Repair works to concrete coping to the offside upstream and repair/replace stop plank grooves on the upstream side of the lock. Replacement of bottom end lock gates, coursed masonry and concrete to upstream approach wall/gate recess (towpath side) and replacement of lock ladder hoops. Installation of one mooring bollard on the lock side (towpath side) and two mooring rings on the downstream approach (towpath side).
Repair works to concrete coping to the offside upstream and repair/replace stop plank grooves on the upstream side of the lock. Replacement of bottom end lock gates, coursed masonry and concrete to upstream approach wall/gate recess (towpath side) and replacement of lock ladder hoops. Installation of one mooring bollard on the lock side (towpath side) and two mooring rings on the downstream approach (towpath side).
Reference
25/02551/LBC
Alternative references
PP-14250810
Ward
Marbury
Parish
Dutton
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.