to demonstrate that the proposed destination for surface water accords with the drainage hierarchy) and 40 (Additional surface water run-off during construction phase), 41 (Associated management and maintenance plan in line with CIRIA SuDS Manual C753) and 46 (Carbon release reduction scheme) of application CHE/21/00707/FUL- Erection of 301 dwellings including the provision of public open space, landscaping and associated infrastructure and works

Land To The East Of Linacre Road Holme Hall Chesterfield Derbyshire

DecidedReference: CHE/22/00706/DOCChesterfield Borough Council

Last published check: 28 Sept 2026, 13:50. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Issued Date

    Published milestoneCouncil source
  5. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided
Application type
Discharge of Conditions
Received
4 Oct 2022
Validated
17 Oct 2022
Determination deadline
12 Dec 2022
Local authority
Chesterfield Borough Council

Application overview

Discharge of conditions: 3 (Highway improvement works), 4 (Development program), 6 (Highway Construction Management Statement/Plan), 7 (Vehicular access junctions), 8 (Construction details of the estate streets and footways), 11 (Travel plan), 12 (Junction visibility sightlines), 17 (Employment and Training Scheme), 19 (Implementation of coal mining remediation work), 21 (Construction Environmental Management Plan), 22 (Scheme for the investigation and recording of contamination), 25 (Ecological Enhancement Plan), 31 (Tree protection plan and arboricultural method statement), 36 (Proposed street scene), 37 (Contour and attenuation pond details), 38 (Detailed design and associated management and maintenance plan of the surface water for the site), 39 (Assessment to demonstrate that the proposed destination for surface water accords with the drainage hierarchy) and 40 (Additional surface water run-off during construction phase), 41 (Associated management and maintenance plan in line with CIRIA SuDS Manual C753) and 46 (Carbon release reduction scheme) of application CHE/21/00707/FUL- Erection of 301 dwellings including the provision of public open space, landscaping and associated infrastructure and works

Proposal details

Reference
CHE/22/00706/DOC
Ward
Linacre

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Land To The East Of Linacre Road Holme Hall Chesterfield Derbyshire

This record has no verified map location.

View council map

Documents 256 of 256

DocumentPublishedAction
FINAL DECISION LETTERDecision Notice · PDF6 Dec 2023View
ECONOMIC DEVELOPMENT UNIT COMMENTConsultee Comment · PDF16 Nov 2023View
EMPLOYMENT & SKILLS PLANBackground Documents · PDF16 Nov 2023View
RESPONSE TO UPDATE LETTERCorrespondence · PDF17 Oct 2023View
SITE LEVELSRevised Drawing · PDF17 Oct 2023View
BOUNDARY TREATMENTS 1Revised Drawing · PDF17 Oct 2023View
BOUNDARY TREATMENTS 2Revised Drawing · PDF17 Oct 2023View
EXTERNAL LEVELS STRATEGY 1 OF 6Revised Drawing · PDF17 Oct 2023View
EXTERNAL LEVELS STRATEGY 2 OF 6Revised Drawing · PDF17 Oct 2023View
EXTERNAL LEVELS STRATEGY 3 OF 6Revised Drawing · PDF17 Oct 2023View
EXTERNAL LEVELS STRATEGY 4 OF 6Revised Drawing · PDF17 Oct 2023View
EXTERNAL LEVELS STRATEGY 5 OF 6Revised Drawing · PDF17 Oct 2023View
EXTERNAL LEVELS STRATEGY 6 OF 6Revised Drawing · PDF17 Oct 2023View
COAL AUTHORITY COMMENTCorrespondence · PDF16 Oct 2023View
DRAINAGE PLAN 1 OF 5Revised Drawing · PDF11 Oct 2023View
DRAINAGE PLAN 2 OF 5Revised Drawing · PDF11 Oct 2023View
DRAINAGE PLAN 3 OF 5Revised Drawing · PDF11 Oct 2023View
DRAINAGE PLAN 4 OF 5Revised Drawing · PDF11 Oct 2023View
DRAINAGE PLAN 5 OF 5Revised Drawing · PDF11 Oct 2023View
SECTIONS THROUGH SWALERevised Drawing · PDF11 Oct 2023View
SWALE LONGSECTION 1 OF 2Revised Drawing · PDF11 Oct 2023View
SWALE LONGSECTION 2 OF 2Revised Drawing · PDF11 Oct 2023View
SWALE DETAILSRevised Drawing · PDF11 Oct 2023View
STORM NORTH B CALCULATIONSBackground Documents · PDF11 Oct 2023View
STORM NORTH SIDE 3.33YR 35CCBackground Documents · PDF11 Oct 2023View
STORM SOUTH A CALCULATIONSBackground Documents · PDF11 Oct 2023View
STORM SOUTH SIDE 3.33YR 35CCBackground Documents · PDF11 Oct 2023View
SUDS DRAINAGE MAINTENANCE PLAN REV BBackground Documents · PDF11 Oct 2023View
CONDITION 41 DRAWINGSRevised Drawing · PDF11 Oct 2023View
PHASING PLANRevised Drawing · PDF11 Oct 2023View
DOC RESPONSE LETTERCorrespondence · PDF11 Oct 2023View
UPDATE LETTERCorrespondence · PDF5 Oct 2023View
APPLICANT RESPONSE LETTERCorrespondence · PDF3 Oct 2023View
EMAIL RE STONE MATERIALSCorrespondence · PDF3 Oct 2023View
DERBYSHIRE WILDLIFE TRUST COMMENTSConsultee Comment · PDF29 Sept 2023View
DOC RESPONSE LETTERCorrespondence · PDF7 Aug 2023View
PHASING PLANRevised Drawing · PDF7 Aug 2023View
MINE WORKING & MINE SHAFT TREATMENT SPECIFICATIONBackground Documents · PDF7 Aug 2023View
CONDITION 41 DRAWINGSRevised Drawing · PDF7 Aug 2023View
DRAINAGE LAYOUT 5 OF 5Revised Drawing · PDF7 Aug 2023View
DRAINAGE LAYOUT 1 OF 5Revised Drawing · PDF7 Aug 2023View
DRAINAGE LAYOUT 2 OF 5Revised Drawing · PDF7 Aug 2023View
DRAINAGE LAYOUT 3 OF 5Revised Drawing · PDF7 Aug 2023View
DRAINAGE LAYOUT 4 OF 5Revised Drawing · PDF7 Aug 2023View
SWALE DETAILSRevised Drawing · PDF7 Aug 2023View
STORM NORTH B CALCULATIONSBackground Documents · PDF7 Aug 2023View
STORM NORTH SIDE 3.33YR 35CCBackground Documents · PDF7 Aug 2023View
STORM SOUTH A CALCULATIONSBackground Documents · PDF7 Aug 2023View
STORM SOUTH SIDE 3.33YR 35CCBackground Documents · PDF7 Aug 2023View
SUDS MANAGEMENT PLAN LINACRE SUE REV BBackground Documents · PDF7 Aug 2023View
ENVIRONMENTAL HEALTH OFFICERConsultee Comment · PDF17 Jul 2023View
UPDATE LETTERCorrespondence · PDF17 Jul 2023View
ENVIRONMENTAL HEALTH OFFICERConsultee Comment · PDF10 Jul 2023View
APPLICANT RESPONSE LETTERCorrespondence · PDF13 Jun 2023View
TYPICAL RETAINING WALL DETAILS SHEET 1 OF 2Revised Drawing · PDF13 Jun 2023View
TYPICAL ALTERNATIVE RETAINING WALL DETAILS SHEET 2 OF 2Revised Drawing · PDF13 Jun 2023View
NEW PROPOSED MATERIALS PLANRevised Drawing · PDF13 Jun 2023View
MATERIAL SCHEDULEBackground Documents13 Jun 2023View
EXTERNAL LEVELS STRATEGY 1 OF 6Revised Drawing · PDF13 Jun 2023View
EXTERNAL LEVELS STRATEGY 2 OF 6Revised Drawing · PDF13 Jun 2023View
EXTERNAL LEVELS STRATEGY 3 OF 6Revised Drawing · PDF13 Jun 2023View
EXTERNAL LEVELS STRATEGY 4 OF 6Revised Drawing · PDF13 Jun 2023View
EXTERNAL LEVELS STRATEGY 5 OF 6Revised Drawing · PDF13 Jun 2023View
EXTERNAL LEVELS STRATEGY 6 OF 6Revised Drawing · PDF13 Jun 2023View
FRONT ELEVATION ALDERLEYRevised Drawing · PDF13 Jun 2023View
SIDE ELEVATION ALDERLEYRevised Drawing · PDF13 Jun 2023View
REAR ELEVATION ALDERLEYRevised Drawing · PDF13 Jun 2023View
FRONT ELEVATION HOLMEWOODRevised Drawing · PDF13 Jun 2023View
SIDE ELEVATION HOLMEWOODRevised Drawing · PDF13 Jun 2023View
REAR ELEVATION HOLMEWOODRevised Drawing · PDF13 Jun 2023View
SIDE ELEVATION HOLMEWOODRevised Drawing · PDF13 Jun 2023View
FRONT ELEVATION MORDENRevised Drawing · PDF13 Jun 2023View
SIDE ELEVATION MORDENRevised Drawing · PDF13 Jun 2023View
REAR ELEVATION MORDENRevised Drawing · PDF13 Jun 2023View
FRONT ELEVATION, 2B4P M4(2) SHARED OWNERRevised Drawing · PDF13 Jun 2023View
SIDE ELEVATION, 2B4P M4(2) SHARED OWNERRevised Drawing · PDF13 Jun 2023View
REAR ELEVATION, 2B4P M4(2) SHARED OWNERRevised Drawing · PDF13 Jun 2023View
SIDE ELEVATION, 2B4P M4(2) SHARED OWNERRevised Drawing · PDF13 Jun 2023View
FRONT ELEVATION, 3B5P M42 AS-OPP SHAREDRevised Drawing · PDF13 Jun 2023View
SIDE ELEVATION, 3B5P M42 AS-OPP SHAREDRevised Drawing · PDF13 Jun 2023View
REAR ELEVATION, 3B5P M42 AS-OPP SHAREDRevised Drawing · PDF13 Jun 2023View
SIDE ELEVATION, 3B5P M42 AS-OPP SHAREDRevised Drawing · PDF13 Jun 2023View
DERBYSHIRE WILDLIFE TRUSTConsultee Comment · PDF23 May 2023View
COAL AUTHORITY COMMENTConsultee Comment · PDF19 May 2023View
UPDATE LETTERCorrespondence · PDF18 May 2023View
LEAD LOCAL FLOOD AUTHORITYConsultee Comment · PDF17 May 2023View
UPDATE LETTER 2Correspondence · PDF12 May 2023View
DCC HIGHWAYS COMMENTConsultee Comment · PDF11 May 2023View
FURTHER UPDATE LETTERCorrespondence · PDF9 May 2023View
TREE OFFICER COMMENTConsultee Comment · PDF15 Mar 2023View
PRE-COMMENCEMENT SURVEY LETTER REPORT - TREES, BATS, BIRDSBackground Documents · PDF14 Mar 2023View
TREE PROTECTION SIGNAGE IMAGESBackground Documents · PDF14 Mar 2023View
BAT ROOST SURVEY REPORTBackground Documents · PDF24 Feb 2023View
APPLICANT RESPONSE TO LLFA COMMENTSCorrespondence · PDF24 Feb 2023View
DRAINAGE LAYOUT-1 OF 5Revised Drawing · PDF24 Feb 2023View
DRAINAGE LAYOUT-2 OF 5Revised Drawing · PDF24 Feb 2023View
DRAINAGE LAYOUT-3 OF 5Revised Drawing · PDF24 Feb 2023View
DRAINAGE LAYOUT-4 OF 5Revised Drawing · PDF24 Feb 2023View
DRAINAGE LAYOUT-5 OF 5Revised Drawing · PDF24 Feb 2023View
FLOOD ROUTING PLANRevised Drawing · PDF24 Feb 2023View
STORM NORTH B CALCULATIONBackground Documents · PDF24 Feb 2023View
STORM SOUTH A CALCULATIONBackground Documents · PDF24 Feb 2023View
SUDS DETAILS & SECTIONSRevised Drawing · PDF24 Feb 2023View
TREE PROTECTIVE FENCING (ALTERNATIVE TO AMS)Revised Drawing · PDF6 Feb 2023View
CROSS SECTION THROUGH TURNING HEADS (SHEET 1 OF 2)Revised Drawing · PDF1 Feb 2023View
CROSS SECTION THROUGH TURNING HEADS (SHEET 2 OF 2)Revised Drawing · PDF1 Feb 2023View
CONSTRUCTION MANAGEMENT PLANRevised Drawing · PDF27 Jan 2023View
TREE PROTECTION PLAN & ENABLING WORKSRevised Drawing · PDF27 Jan 2023View
VEHICLE EXCLUSION ZONE MARK UP - TREE PROTECTION PLANRevised Drawing · PDF27 Jan 2023View
REVISED MINE WORKING & MINE SHAFT TREATMENT SPECIFICATIONBackground Documents · PDF27 Jan 2023View
REVISED TREE PROTECTION PLANRevised Drawing · PDF27 Jan 2023View
TREE PROTECTION METHOD STATEMENTBackground Documents · PDF27 Jan 2023View
ABORICULTURAL METHOD STATEMENTBackground Documents · PDF27 Jan 2023View
SITE SECTIONSRevised Drawing · PDF27 Jan 2023View
ENABLING & SILT RUNOFF MITIGATION PLANRevised Drawing · PDF27 Jan 2023View
PIPE REACTOR AND SILT CAPTURE CHANNEL GUIDANCE DOCUMENTBackground Documents · PDF27 Jan 2023View
SILT CONTROL ACTION REPORTBackground Documents · PDF27 Jan 2023View
PIPE REACTOR PRODUCT INFOBackground Documents · PDF27 Jan 2023View
SILT CAPTURE CHANNEL EXAMPLEBackground Documents · PDF27 Jan 2023View
SILT CAPTURE CHANNEL MATERIALS LIST PHOTOSBackground Documents · PDF27 Jan 2023View
SILT CAPTURE CHANNEL METHOD STATEMENT V1Background Documents · PDF27 Jan 2023View
AGENT RESPONSE CONDITIONS EMAIL EMAILCorrespondence · PDF27 Jan 2023View
BRICK OPTIONS LISTBackground Documents · PDF27 Jan 2023View
LEADHILL ACCESS FOOTPATH REMOVAL MARK-UPRevised Drawing · PDF27 Jan 2023View
DERBYSHIRE WILDLIFE TRUSTConsultee Comment · PDF19 Jan 2023View
EMAIL RE COND. 4 / PHASINGCorrespondence · PDF19 Jan 2023View
CONSTRUCTION MANAGEMENT PLANRevised Drawing · PDF19 Jan 2023View
SITE LAYOUT PHASING PLANRevised Drawing · PDF19 Jan 2023View
AGENT & INW RE HEADWALLCorrespondence · PDF18 Jan 2023View
AGENT RE CONDITION 37Correspondence · PDF18 Jan 2023View
CONSULTATION RESPONSECorrespondence · PDF5 Jan 2023View
DECISION LETTERDecision Notice · PDF15 Dec 2022View
LEAD LOCAL FLOOD AUTHORITYConsultee Comment · PDF7 Dec 2022View
LEAD LOCAL FLOOD AUTHORITYConsultee Comment · PDF6 Dec 2022View
DESIGN SERVICES DRAINAGEConsultee Comment · PDF2 Dec 2022View
COAL AUTHORITY COMMENTConsultee Comment · PDF30 Nov 2022View
YORKSHIRE WATER COMMENTConsultee Comment · PDF22 Nov 2022View
ECONOMIC DEVELOPMENT COMMENTConsultee Comment · PDF22 Nov 2022View
TREE OFFICER COMMENTConsultee Comment · PDF15 Nov 2022View
PLOT & MATERIALS SCHEDULEBackground Documents · PDF21 Oct 2022View
MATERIALS PLANDrawing · PDF21 Oct 2022View
ARBORICULTURAL METHOD ASSESSMENTBackground Documents · PDF21 Oct 2022View
DrawingDrawing · PDF19 Oct 2022View
EMAIL RE CLARIFICATION OF CONDITIONSCorrespondence · PDF17 Oct 2022View
HEDGEHOG HIGHWAY PLANDrawing · PDF17 Oct 2022View
HEDGEHOG HIGHWAY PLAN 2Drawing · PDF17 Oct 2022View
VISIBILITY SPLAY PLANDrawing · PDF17 Oct 2022View
VISIBILITY SPLAY PLAN 2Drawing · PDF17 Oct 2022View
LANDSCAPE AND BIODIVERSITY STRATEGYDrawing · PDF17 Oct 2022View
COVER LETTER ACorrespondence · PDF17 Oct 2022View
SCAR FOR TEMPORARY WORKS PHASEBackground Documents · PDF17 Oct 2022View
RESIDENTIAL TRAVEL PLANBackground Documents · PDF17 Oct 2022View
ENVIRONMENTAL MANAGEMENT PLANBackground Documents · PDF17 Oct 2022View
MINE WORKING AND MINE SHAFT TREATMENT SPECIFICATIONBackground Documents · PDF17 Oct 2022View
PRELIMINARY GEOENVIRONMENTAL APPRAISAL AND MINING INVESTIGATION DESK STUDYBackground Documents · PDF17 Oct 2022View
APPLICATIONFORMREDACTEDApplication Form · PDF4 Oct 2022View
SECTION 278 AGREEMENT PLANDrawing · PDF4 Oct 2022View
ADOPTABLE ROAD CONSTRUCTION DETAILSDrawing · PDF4 Oct 2022View
CONSTRUCTION MANAGEMENT PLANDrawing · PDF4 Oct 2022View
DRAINAGE STRATEGY 1 OF 5Drawing · PDF4 Oct 2022View
DRAINAGE STRATEGY 2 OF 5Drawing · PDF4 Oct 2022View
DRAINAGE STRATEGY 3 OF 5Drawing · PDF4 Oct 2022View
DRAINAGE STRATEGY 4 OF 5Drawing · PDF4 Oct 2022View
DRAINAGE STRATEGY 5 OF 5Drawing · PDF4 Oct 2022View
PRIVATE DRAINAGE CONSTRUCTION DETAILSDrawing · PDF4 Oct 2022View
PRIVATE EXTERNAL WORKS DETAILSDrawing · PDF4 Oct 2022View
EXTERNAL LEVELS STRATEGY 1 OF 6Drawing · PDF4 Oct 2022View
EXTERNAL LEVELS STRATEGY 2 OF 6Drawing · PDF4 Oct 2022View
EXTERNAL LEVELS STRATEGY 3 OF 6Drawing · PDF4 Oct 2022View
EXTERNAL LEVELS STRATEGY 4 OF 6Drawing · PDF4 Oct 2022View
EXTERNAL LEVELS STRATEGY 5 OF 6Drawing · PDF4 Oct 2022View
EXTERNAL LEVELS STRATEGY 6 OF 6Drawing · PDF4 Oct 2022View
LONGITUDINAL SECTIONS 5 OF 8Drawing · PDF4 Oct 2022View
LONGITUDINAL SECTIONS 6 OF 8Drawing · PDF4 Oct 2022View
LONGITUDINAL SECTIONS 7 OF 8Drawing · PDF4 Oct 2022View
LONGITUDINAL SECTIONS 8 OF 8Drawing · PDF4 Oct 2022View
S104 AGREEMENT PLAN 1 OF 6Drawing · PDF4 Oct 2022View
S104 AGREEMENT PLAN 2 OF 6Drawing · PDF4 Oct 2022View
S104 AGREEMENT PLAN 3 OF 6Drawing · PDF4 Oct 2022View
S104 AGREEMENT PLAN 4 OF 6Drawing · PDF4 Oct 2022View
S104 AGREEMENT PLAN 5 OF 6Drawing · PDF4 Oct 2022View
S104 AGREEMENT PLAN 6 OF 6Drawing · PDF4 Oct 2022View
FCC FLOW CONTROL CHAMBERS 1 OF 2Drawing · PDF4 Oct 2022View
FCC FLOW CONTROL CHAMBERS 2 OF 2Drawing · PDF4 Oct 2022View
SECTION 185 DRAINAGE PLANDrawing · PDF4 Oct 2022View
MANHOLE SCHEDULE 1 OF 2Drawing · PDF4 Oct 2022View
MANHOLE SCHEDULE 2 OF 2Drawing · PDF4 Oct 2022View
SECTION 38 COLOURED PLAN 1 OF 5Drawing · PDF4 Oct 2022View
SECTION 38 COLOURED PLAN 2 OF 5Drawing · PDF4 Oct 2022View
SECTION 38 COLOURED PLAN 3 OF 5Drawing · PDF4 Oct 2022View
SECTION 38 COLOURED PLAN 4 OF 5Drawing · PDF4 Oct 2022View
SECTION 38 COLOURED PLAN 5 OF 5Drawing · PDF4 Oct 2022View
SECTION 38 KERBING PLAN 1 OF 5Drawing · PDF4 Oct 2022View
SECTION 38 KERBING PLAN 2 OF 5Drawing · PDF4 Oct 2022View
SECTION 38 KERBING PLAN 3 OF 5Drawing · PDF4 Oct 2022View
SECTION 38 KERBING PLAN 4 OF 5Drawing · PDF4 Oct 2022View
SECTION 38 KERBING PLAN 5 OF 5Drawing · PDF4 Oct 2022View
DRAINAGE AREA PLAN 1 OF 2Drawing · PDF4 Oct 2022View
DRAINAGE AREA PLAN 2 OF 2Drawing · PDF4 Oct 2022View
LONGITUDINAL SECTIONS 1 OF 8Drawing · PDF4 Oct 2022View
LONGITUDINAL SECTIONS 2 OF 8Drawing · PDF4 Oct 2022View
LONGITUDINAL SECTIONS 3 OF 8Drawing · PDF4 Oct 2022View
LONGITUDINAL SECTIONS 4 OF 8Drawing · PDF4 Oct 2022View
SITE MANAGEMENT CONVEYANCE PLAN SHEET 1Drawing · PDF4 Oct 2022View
SITE MANAGEMENT CONVEYANCE PLAN SHEET 2Drawing · PDF4 Oct 2022View
EMPLOYMENT AND SKILLS PLANBackground Documents · PDF4 Oct 2022View
CONSTRUCTION TRAFFIC ROUTESBackground Documents · PDF4 Oct 2022View
LINACRE ROAD CONSTRAINTS PLANBackground Documents · PDF4 Oct 2022View
LINACRE ROAD PHASING PLANDrawing · PDF4 Oct 2022View
ROADS AND SEWERSDrawing · PDF4 Oct 2022View
STANDARD COMPOUND STYLE BBackground Documents · PDF4 Oct 2022View
BUILD ROUTE AND COMPOUNDS FIRST PHASE DRILLING GROUTINGDrawing · PDF4 Oct 2022View
ENABLING AND REMEDIATION EARTH WORKS PLANDrawing · PDF4 Oct 2022View
CONTAMINATION PLANNING SUMMARYBackground Documents · PDF4 Oct 2022View
NON-TECHNICAL SUMMARY OF ARBORICULTURAL IMPACT ASSESSMENTBackground Documents · PDF4 Oct 2022View
TREE SURVEY AND ARBORICULTURAL IMPACT REPORTBackground Documents · PDF4 Oct 2022View
APPENDIX E OUTFALL HEADWALL INSTALLATION GUIDANCE NOTE _COMPRESSEDBackground Documents · PDF4 Oct 2022View
APPENDIX F LINACRE RD MATERIALS STORAGE_COMPRESSEDBackground Documents · PDF4 Oct 2022View
APPENDIX G LINACRE RD PUMPING STANDING WATER AND EXCAVATIONS GUIDANCE NOTEBackground Documents · PDF4 Oct 2022View
APPENDIX H LINACRE RD MANAGING CONCRETE WASH WATER AND RUNOFF_COMPRESSEDBackground Documents · PDF4 Oct 2022View
APPENDIX I TEMPORARY SURFACE WATER DISCHARGE CONSENTS (ENGLAND AND WALES) GUIDANBackground Documents · PDF4 Oct 2022View
APPENDIX J LINACRE ROAD CHESTERFIELD SETTLEMENT TEST REPORT MAY 2022Background Documents · PDF4 Oct 2022View
APPENDIX K PIPE REACTOR PRODUCT INFORMATION 2020Background Documents · PDF4 Oct 2022View
LINACRE SCAR REPORT (NO APPENDICES)Background Documents · PDF4 Oct 2022View
APPENDIX A LINACRE RD SILT TOOL BOXBackground Documents · PDF4 Oct 2022View
APPENDIX B LINACRE RD SETTLEMENT POND GUIDANCEBackground Documents · PDF4 Oct 2022View
APPENDIX C LINACRE RD EXAMPLE MONITORING RECORD SHEETBackground Documents · PDF4 Oct 2022View
APPENDIX D LINACRE RD GEL FLOCCULANT DEPLOYMENT V0.3Background Documents · PDF4 Oct 2022View
CHEMICAL AND PAINT STORAGEBackground Documents · PDF4 Oct 2022View
PUMPING OUT EXCAVATIONSBackground Documents · PDF4 Oct 2022View
OIL AND FUEL STORAGE - ABOVE GROUNDBackground Documents · PDF4 Oct 2022View
REFUELLINGBackground Documents · PDF4 Oct 2022View
SPILL RESPONSEBackground Documents · PDF4 Oct 2022View
HAZARDOUS WASTE STORAGEBackground Documents · PDF4 Oct 2022View
INCIDENT REPORTING AND INVESTIGATIONBackground Documents · PDF4 Oct 2022View
EARTHWORKS AND CONTAMINATED LANDBackground Documents · PDF4 Oct 2022View
ECOLOGY AND BIODIVERSITYBackground Documents · PDF4 Oct 2022View
POLLUTION PREVENTIONBackground Documents · PDF4 Oct 2022View
WASTE MANAGEMENTBackground Documents · PDF4 Oct 2022View
SAFETY, HEALTH AND ENVIRONMENTAL CONSIDERATIONSBackground Documents · PDF4 Oct 2022View
TREE PROTECTIONBackground Documents · PDF4 Oct 2022View
SITE ACCOMODATION WELFARE UNITSBackground Documents · PDF4 Oct 2022View
CONCRETE WASHOUTBackground Documents · PDF4 Oct 2022View
DESIGN STAGE FIRE RISK ASSESSMENTBackground Documents · PDF4 Oct 2022View
CONSTRUCTION PHASE PLANBackground Documents · PDF4 Oct 2022View
ENVIRONMENTAL ASPECT AND IMPACT ASSESSMENTBackground Documents · PDF4 Oct 2022View
GEOENVIRONMENTAL APPRAISALBackground Documents · PDF4 Oct 2022View
HAZARDOUS GROUND GAS RISK ASSESSMENTBackground Documents · PDF4 Oct 2022View
TREE PROTECTION PLAN - DETAILED SECTIONS - SHEET 1Drawing · PDF4 Oct 2022View
TREE PROTECTION PLAN - DETAILED SECTIONS - SHEET 2Drawing · PDF4 Oct 2022View
TREE PROTECTION PLANDrawing · PDF4 Oct 2022View
HEADWALL DETAILSDrawing · PDF4 Oct 2022View
SUDS MANAGEMENT PLANBackground Documents · PDF4 Oct 2022View
LINACRE ROAD PLANNING CONDITIONS DRAINAGEBackground Documents · PDF4 Oct 2022View
CONDITION 46 LETTERBackground Documents · PDF4 Oct 2022View
CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLANBackground Documents · PDF4 Oct 2022View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Partial Discharge of Condition
FINAL DECISION LETTER DECISION LETTER
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.