Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
East West Rail Network Phase 2 The Scheme Railway From London Road Bicester To Station Road Launton
East West Rail Network Phase 2 The Scheme Railway From London Road Bicester To Station Road Launton
This record has no verified map location.
Discharge of condition 15a (Construction Traffic Management Plan) of 18/01430/TWAO - Development Stages A1 and A2
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| Applicant e-mailApplication Documents | 10 Mar 2020 | View |
| Applicant 3/3/20Application Documents | 12 Mar 2020 | View |
| Stage 2A3 - Construction Traffic Management PlanSupporting Documents | 19 Mar 2020 | View |
| Stage 2A3 CTMP App ASupporting Documents | 19 Mar 2020 | View |
| Stage 2A3 CTMP App BSupporting Documents | 19 Mar 2020 | View |
| Stage 2A3 CTMP App CSupporting Documents | 19 Mar 2020 | View |
| Stage 2A3 CTMP App DSupporting Documents | 19 Mar 2020 | View |
| Stage 2A3 CTMP App ESupporting Documents | 19 Mar 2020 | View |
| Stage 2A3 CTMP App FSupporting Documents | 19 Mar 2020 | View |
| Stage 2A3 - Indicative Schedule For Highways & Public Rights of Way ClosuresSupporting Documents | 19 Mar 2020 | View |
| Stage 2A3 Indicative Schedule Dr 1Supporting Documents | 19 Mar 2020 | View |
| Stage 2A3 Indicative Schedule Dr 2Supporting Documents | 19 Mar 2020 | View |
| Stage 2A3 Indicative Schedule Dr 3Supporting Documents | 19 Mar 2020 | View |
| Stage 2A3 Indicative Schedule Dr 4Supporting Documents | 19 Mar 2020 | View |
| Stage 2A3 Indicative Schedule Dr 5Supporting Documents | 19 Mar 2020 | View |
| Stage 2A3 Indicative Schedule Dr 6Supporting Documents | 19 Mar 2020 | View |
| Stage 2A3 Indicative Schedule Dr 7Supporting Documents | 19 Mar 2020 | View |
| Stage 2A3 Indicative Schedule Dr 8Supporting Documents | 19 Mar 2020 | View |
| Stage 2A3 Indicative Schedule Dr 10Supporting Documents | 19 Mar 2020 | View |
| Stage 2A3 Indicative Schedule Dr 11Supporting Documents | 19 Mar 2020 | View |
| Stage 2A3 Indicative Schedule Dr 12Supporting Documents | 19 Mar 2020 | View |
| Stage 2A3 Indicative Schedule Dr 13Supporting Documents | 19 Mar 2020 | View |
| Stage 2A4 Construction Traffic Management PlanSupporting Documents | 19 Mar 2020 | View |
| Stage 2A4 CTMP App ASupporting Documents | 19 Mar 2020 | View |
| Stage 2A4 CTMP App BSupporting Documents | 19 Mar 2020 | View |
| Stage 2A4 CTMP App CSupporting Documents | 19 Mar 2020 | View |
| Stage 2A4 CTMP App DSupporting Documents | 19 Mar 2020 | View |
| Stage 2A4 CTMP App ESupporting Documents | 19 Mar 2020 | View |
| Stage 2A4 Indicative Schedule for Highways & Public Rights of Way ClosuresSupporting Documents | 19 Mar 2020 | View |
| Stage 2A4 indicative schedule Dr 1Supporting Documents | 19 Mar 2020 | View |
| Stage 2A4 indicative schedule Dr 2Supporting Documents | 19 Mar 2020 | View |
| Stage 2A4 indicative schedule Dr 3Supporting Documents | 19 Mar 2020 | View |
| Stage 2A4 indicative schedule Dr 4Supporting Documents | 19 Mar 2020 | View |
| Stage 2A4 indicative schedule Dr 5Supporting Documents | 19 Mar 2020 | View |
| Stage 2A4 indicative schedule Dr 6Supporting Documents | 19 Mar 2020 | View |
| Stage 2A4 indicative schedule Dr 7Supporting Documents | 19 Mar 2020 | View |
| Stage 2A4 indicative schedule Dr 8Supporting Documents | 19 Mar 2020 | View |
| Stage 2A4 indicative schedule Dr 9Supporting Documents | 19 Mar 2020 | View |
| Stage 2A4 indicative schedule Dr 10Supporting Documents | 19 Mar 2020 | View |
| Stage 2A4 indicative schedule Dr 11Supporting Documents | 19 Mar 2020 | View |
| Pavement Assessment Report for Oxfordshire CouncilSupporting Documents | 19 Mar 2020 | View |
| Stage 2A1 Departrure N003 informationSupporting Documents | 23 Apr 2020 | View |
| Stage 2A2 Road Safety Audit responseSupporting Documents | 24 Apr 2020 | View |
| Stage 3A2 Stage 2 Road Safety OfficerSupporting Documents | 24 Apr 2020 | View |
| Technical Approval Certificate 000045Supporting Documents | 24 Apr 2020 | View |
| Technical Approval Certificate 000058Supporting Documents | 24 Apr 2020 | View |
| Technical approval certificate 000062Supporting Documents | 24 Apr 2020 | View |
| Technical approval certificate 000078Supporting Documents | 24 Apr 2020 | View |
| Technical approval certificate 000088Supporting Documents | 24 Apr 2020 | View |
| Technical approval certificate 0000091Supporting Documents | 24 Apr 2020 | View |
| Technical Note - Offline Highways rev B01Supporting Documents | 1 May 2020 | View |
| 2A1 Construction Trafic Management PlanSupporting Documents | 7 Jul 2020 | View |
| Stage 2A1 CTMP App A Construction Access RoutesSupporting Documents | 12 Jun 2020 | View |
| Stage 2A1 CTMP App B Indicative Roadspace/PRoW Booking scheduleSupporting Documents | 12 Jun 2020 | View |
| Stage 2A1 CTMP App C Dev Stage Layout rev 2Supporting Documents | 12 Jun 2020 | View |
| Stage 2A1 CTMP App D GA plans rev 2Supporting Documents | 12 Jun 2020 | View |
| Stage 2A1 CTMP App E Pre commencement surveySupporting Documents | 12 Jun 2020 | View |
| Stage 2A1 CTMP App F Compound A1 layoutSupporting Documents | 12 Jun 2020 | View |
| Stage 2A1 CTMP App G - Offline Highways improvement worksSupporting Documents | 12 Jun 2020 | View |
| Stage 2A1 CTMP App H Signage strategy rev 2.1Supporting Documents | 12 Jun 2020 | View |
| Stage 2A1 CTMP App H Signage strategy rev 2.2Supporting Documents | 12 Jun 2020 | View |
| Stage 2A1 CTMP App H Signage strategy rev 2.3Supporting Documents | 12 Jun 2020 | View |
| Stage 2A1 CTMP App H Signage strategy rev 2.4Supporting Documents | 12 Jun 2020 | View |
| Stage 2A1 CTMP App H Signage strategy rev 2.5Supporting Documents | 12 Jun 2020 | View |
| Stage 2A1 CTMP App H Signage strategy rev 2.6Supporting Documents | 12 Jun 2020 | View |
| Stage 2A1 CTMP App H Signage strategy rev 2.7Supporting Documents | 12 Jun 2020 | View |
| Stage 2A1 CTMP App H Signage strategy rev 2.8Supporting Documents | 12 Jun 2020 | View |
| Stage 2A1 CTMP App H Signage strategy rev 2.9Supporting Documents | 12 Jun 2020 | View |
| Stage 2A1 CTMP App H Signage strategy rev 2.10Supporting Documents | 12 Jun 2020 | View |
| Stage 2A1 CTMP App H Signage strategy rev 2.11Supporting Documents | 12 Jun 2020 | View |
| Stage 2A1 CTMP App H Signage strategy rev 2.12Supporting Documents | 12 Jun 2020 | View |
| Stage 2A1 CTMP App H Signage strategy rev 2.13Supporting Documents | 12 Jun 2020 | View |
| Stage 2A1 CTMP App H Signage strategy rev 2.14Supporting Documents | 12 Jun 2020 | View |
| Stage 2A1 CTMP App H Signage strategy rev 2.15Supporting Documents | 12 Jun 2020 | View |
| Stage 2A1 CTMP App H Signage strategy rev 2.16Supporting Documents | 12 Jun 2020 | View |
| Stage 2A1 CTMP App H Signage strategy rev 2.17Supporting Documents | 12 Jun 2020 | View |
| Stage 2A1 CTMP App H Signage strategy rev 2.18Supporting Documents | 12 Jun 2020 | View |
| Stage 2A1 CTMP App H Signage strategy rev 2.19Supporting Documents | 12 Jun 2020 | View |
| Stage 2A1 CTMP App H Signage strategy rev 2.20Supporting Documents | 12 Jun 2020 | View |
| Stage 2A1 CTMP App H Signage strategy rev 2.21Supporting Documents | 12 Jun 2020 | View |
| Stage 2A1 CTMP App I Traffic Management DesignSupporting Documents | 7 Jul 2020 | View |
| Stage 2A2 CTMP Construction Traffic Management PlanSupporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App A Construction AccessSupporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App B Indicative Roadspace & PRoW Booking Schedule v2Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App C Development Stage 4 Layout rev 4Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App D GA PlansSupporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App E -Pre Commencement survey 1Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App E- Pre commencement survey pt 2Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App F Compound A2 layoutSupporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App G- Offline HIghways Improvement Works pt 1Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App G- Offline HIghways Improvement Works pt 2Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App G- Offline HIghways Improvement Works pt 3Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App G- Offline HIghways Improvement Works pt 4Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App G- Offline HIghways Improvement Works pt 5Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App G- Offline HIghways Improvement Works pt 6Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App G- Offline HIghways Improvement Works pt 7Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App G- Offline HIghways Improvement Works pt 8Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App G- Offline HIghways Improvement Works pt 9Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App G- Offline HIghways Improvement Works pt 10Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App G- Offline HIghways Improvement Works pt 11Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App G- Offline HIghways Improvement Works pt 12Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App G- Offline HIghways Improvement Works pt 13Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App G- Offline HIghways Improvement Works pt 14Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App G- Offline HIghways Improvement Works pt 15Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App G- Offline HIghways Improvement Works pt 16Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App G- Offline HIghways Improvement Works pt 17Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App G- Offline HIghways Improvement Works pt 18Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App G- Offline HIghways Improvement Works pt 19Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App G- Offline HIghways Improvement Works pt 20Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App G- Offline HIghways Improvement Works pt 21Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App G- Offline HIghways Improvement Works pt 22Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App G- Offline HIghways Improvement Works pt 23Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App G- Offline HIghways Improvement Works pt 24Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App G- Offline HIghways Improvement Works pt 25Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App H- Signage Strategy rev 2.1Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App H - Signage Strategy rev 2.2Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App H - Signage Strategy rev 2.3Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App H - Signage Strategy rev 2.4Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App H - Signage Strategy rev 2.5Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App H - Signage Strategy rev 2.6Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App H - Signage Strategy rev 2.7Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App H - Signage Strategy rev 2.8Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App H - Signage Strategy rev 2.10Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App H - Signage Strategy rev 2.9Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App H - Signage Strategy rev 2.11Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App H - Signage Strategy rev 2.12Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App H - Signage Strategy rev 2.13Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App H - Signage Strategy rev 2.14Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App H - Signage Strategy rev 2.15Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App H - Signage Strategy rev 2.16Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App H - Signage Strategy rev 2.17Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App H - Signage Strategy rev 2.18Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App H - Signage Strategy rev 2.19Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App H - Signage Strategy rev 2.20Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App H - Signage Strategy rev 2.21Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App H - Signage Strategy rev 2.22Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App H - Signage Strategy rev 2.23Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App H - Signage Strategy rev 2.24Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App H - Signage Strategy rev 2.25Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App H - Signage Strategy rev 2.26Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App H - Signage Strategy rev 2.27Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App H - Signage Strategy rev 2.28Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App H - Signage Strategy rev 2.29Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App H - Signage Strategy rev 2.30Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App H - Signage Strategy rev 2.31Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App H - Signage Strategy rev 2.32Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App H - Signage Strategy rev 2.33Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App I - pt 1Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App I - pt 2Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App I - pt 3Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App I - pt 4Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App I - pt 5Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App I - pt 6Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App I - pt 7Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App I - pt 8Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App I - pt 9Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App I - pt 10Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App I - pt 11Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App I - pt 12Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App I - pt 13Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App I - pt 14Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App I - pt 15Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App I - pt 16Supporting Documents | 12 Jun 2020 | View |
| Stage 2A2 CTMP App I - pt 17Supporting Documents | 12 Jun 2020 | View |
| A1,A2,A3,A4 Multuiple signing SchemePlans – Details | 19 Mar 2020 | View |
| Compound A2 Launton construction access route signingPlans – Details | 19 Mar 2020 | View |
| Compound A2 Launton construction acces route signingPlans – Details | 19 Mar 2020 | View |
| Compound A2 launton consturcion acces route signingPlans – Details | 19 Mar 2020 | View |
| Compound A2 Launton construction access route signingPlans – Details | 19 Mar 2020 | View |
| Compound A2 launton construction access route signingPlans – Details | 19 Mar 2020 | View |
| Compound A2 Launtononstruction Access Route SigningPlans – Details | 19 Mar 2020 | View |
| Compound A2 Launton Construction Access Route signingPlans – Details | 19 Mar 2020 | View |
| Compound A2 -Launton Construction Access Route SigningPlans – Details | 19 Mar 2020 | View |
| Compound A2 - Launton Construction Access Route SigningPlans – Details | 19 Mar 2020 | View |
| Compound A2 - Launton Construction Access Route SigningPlans – Details | 19 Mar 2020 | View |
| Compound A2 - Launton Construction Access Route Signing Drawings - 26022020_Part4-2Plans – Details | 19 Mar 2020 | View |
| Compound A2 - Launton Construction Access Route SigningPlans – Details | 19 Mar 2020 | View |
| Compound A2 - Launton Construction Access Route SigningPlans – Details | 19 Mar 2020 | View |
| Compound A2 - Launton Construction Access Route SigningPlans – Details | 19 Mar 2020 | View |
| Compound A2 - Launton Construction Access Route SigningPlans – Details | 19 Mar 2020 | View |
| Compound A2 - Launton Construction Access Route SigningPlans – Details | 19 Mar 2020 | View |
| Compound A3 - Marsh Gibbon Construction Access Route Signing 1Plans – Details | 19 Mar 2020 | View |
| Compound A3 - Marsh Gibbon Construction Access Route Signing Sh 2Plans – Details | 19 Mar 2020 | View |
| Compound A3 - Marsh Gibbon Construction Access Route Signing Sh 3Plans – Details | 19 Mar 2020 | View |
| Compound A3 - Marsh Gibbon Construction Access Route Signing Sh 4Plans – Details | 19 Mar 2020 | View |
| Compound A3 - Marsh Gibbon Construction Access Route Signing Sh 5Plans – Details | 19 Mar 2020 | View |
| Compound A3 - Marsh Gibbon Construction Access Route Signing Sh 6Plans – Details | 19 Mar 2020 | View |
| Compound A3 - Marsh GibbonConstruction Access Route Signing Sh 7Plans – Details | 19 Mar 2020 | View |
| Compound A3 - Marsh Gibbon Construction Access Route Signing Drawings Sh8Plans – Details | 19 Mar 2020 | View |
| Compound A3 - Marsh Gibbon Construction Access Route Signing SH 9Plans – Details | 19 Mar 2020 | View |
| Compound A3 - Marsh GibbonConstruction Access Route Signing Sh 10Plans – Details | 19 Mar 2020 | View |
| Compound A3 - Marsh Gibbon Construction Access Route Signing Sh 11Plans – Details | 19 Mar 2020 | View |
| Compound A3 - Marsh GibbonConstruction Access Route Signing Sh 12Plans – Details | 19 Mar 2020 | View |
| Compound A3 - Marsh Gibbons Construction Access Route Signing Sh 13Plans – Details | 19 Mar 2020 | View |
| Compound A3 - Marsh Gibbon Construction Access Route Signing Sh 14Plans – Details | 19 Mar 2020 | View |
| Compound A3 - Marsh Gibbon Construction Access Route Signing Sh 15Plans – Details | 19 Mar 2020 | View |
| Compound A3 - Marsh Gibbon Construction Access Route Signing Sh 16Plans – Details | 19 Mar 2020 | View |
| Compound A3 - Marsh GibbonConstruction Access Route Signing Sh 17Plans – Details | 19 Mar 2020 | View |
| Compound A3 - Marsh Gibbon Construction Access Route Signing Sh 18Plans – Details | 19 Mar 2020 | View |
| Compound A3 - Marsh Gibbon Construction Access Route Signing Sh 19Plans – Details | 19 Mar 2020 | View |
| Compound A3 - Marsh Gibbon Construction Access Route Signing Sh 20Plans – Details | 19 Mar 2020 | View |
| Compound A3 - Marsh GibbonConstruction Access Route Signing Sh 21Plans – Details | 19 Mar 2020 | View |
| Compound A3 - Marsh Gibbon Construction Access Route Signing Sh 22Plans – Details | 19 Mar 2020 | View |
| Compound A3 - Marsh Gibbon Construction Access Route Signing Sh 23Plans – Details | 19 Mar 2020 | View |
| Compound A3 - Marsh Gibbon Construction Access Route Signing Drawings - Sh 24Plans – Details | 19 Mar 2020 | View |
| Compound A3 - Marsh Gibbon Construction Access Route Signing Drawings - Sh 25Plans – Details | 19 Mar 2020 | View |
| Compound A3 - Marsh Gibbon Construction Access Route Signing Sh 26Plans – Details | 19 Mar 2020 | View |
| Compound A3 - Marsh Gibbon Construction Access Route Signing Sh 27Plans – Details | 19 Mar 2020 | View |
| Compound A3 - Marsh Gibbon Construction Access Route Signing Sh 28Plans – Details | 19 Mar 2020 | View |
| Compound A3 - Marsh Gibbon Construction Access Route Signing Sh 29Plans – Details | 19 Mar 2020 | View |
| Compound A3 - Marsh Gibbon Construction Access Route Signing Drawings - Sh 30Plans – Details | 19 Mar 2020 | View |
| Compound A3 - Marsh Gibbon Construction Access Route Signing Sh 31Plans – Details | 19 Mar 2020 | View |
| Compound A3 - Marsh Gibbon Construction Access Route Signing Sh 32Plans – Details | 19 Mar 2020 | View |
| Compound A3 - Marsh Gibbon Construction Access Route Signing Sh 33Plans – Details | 19 Mar 2020 | View |
| Compound A3 - Marsh Gibbon Construction Access Route Signing Sh 34Plans – Details | 19 Mar 2020 | View |
| Compound A3 - Marsh Gibbon Construction Access Route Signing Sh 35Plans – Details | 19 Mar 2020 | View |
| Compound A3 - Marsh Gibbon Construction Access Route Signing Sh 36Plans – Details | 19 Mar 2020 | View |
| Compound A3 - Marsh Gibbon Construction Access Route Signing Sh 27Plans – Details | 19 Mar 2020 | View |
| Compound A3 - Marsh Gibbon Construction Access Route Signing Sh 38Plans – Details | 19 Mar 2020 | View |
| Compound A3 - Marsh Gibbon Construction Access Route Signing Sh 40Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S1Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S2Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S3Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green lane Construction Access Route Signing S4Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing Sh 5Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S 6Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing Sh 7Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing Sh 9Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green LaneConstruction Access Route Signing Sh 10Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane -Construction Access Route Signing Sh 8Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing Sh 11Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Gren Lane Construction Access Route Signing S 12Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S13Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S14Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S15Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S 16Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S17Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing Sh 18Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S 20Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green LaneConstruction Access Route Signing S 20Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S 21Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane - Construction Access Route Signing Sh 22Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S23Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S24Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S25Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S26Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S27Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing Sh 28Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S29Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S30Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S31Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S32Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S 33Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S34Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S 35Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S36Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S 37Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S38Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S39Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S40Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S141Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lanr Construction Access Route Signing S 42Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S43Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S44Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S45Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S46Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S47Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S 148Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S49Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S50Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S51Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S52Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S53Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S54Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S55Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S56Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing 57Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Gren Lane Construction Access Route Signing S58Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing SPlans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S60Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S61Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S62Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S 63Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S164Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S65Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S66Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S67Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S68Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S70Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S171Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S73Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing S74Plans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Construction Access Route Signing SchedulePlans – Details | 19 Mar 2020 | View |
| Compound A4 - Green Lane Passing Place Sign &compound layout infoPlans – Details | 19 Mar 2020 | View |
| Compound A1 - Bicester Signing SchedulePlans – Details | 19 Mar 2020 | View |
| Compound A1,A2,A3 & A4 Multiple Signing SchedulePlans – Details | 19 Mar 2020 | View |
| Compound A2 - Launton Construction Access Route Signing SchedulePlans – Details | 19 Mar 2020 | View |
| Compound A3 - Marsh Gibbon Construction Access Route Signing SchedulePlans – Details | 19 Mar 2020 | View |
| Compounds B1,B2,B3,A4 - Construction Access Route Multiple signing schedule sheet 2Plans – Details | 19 Mar 2020 | View |
| Compound A1 - Bicester Construction Access Route SigningPlans – Details | 19 Mar 2020 | View |
| Compound A1 - Bicester Construction Access Route SigningPlans – Details | 19 Mar 2020 | View |
| Compound A1 - Bicester Construction Access Route SigningPlans – Details | 19 Mar 2020 | View |
| Compound A1 - Bicester Construction Access Route SigningPlans – Details | 19 Mar 2020 | View |
| Compound A1 - Bicester Construction Access Route SigningPlans – Details | 19 Mar 2020 | View |
| Compound A1 - Bicester Construction Access Route SigningPlans – Details | 19 Mar 2020 | View |
| Compound A1 - Bicester Construction Access Route SigningPlans – Details | 19 Mar 2020 | View |
| Compound A1 - Bicester Construction Access Route SigningPlans – Details | 19 Mar 2020 | View |
| Compound A1 - Bicester Construction Access Route SigningPlans – Details | 19 Mar 2020 | View |
| Compound A1 - Bicester Construction Access Route SigningPlans – Details | 19 Mar 2020 | View |
| Compound A1 - Bicester Construction Access Route SigningPlans – Details | 19 Mar 2020 | View |
| Compound A1 - BicesterConstruction Access Route SigningPlans – Details | 19 Mar 2020 | View |
| Compound A1 - Bicester Construction Access Route SigningPlans – Details | 19 Mar 2020 | View |
| Compound A1 - Bicester Construction Access Route SigningPlans – Details | 19 Mar 2020 | View |
| Compound A1 - Bicester Construction Access Route SigningPlans – Details | 19 Mar 2020 | View |
| Compound A1 - Bicester Construction Access Route SigningPlans – Details | 19 Mar 2020 | View |
| Compound A1 - Bicester Construction Access Route SigningPlans – Details | 19 Mar 2020 | View |
| Compound A1 - Bicester Construction Access Route SigningPlans – Details | 19 Mar 2020 | View |
| Compound A1 - Bicester Construction Access Route SigningPlans – Details | 19 Mar 2020 | View |
| Compound A1 - Bicester Construction Access Route SigningPlans – Details | 19 Mar 2020 | View |
| Compound A1 - Bicester Construction Access Route SigningPlans – Details | 19 Mar 2020 | View |
| 2A1 - Charbridge Lane Allotments plans packPlans – Details | 23 Apr 2020 | View |
| 2A1 Other access plans packPlans – Details | 23 Apr 2020 | View |
| 2A2 Haul road crossing HRC2 Traffic Signal layoutPlans – Details | 23 Apr 2020 | View |
| 2A2 Access to Compound 2 Plans packPlans – Details | 23 Apr 2020 | View |
| 2A2 Haul Road Crossing Plans PackPlans – Details | 23 Apr 2020 | View |
| 2A2 Haul Road Crossing_3 Plans PackPlans – Details | 23 Apr 2020 | View |
| 2A2 Junction Improvement A2 Junction 6 Plans PackPlans – Details | 23 Apr 2020 | View |
| 2A2 Junction Improvement A2 Junction 9 Plans PackPlans – Details | 23 Apr 2020 | View |
| 2A2 OCC Passing Places Plans packPlans – Details | 23 Apr 2020 | View |
| 2A2 Other Access A2 PA 15 Plans packPlans – Details | 23 Apr 2020 | View |
| 2A2 Other Access A2 TA Plans packPlans – Details | 23 Apr 2020 | View |
| 2A2 Passing Place A2_P2 Plans PackPlans – Details | 23 Apr 2020 | View |
| 2A2 Passing Place A2 P8 Plans packPlans – Details | 23 Apr 2020 | View |
| 2A3 Haul Road Crossing HRC 3 Plans PackPlans – Details | 24 Apr 2020 | View |
| 2A3 Passing Place A3 P2 Plans packPlans – Details | 24 Apr 2020 | View |
| 2A2_Passing Place A2 P1 Plans packPlans – Details | 24 Apr 2020 | View |
| 2A3 Passing Place P3 Plans PackPlans – Details | 24 Apr 2020 | View |
| 2A3 Passing place P4 Plans PackPlans – Details | 24 Apr 2020 | View |
| 2A3 Passing Place P5 plans packPlans – Details | 24 Apr 2020 | View |
| 2A3 Passing Place P6 plans packPlans – Details | 24 Apr 2020 | View |
| 2A3 Passing place P7 plans packPlans – Details | 24 Apr 2020 | View |
| 2A3 Passing place P8 plans packPlans – Details | 24 Apr 2020 | View |
| 2A3 Passing place P9 plans packPlans – Details | 24 Apr 2020 | View |
| 2A3 Passing place P10 plans packPlans – Details | 24 Apr 2020 | View |
| 2A3 Junction Improvement J2 plans packPlans – Details | 24 Apr 2020 | View |
| 2A3 Passing Place P1 plans packPlans – Details | 24 Apr 2020 | View |
| 2A1 PRoW Gen arrangement Jarvis' Lane Level CrossingPlans – Details | 12 Jun 2020 | View |
| 2A1 PRoW Site clearance Jarvis' Lane Level CrossingPlans – Details | 12 Jun 2020 | View |
| 2A1 PRoW Gen Arrangement Javis Lane Levil Crossing utilitiesPlans – Details | 12 Jun 2020 | View |
| 2A1 PRoW Grange Farm No 1 Level CrossingPlans – Details | 12 Jun 2020 | View |
| 21A PRoW Gen Arrangement Grange Farmm level crossing utilitiesPlans – Details | 12 Jun 2020 | View |
| 21APRoW Javis' Lane Closure NoticePlans – Details | 12 Jun 2020 | View |
| 21A PRoW Grange Farm No 1 Closure NoticePlans – Details | 12 Jun 2020 | View |
| 21A PRoW Launton No 1 & No 2 Closure Notices ClosuresPlans – Details | 12 Jun 2020 | View |
| 21A PRoW Oxfordshire Standard Details v3Plans – Details | 12 Jun 2020 | View |
| 2A2 PRoW Site Clearance Launton No 1 & 2 Level CrossingPlans – Details | 12 Jun 2020 | View |
| 2A2 PRoW Gen arrangement Launton No 1 & 2 Level Crossing utilitiespPlans – Details | 12 Jun 2020 | View |
| 2A2 PR0W Jarvis' Lane Closure NoticePlans – Details | 12 Jun 2020 | View |
| 2A2 PRoW Grange Farm no 1 Closure NoticePlans – Details | 12 Jun 2020 | View |
| 2A2 PR0W Launton 1 & 2 Closure noticesPlans – Details | 12 Jun 2020 | View |
| 2A2 Standard construction detail PRoW Pedestrian kissing gates & gapsPlans – Details | 12 Jun 2020 | View |
| 2A2 Standard construction detail PRoW Bridleway GapPlans – Details | 12 Jun 2020 | View |
| 2A2 Standard construction detail 3 rail timber fencing county of OxonPlans – Details | 12 Jun 2020 | View |
| 2A2 Standard construction detail PRoW waymarkers & timber posts OCCPlans – Details | 12 Jun 2020 | View |
| 2A2 Standard construction detail PRoW footway constructionPlans – Details | 12 Jun 2020 | View |
| Standard construction detail PR0W type 1 Footpway construction OxonPlans – Details | 12 Jun 2020 | View |
| Standard construction detail PRoW closure noticePlans – Details | 12 Jun 2020 | View |
| Environmental ProtectionConsultation Response | 5 Jun 2020 | View |
| Decision NoticeDecision | 15 Jul 2020 | View |
| OCC HighwaysConsultation | 14 Jul 2020 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceConditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.