Discharge of planning conditions 5 (period of consent), 15 (post construction noise monitoring) and 17 (ecological monitoring) of CHE/14/00224/FUL - rection of a single wind turbine with a maximum tip height of 84 metres, a substation (5.5m x 3.7m), a crane hard standing (35m x 15m) and foundations (10m x 10m), improvements to an existing access track and some new access track and temporary widening of existing junction on to Station Lane

Whittington Sewage Works Station Lane Old Whittington S41 9QU

DecidedReference: CHE/18/00576/DOCChesterfield Borough Council

Last published check: 3 Oct 2026, 10:24. Check the council record for more recent changes.

Application location

Whittington Sewage Works Station Lane Old Whittington S41 9QU

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Discharge of Conditions
Received
20 Aug 2018
Validated
20 Aug 2018
Determination deadline
15 Oct 2018
Local authority
Chesterfield Borough Council

Application overview

Discharge of planning conditions 5 (period of consent), 15 (post construction noise monitoring) and 17 (ecological monitoring) of CHE/14/00224/FUL - rection of a single wind turbine with a maximum tip height of 84 metres, a substation (5.5m x 3.7m), a crane hard standing (35m x 15m) and foundations (10m x 10m), improvements to an existing access track and some new access track and temporary widening of existing junction on to Station Lane

Proposal details

Reference
CHE/18/00576/DOC
Ward
Old Whittington
Agent
Barton Willmore

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 11 of 11

DocumentPublishedAction
DECISION LETTERDecision Notice · PDF8 Oct 2018View
DERBYSHIRE WILDLIFE TRUST COMMENTSConsultee Comment · PDF25 Sept 2018View
ENV HEALTH OFFICER COMMENTSConsultee Comment · PDF12 Sept 2018View
SITE LOCATION PLANDrawing · PDF20 Aug 2018View
ORNITHOLOGY REPORTBackground Documents · PDF20 Aug 2018View
NOISE REPORTBackground Documents · PDF20 Aug 2018View
CERTIFICATE OF CALIBRATIONBackground Documents · PDF20 Aug 2018View
COMPLIANCE MONITORING- R1-RS_PART3Background Documents · PDF20 Aug 2018View
COMPLIANCE MONITORING- R1-RS_PART4Background Documents · PDF20 Aug 2018View
COVERING LETTERCorrespondence · PDF20 Aug 2018View
COMPLETION CERTIFICATE OWWTG-ARP-ZZ-ZZ-CT-ZM-00003Background Documents · PDF20 Aug 2018View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Decision Issued Date

    Published milestoneCouncil source
  4. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Permission Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Discharge of Planning Conditions
DECISION LETTER

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.