Council planning record

Discharge of conditions 4 (Section 38 plans), 7 (bat mitigation), 9 (bat emergence), 17 (Phase 2 geotechnical site investigation), 18 (arboricultural method statement), 20 (surface water management plan), 21 (CEMP) and 23 (CEMP) of CHE/14/00404/OUT - Residential development - Revised plan received 16.03.18

Land North-East Of Sainsburys Roundabout Rother Way Chesterfield Derbyshire

DecidedReference: CHE/18/00061/DOCChesterfield Borough Council

Last published check: 4 Oct 2026, 00:32. Check the council record for more recent changes.

Application location

Land North-East Of Sainsburys Roundabout Rother Way Chesterfield Derbyshire

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Discharge of Conditions
Received
5 Feb 2018
Validated
5 Feb 2018
Determination deadline
2 Apr 2018
Local authority
Chesterfield Borough Council

Application overview

Discharge of conditions 4 (Section 38 plans), 7 (bat mitigation), 9 (bat emergence), 17 (Phase 2 geotechnical site investigation), 18 (arboricultural method statement), 20 (surface water management plan), 21 (CEMP) and 23 (CEMP) of CHE/14/00404/OUT - Residential development - Revised plan received 16.03.18

Proposal details

Reference
CHE/18/00061/DOC
Ward
Brimington South

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 140 of 140

DocumentPublishedAction
DISCHARGE OF CONDITIONS LETTERCorrespondence · PDF17 Jul 2019View
S38 LAYOUTDrawing · PDF17 Jul 2019View
HIGHWAY LAYOUTDrawing · PDF17 Jul 2019View
SURFACES AND KERBING LAYOUTDrawing · PDF17 Jul 2019View
DECISION LETTERDecision Notice · PDF3 Jul 2019View
DERBYS WILDLIFE TRUST COMMENTS 01.07Consultee Comment · PDF1 Jul 2019View
DERBYSHIRE WILDLIFR TRUST COMMENTS 28.06Consultee Comment · PDF28 Jun 2019View
DERBYS WILDLIFE TRUST COMMENTSConsultee Comment · PDF28 Jun 2019View
DCC HIGHWAYS COMMENTS - 21.06.2019Consultee Comment · PDF21 Jun 2019View
REMEDIATION METHOD STATEMENT - 29.03.2018Background Documents · PDF29 Mar 2019View
BATBackground Documents · PDF29 Mar 2019View
REPTILE MITIGATION STRATEGYBackground Documents · PDF29 Mar 2019View
BAT EMERGENCE SURVEYBackground Documents · PDF29 Mar 2019View
SITE INSPECTION REPORTBackground Documents · PDF29 Mar 2019View
SITE INSPECTION REPORTBackground Documents · PDF29 Mar 2019View
SECTIONS THROUGH LINK ROADDrawing · PDF25 Mar 2019View
SECTIONS THROUGH LINK ROADDrawing · PDF25 Mar 2019View
GA DETAILS - 1400 CULVERTDrawing · PDF25 Mar 2019View
GA DETAILS - PCC HEADWALLSDrawing · PDF25 Mar 2019View
LINK ROADS STANDARD EARTHWORKS DETAILSDrawing · PDF25 Mar 2019View
SURFACESDrawing · PDF25 Mar 2019View
SECTION 38 LAYOUTDrawing · PDF25 Mar 2019View
HIGHWAY LAYOUTDrawing · PDF25 Mar 2019View
HIGHWAY CONSTRUCTION DETAILS 1 OF 2Drawing · PDF25 Mar 2019View
HIGHWAY CONSTRUCTION DETAILS 2 OF 2Drawing · PDF25 Mar 2019View
LONG SECTION 1Drawing · PDF25 Mar 2019View
LONG SECTION 2Drawing · PDF25 Mar 2019View
LONG SECTION 3Drawing · PDF25 Mar 2019View
LONG SECTION 4Drawing · PDF25 Mar 2019View
LONG SECTION 5Drawing · PDF25 Mar 2019View
LONG SECTION 6Drawing · PDF25 Mar 2019View
LONG SECTION 7Drawing · PDF25 Mar 2019View
LONG SECTION 8Drawing · PDF25 Mar 2019View
LONG SECTION 9Drawing · PDF25 Mar 2019View
LONG SECTION 10Drawing · PDF25 Mar 2019View
GA DETAILS - BOX CULVERT/HEADWALLSDrawing · PDF25 Mar 2019View
GA DETAILS - 900 CULVERT/HEADWALLSDrawing · PDF25 Mar 2019View
S278 LAYOUTDrawing · PDF25 Mar 2019View
S278 LAYOUTDrawing · PDF25 Mar 2019View
PHASE 1 S38 LAYOUTDrawing · PDF25 Mar 2019View
PHASE 2 S38 LAYOUTDrawing · PDF25 Mar 2019View
BOX CULVERT - TYPICAL HEADWALL SECTIONDrawing · PDF25 Mar 2019View
PHASE 2 GEOTECHNICALBackground Documents · PDF25 Mar 2019View
ARBORICULTURAL METHOD STATEMENTBackground Documents · PDF25 Mar 2019View
GEOWEB 1 OF 5Background Documents · PDF25 Mar 2019View
GEOWEB 2 OF 5Background Documents · PDF25 Mar 2019View
GEOWEB 3 OF 5Background Documents · PDF25 Mar 2019View
GEOWEB 4 OF 5Background Documents · PDF25 Mar 2019View
GEOWEB 5 OF 5Background Documents · PDF25 Mar 2019View
COVER LETTERBackground Documents · PDF25 Mar 2019View
COVER LETTERBackground Documents · PDF22 Mar 2019View
DERBYS WILDLIFE TRUSTConsultee Comment · PDF4 Dec 2018View
DECISION NOTICEDecision Notice · PDF4 Dec 2018View
TREE OFFICER COMMENTSConsultee Comment · PDF3 Dec 2018View
DERBYS WILDLIFE TRUSTConsultee Comment · PDF22 Oct 2018View
COAL AUTHORITYConsultee Comment · PDF22 Oct 2018View
PROPOSED STREET LIGHTING AND ASSOCIATED ELECTRICAL WORKSDrawing · PDF19 Oct 2018View
COAL AUTHORITYConsultee Comment · PDF16 Oct 2018View
COAL AUTHORITY COMMENTSConsultee Comment · PDF15 Oct 2018View
ARBORICULTURAL METHOD STATEMENTBackground Documents · PDF11 Oct 2018View
LONG SECTIONS SHEET 6Drawing · PDF11 Oct 2018View
LONG SECTIONS SHEET 7Drawing · PDF11 Oct 2018View
LONG SECTIONS SHEET 8Drawing · PDF11 Oct 2018View
LONG SECTIONS SHEET 9Drawing · PDF11 Oct 2018View
LONG SECTIONS SHEET 10Drawing · PDF11 Oct 2018View
MANHOLE SCHEDULES SHEET 1Drawing · PDF11 Oct 2018View
MANHOLE SCHEDULES SHEET 2Drawing · PDF11 Oct 2018View
MANHOLE SCHEDULES SHEET 3Drawing · PDF11 Oct 2018View
SURFACE WATER HEADWALL SAS23Drawing · PDF11 Oct 2018View
SURFACE WATER HEADWALL SBS11Drawing · PDF11 Oct 2018View
SURFACE WATER HEADWALL SDS8Drawing · PDF11 Oct 2018View
TANK 1 FLOW CONTROL MANHOLE SAS22Drawing · PDF11 Oct 2018View
TANK 2 FLOW CONTROL MANHOLE SAS22Drawing · PDF11 Oct 2018View
TANK 3 FLOW CONTROL MANHOLE SAS22Drawing · PDF11 Oct 2018View
FLOOD ROUTING LAYOUTDrawing · PDF11 Oct 2018View
S104 LAYOUT PHASE 1Drawing · PDF11 Oct 2018View
S104 LAYOUT PHASE 2Drawing · PDF11 Oct 2018View
LONG SECTION SHEET 5Drawing · PDF11 Oct 2018View
LONG SECTION SHEET 5Drawing · PDF11 Oct 2018View
LONG SECTION SHEET 4Drawing · PDF11 Oct 2018View
LONG SECTION SHEET 1Drawing · PDF11 Oct 2018View
LONG SECTION SHEET 3Drawing · PDF11 Oct 2018View
SURFACES AND KERBING LAYOUTDrawing · PDF11 Oct 2018View
SECTIONS THROUGH LINK ROADDrawing · PDF11 Oct 2018View
SECTIONS THROUGH LINK ROADDrawing · PDF11 Oct 2018View
900MM CULVERTDrawing · PDF11 Oct 2018View
BOX CULVERT/ HEADWALLSDrawing · PDF11 Oct 2018View
1400MM CULVERTDrawing · PDF11 Oct 2018View
HIGHWAY CONSTRUCTION DETAILS SHEET 1 OF 2Drawing · PDF11 Oct 2018View
HIGHWAY CONSTRUCTION DETAILS SHEET 2 OF 2Drawing · PDF11 Oct 2018View
S38 LAYOUT PLANDrawing · PDF11 Oct 2018View
LONG SECTIONS SHEET 11 RISING MAINDrawing · PDF11 Oct 2018View
LINK ROAD EARTHWORK DETAILSDrawing · PDF11 Oct 2018View
HIGHWAY LAYOUTDrawing · PDF11 Oct 2018View
S278 LAYOUTDrawing · PDF11 Oct 2018View
PHASE 1 S38 LAYOUTDrawing · PDF11 Oct 2018View
PHASE 2 S38 LAYOUTDrawing · PDF11 Oct 2018View
BOX CULVERT - TYPICAL HEADWALLS SECTIONDrawing · PDF11 Oct 2018View
YORKSHIRE WATER COMMENTSConsultee Comment · PDF11 Oct 2018View
S38 - STREET LIGHTING & ELECTRICAL DESIGNBackground Documents · PDF11 Oct 2018View
PHASE 2 GEOTECHNICAL SITE INVESTIGATION REPORT - 29.03.18Background Documents · PDF29 Mar 2018View
HIGHWAYS LAYOUT - 29.03.2018Drawing · PDF29 Mar 2018View
REMEDIATION METHOD STATEMENT - 29.03.2018Background Documents · PDF29 Mar 2018View
CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN - 29.03.2018Background Documents · PDF29 Mar 2018View
DECISION NOTICEDecision Notice · PDF27 Mar 2018View
DCC HIGHWAYS COMMENTSConsultee Comment · PDF21 Mar 2018View
COAL AUTHORITY COMMENTSConsultee Comment · PDF20 Mar 2018View
FORWARD PLANNING COMMENTSConsultee Comment · PDF19 Mar 2018View
DERBYSHIRE WILDLIFE TRUST COMMENTSConsultee Comment · PDF16 Mar 2018View
SURFACE WATER MANAGEMENT PLAN - 22.03.18Revised Drawing · PDF16 Mar 2018View
FLOOD RISK MANAGEMENT TEAM COMMENTSConsultee Comment · PDF14 Mar 2018View
DCC HIGHWAYS COMMENTSConsultee Comment · PDF8 Mar 2018View
HIGHWAY LAYOUT PLAN 41379/022 - BDrawing · PDF27 Feb 2018View
EXTERNAL WORKS SHEET 2 - 41379/014 - GDrawing · PDF27 Feb 2018View
SURFACE WATER MANAGEMENT 41379/058 - BDrawing · PDF27 Feb 2018View
TREE OFFICER COMMENTSConsultee Comment · PDF13 Feb 2018View
41379_008B - LINK ROAD SECTIONSBackground Documents · PDF5 Feb 2018View
LINK ROAD SECTIONS SHEET 2Drawing · PDF5 Feb 2018View
EXTERNAL WORKS SHEET 1Drawing · PDF5 Feb 2018View
SURFACES AND KERBING LAYOUTDrawing · PDF5 Feb 2018View
LAYOUTDrawing · PDF5 Feb 2018View
HIGHWAY CONSTRUCTION DETAILS SHEET 1 OF 2Drawing · PDF5 Feb 2018View
HIGHWAY CONSTRUCTION DETAILS SHEET 2 OF 2Drawing · PDF5 Feb 2018View
41379_025A - MASONRY RETAINING WALLSDrawing · PDF5 Feb 2018View
GABION WALL DETAILSDrawing · PDF5 Feb 2018View
LONG SECTIONS SHEET 1Drawing · PDF5 Feb 2018View
LONG SECTIONS SHEET 2Drawing · PDF5 Feb 2018View
LONG SECTIONS SHEET 3Drawing · PDF5 Feb 2018View
LONG SECTIONS SHEET 4Drawing · PDF5 Feb 2018View
LONG SECTIONS SHEET 5Drawing · PDF5 Feb 2018View
LONG SECTIONS SHEET 8Drawing · PDF5 Feb 2018View
LONG SECTIONS SHEET 7Drawing · PDF5 Feb 2018View
LONG SECTIONS SHEET 9Drawing · PDF5 Feb 2018View
41379_046A - LONG SECTIONS SHEET 10Drawing · PDF5 Feb 2018View
D-2962-01.1Drawing · PDF5 Feb 2018View
LONG SECTIONS SHEET 6Drawing · PDF5 Feb 2018View
R-2962-03Background Documents · PDF5 Feb 2018View
310118 AMS TREE PROTECTION WHEELDON MILLS AWA2109Background Documents · PDF5 Feb 2018View
41379-007-TEMPORARY RUNOFF MANAGEMENTBackground Documents · PDF5 Feb 2018View
APPLICATIONFORMApplication Form · PDF5 Feb 2018View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Decision Issued Date

    Published milestoneCouncil source
  4. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Permission Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Discharge of Planning Conditions
DECISION LETTER DECISION NOTICE DECISION NOTICE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.