Awaiting decisionCouncil status: Awaiting decision

Construction of a new Energy Generation Compound (EGC), installation of a new low temperature hot water (LTHW) distribution network, decentralised heat pump installations and associated infrastructure.The Trust has engaged Vital Energi to carry out a comprehensive installation of new heat pump equipment which will reduce the Trust?s carbon emissions. The proposed project will replace this arrangement with a modern, efficient and future-ready low temperature hot water network designed to significantly improve energy efficiency, reduce carbon emissions and provide resilience for future decarbonisation opportunities.In summary, the proposed works comprise below which will be installed, on a permanent basis, built within boundary of the Hospital.1. New Energy Generation CompoundConstruction of a new Energy Generation Compound housing:? 2 No. 5MW high efficiency gas-fired LTHW boilers? 1 No. 11m high chimney and associated flue arrangements? Pressurisation systems? Expansion plant? Water treatment equipment? Associated mechanical services? Building management systems? Electrical infrastructure2. Distribution InfrastructureConstruction of:? New primary LTHW distribution network? Interconnecting pipework systems3. Heat Generation and Plant Infrastructure (5 No. decentralised Air Source Heat Pump systems)? Creche? Longhouse? Martindale House? Moston Lodge? EDTC & Postgraduate4. SubstationConstruction of a new Substation housing:? Transformer? LV Switchboard

The Countess of Chester Hospital The Countess of Chester Health Park Liverpool Road Upton Chester CH2 1UL

Cheshire West and Chester CouncilReference 26/02179/FULFull Application

Last published check: 14 Sept 2026, 13:24. Check the council record for more recent changes.

Status and dates

Last published check: 14 Sept 2026, 13:24 (UK)

  1. DoneReceived14 Jul 2026
  2. DoneValidated28 Aug 2026
  3. Not publishedConsultationNo date on council record
  4. Not publishedTarget decision dateNo date on council record
  5. Not yet publishedDecisionNo decision on council record

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (2)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
Application type
Full Application
Ward
Upton
Parish
Bache
Documents
54 published

Proposal

Construction of a new Energy Generation Compound (EGC), installation of a new low temperature hot water (LTHW) distribution network, decentralised heat pump installations and associated infrastructure.The Trust has engaged Vital Energi to carry out a comprehensive installation of new heat pump equipment which will reduce the Trust?s carbon emissions. The proposed project will replace this arrangement with a modern, efficient and future-ready low temperature hot water network designed to significantly improve energy efficiency, reduce carbon emissions and provide resilience for future decarbonisation opportunities.In summary, the proposed works comprise below which will be installed, on a permanent basis, built within boundary of the Hospital.1. New Energy Generation CompoundConstruction of a new Energy Generation Compound housing:? 2 No. 5MW high efficiency gas-fired LTHW boilers? 1 No. 11m high chimney and associated flue arrangements? Pressurisation systems? Expansion plant? Water treatment equipment? Associated mechanical services? Building management systems? Electrical infrastructure2. Distribution InfrastructureConstruction of:? New primary LTHW distribution network? Interconnecting pipework systems3. Heat Generation and Plant Infrastructure (5 No. decentralised Air Source Heat Pump systems)? Creche? Longhouse? Martindale House? Moston Lodge? EDTC & Postgraduate4. SubstationConstruction of a new Substation housing:? Transformer? LV Switchboard

Reference
26/02179/FUL
Alternative references
PP-15075135
Ward
Upton
Parish
Bache
Agent
Project Co-ordinator Chun Kit Li

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • CONDITION ASSESSMENT - COUNTESS OF CHESTER HOSPITAL HOSPITALDocument28 Aug 2026View
  • BNG METRIC - COUNTESS OF CHESTER HOSPITALDocument28 Aug 2026View
  • LOCATION PLANDrawing28 Aug 2026View
  • PROPOSED GENERATOR ELEVATIONSDrawing28 Aug 2026View
  • EXISTING ELEVATIONSDrawing28 Aug 2026View
  • GENERATOR PROPOSED SITE PLANDrawing28 Aug 2026View
  • GENERATOR EXISTING SITE PLANDrawing28 Aug 2026View
  • ECOLOGICAL IMPACT ASSESSMENTDocument28 Aug 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Decision not yet published

Appeal status: Unknown

Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.