Construction of a new Energy Generation Compound (EGC), installation of a new low temperature hot water (LTHW) distribution network, decentralised heat pump installations and associated infrastructure.The Trust has engaged Vital Energi to carry out a comprehensive installation of new heat pump equipment which will reduce the Trust?s carbon emissions. The proposed project will replace this arrangement with a modern, efficient and future-ready low temperature hot water network designed to significantly improve energy efficiency, reduce carbon emissions and provide resilience for future decarbonisation opportunities.In summary, the proposed works comprise below which will be installed, on a permanent basis, built within boundary of the Hospital.1. New Energy Generation CompoundConstruction of a new Energy Generation Compound housing:? 2 No. 5MW high efficiency gas-fired LTHW boilers? 1 No. 11m high chimney and associated flue arrangements? Pressurisation systems? Expansion plant? Water treatment equipment? Associated mechanical services? Building management systems? Electrical infrastructure2. Distribution InfrastructureConstruction of:? New primary LTHW distribution network? Interconnecting pipework systems3. Heat Generation and Plant Infrastructure (5 No. decentralised Air Source Heat Pump systems)? Creche? Longhouse? Martindale House? Moston Lodge? EDTC & Postgraduate4. SubstationConstruction of a new Substation housing:? Transformer? LV Switchboard
The Countess of Chester Hospital The Countess of Chester Health Park Liverpool Road Upton Chester CH2 1UL
Construction of a new Energy Generation Compound (EGC), installation of a new low temperature hot water (LTHW) distribution network, decentralised heat pump installations and associated infrastructure.The Trust has engaged Vital Energi to carry out a comprehensive installation of new heat pump equipment which will reduce the Trust?s carbon emissions. The proposed project will replace this arrangement with a modern, efficient and future-ready low temperature hot water network designed to significantly improve energy efficiency, reduce carbon emissions and provide resilience for future decarbonisation opportunities.In summary, the proposed works comprise below which will be installed, on a permanent basis, built within boundary of the Hospital.1. New Energy Generation CompoundConstruction of a new Energy Generation Compound housing:? 2 No. 5MW high efficiency gas-fired LTHW boilers? 1 No. 11m high chimney and associated flue arrangements? Pressurisation systems? Expansion plant? Water treatment equipment? Associated mechanical services? Building management systems? Electrical infrastructure2. Distribution InfrastructureConstruction of:? New primary LTHW distribution network? Interconnecting pipework systems3. Heat Generation and Plant Infrastructure (5 No. decentralised Air Source Heat Pump systems)? Creche? Longhouse? Martindale House? Moston Lodge? EDTC & Postgraduate4. SubstationConstruction of a new Substation housing:? Transformer? LV Switchboard
Reference
26/02179/FUL
Alternative references
PP-15075135
Ward
Upton
Parish
Bache
Agent
Project Co-ordinator Chun Kit Li
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.