Council planning record

Discharge of planning conditions 7 (Phase I Geo-Enviornmental Assessment Report), 13 (Site Access), 16 (Infrastructure), 19(Temporary site access) and 20 (Construction method statement) of CHE/16/00016/OUT - Resubmission of CHE/14/00873/OUT - Residential development along with associated access, public open space, landscaping and surface water balancing (all matters reserved save for means of access into the site)

Land To The West Of Dunston Lane Newbold Derbyshire

DecidedReference: CHE/17/00449/DOCChesterfield Borough Council

Last published check: 4 Oct 2026, 10:39. Check the council record for more recent changes.

Application location

Land To The West Of Dunston Lane Newbold Derbyshire

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Discharge of Conditions
Received
22 Jun 2017
Validated
27 Jun 2017
Determination deadline
22 Aug 2017
Local authority
Chesterfield Borough Council

Application overview

Discharge of planning conditions 7 (Phase I Geo-Enviornmental Assessment Report), 13 (Site Access), 16 (Infrastructure), 19(Temporary site access) and 20 (Construction method statement) of CHE/16/00016/OUT - Resubmission of CHE/14/00873/OUT - Residential development along with associated access, public open space, landscaping and surface water balancing (all matters reserved save for means of access into the site)

Proposal details

Reference
CHE/17/00449/DOC
Ward
Dunston

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 40 of 40

DocumentPublishedAction
REVISED HIGHWAYS DRAWINGS / INFORevised Drawing · PDF24 Aug 2017View
REVISED HIGHWAYS DRAWINGS / INFORevised Drawing · PDF24 Aug 2017View
REVISED HIGHWAYS DRAWINGS / INFORevised Drawing · PDF24 Aug 2017View
REVISED HIGHWAYS DRAWINGS / INFORevised Drawing · PDF24 Aug 2017View
REVISED HIGHWAYS DRAWINGS / INFORevised Drawing · PDF24 Aug 2017View
REVISED HIGHWAYS DRAWINGS / INFORevised Drawing · PDF24 Aug 2017View
REVISED HIGHWAYS DRAWINGS / INFORevised Drawing · PDF24 Aug 2017View
REVISED HIGHWAYS DRAWINGS / INFORevised Drawing · PDF24 Aug 2017View
REVISED HIGHWAYS DRAWINGS / INFORevised Drawing · PDF24 Aug 2017View
REVISED HIGHWAYS DRAWINGS / INFORevised Drawing · PDF24 Aug 2017View
REVISED HIGHWAYS DRAWINGS / INFORevised Drawing24 Aug 2017View
REVISED HIGHWAYS DRAWINGS / INFORevised Drawing · PDF24 Aug 2017View
EMAIL WITH REVISED HIGHWAYS DRAWINGS / INFOCorrespondence · PDF24 Aug 2017View
REVISED HIGHWAYS DRAWINGS / INFORevised Drawing · PDF24 Aug 2017View
DCC - HIGHWAYS COMMENTS - 23.08.17Consultee Comment · PDF23 Aug 2017View
DECISION LETTERDecision Notice · PDF22 Aug 2017View
DCC HIGHWAYS COMMENTSConsultee Comment · PDF28 Jul 2017View
CBC ENV HEALTHConsultee Comment · PDF18 Jul 2017View
CONSTRUCTION METHOD STATEMENTBackground Documents28 Jun 2017View
COMPOUND PLANBackground Documents · PDF28 Jun 2017View
DGI-BWB-HDG-XX-DR-D-500_DRAINAGE LAYOUT_1OF2-S4-P3Other · PDF22 Jun 2017View
DGI-BWB-HDG-XX-DR-D-501_DRAINAGE LAYOUT_2OF2-S4-P3Other · PDF22 Jun 2017View
DGI-BWB-HGN-XX-DR-D-130_CROSS SECTION-S4-P3Other · PDF22 Jun 2017View
DGI-BWB-HKF-XX-DR-D-720_PAVEMENT CONSTRUCTION DETAILS-SHEET 1 OF 3-S4-P3Other · PDF22 Jun 2017View
DGI-BWB-HKF-XX-DR-D-721_PAVEMENT CONSTRUCTION DETAILS-SHEET 2 OF 3-S4-P3Other · PDF22 Jun 2017View
DGI-BWB-HKF-XX-DR-D-722_PAVEMENT CONSTRUCTION DETAILS-S4-P2Other · PDF22 Jun 2017View
DGI-BWB-HKF-XX-DR-D-1100_FOOTWAY AND KERBING LAYOUT-SHEET 1 OF 2-S4-P3Other · PDF22 Jun 2017View
DGI-BWB-HKF-XX-DR-D-1101_FOOTWAY AND KERBING LAYOUT-SHEET 2 OF 2-S4-P3Other · PDF22 Jun 2017View
DGI-BWB-HML-XX-DR-D-100_GENERAL ARRANGEMENT AND VISIBILITY-S4-P2Other · PDF22 Jun 2017View
DGI-BWB-HML-XX-DR-D-135_DETAILED CROSS SECTIONS SHEET 1 OF 2-S4-P3Other · PDF22 Jun 2017View
DGI-BWB-HML-XX-DR-D-136_DETAILED CROSS SECTION-S4-P2Other · PDF22 Jun 2017View
DGI-BWB-HSC-XX-DR-D-201_SITE CLEARANCE LAYOUT-S4-P2Other · PDF22 Jun 2017View
DGI-BWB-HSN-XX-DR-D-1200_ROAD MARKINGOther · PDF22 Jun 2017View
DGI-BWB-HSN-XX-DR-D-1201_ROAD MARKINGOther · PDF22 Jun 2017View
DGI-BWB-HSN-XX-DR-D-1202_ROAD MARKINGSOther · PDF22 Jun 2017View
BT OPENREACHOther · PDF22 Jun 2017View
ATTACHMENTSUMMARYOther · PDF22 Jun 2017View
APPLICATIONFORMNOPERSONALDATAApplication Form · PDF22 Jun 2017View
COVERING LETTEROther · PDF22 Jun 2017View
EXPLORATORY INVESTIGATION REPORTBackground Documents · PDF22 Jun 2017View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Decision Issued Date

    Published milestoneCouncil source
  4. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Permission Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Discharge of Planning Conditions
DECISION LETTER
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.