Council planning record

Proposed extension to the approved Cam Burn Wind Farm (C/2011/0459/F and LA01/2022/1209/F) comprising 3no. turbines (tip height up to 150m), crane pads, battery energy storage system (BESS) compound, green hydrogen production area, site access tracks and turning heads, underground cables, spoil storage areas, amendment to approved electrical substation, improvements to approved access onto Craigmore Road, haulage and delivery route improvements and all associated ancillary works

Lands approximately 455m northeast of No. 59 Craigmore Road (BT51 5HF) and 276m northwest of No. 51 Craigmore Road (BT51 4EX), Coleraine

ValidReference: LA01/2026/1088/FCauseway Coast and Glens Borough Council

Last published check: 9 Oct 2026, 02:00. Check the council record for more recent changes.

Application location

Lands approximately 455m northeast of No. 59 Craigmore Road (BT51 5HF) and 276m northwest of No. 51 Craigmore Road (BT51 4EX), Coleraine

This record has no verified map location.

Application summary

Status
Valid
Application type
Full
Received
25 Sept 2026
Validated
6 Oct 2026
Determination deadline
Not published
Local authority
Causeway Coast and Glens Borough Council

Application overview

Proposed extension to the approved Cam Burn Wind Farm (C/2011/0459/F and LA01/2022/1209/F) comprising 3no. turbines (tip height up to 150m), crane pads, battery energy storage system (BESS) compound, green hydrogen production area, site access tracks and turning heads, underground cables, spoil storage areas, amendment to approved electrical substation, improvements to approved access onto Craigmore Road, haulage and delivery route improvements and all associated ancillary works

Proposal details

Reference
LA01/2026/1088/F
Alternative references
PP-15248399
Ward
Aghadowey
Agent
bell | rolston

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 107 of 107

DocumentPublishedAction
Application Form - Without Personal DataApplication Form8 Oct 2026View
Acknowledge ApplicationCorrespondence with Applicant/Agent/Solicitor8 Oct 2026View
ES Non-Technical Summary (NTS) - RedactedImpact Assessments and Statements8 Oct 2026View
ES Vol 1 Chapter 1. IntroductionImpact Assessments and Statements8 Oct 2026View
ES Vol 1 Chapter 2. Site & Project DescriptionImpact Assessments and Statements8 Oct 2026View
ES Vol 1 Chapter 3. Socio-Economic AssessmentImpact Assessments and Statements8 Oct 2026View
ES Vol 1 Chapter 4. Landscape and Visual Impact AssessmentImpact Assessments and Statements8 Oct 2026View
ES Vol 1 Chapter 6. Fisheries AssessmentImpact Assessments and Statements8 Oct 2026View
ES Vol 1 Chapter 7. Avian EcologyImpact Assessments and Statements8 Oct 2026View
ES Vol 1 Chapter 8 Water, Geology and Peat LandslideImpact Assessments and Statements8 Oct 2026View
ES Vol 1 Chapter 9. Archaeology and Cultural Heritage AssessmentImpact Assessments and Statements8 Oct 2026View
ES Vol 1 Chapter 10. Transport, Access and Haulage AsessmentImpact Assessments and Statements8 Oct 2026View
ES Vol 1 Chapter 11. Noise Impact AssessmentImpact Assessments and Statements8 Oct 2026View
ES Vol 1 Chapter 12. Shadow Flicker AssessmentImpact Assessments and Statements8 Oct 2026View
ES Vol 1. Chapter 13. Tourism Impact AssessmentImpact Assessments and Statements8 Oct 2026View
ES Vol 1 Chapter 14. Telecommunications and Aviation AssessmentImpact Assessments and Statements8 Oct 2026View
ES Vol 1 Chapter 15. Grid AssessmentImpact Assessments and Statements8 Oct 2026View
ES Vol 1 Chapter. 16 Major Accidents, Disasters and Human HealthImpact Assessments and Statements8 Oct 2026View
ES Vol 1 Chapter 17. Climate Change AssessmentImpact Assessments and Statements8 Oct 2026View
ES Vol 1 Chapter 18. Assessment of Significance of Impact InteractionsImpact Assessments and Statements8 Oct 2026View
ES Vol 1 Chapter 19. Summary and ConclusionsImpact Assessments and Statements8 Oct 2026View
ES Vol 2 Appendix 3.1 Socio-Economic Analysis WorkbookImpact Assessments and Statements8 Oct 2026View
ES Vol 2 Appendix 4.1 LVIA Glossary, Publications & MethodologyImpact Assessments and Statements8 Oct 2026View
ES Vol 2 Appendix 4.2 LVIA Cumulative BaselineImpact Assessments and Statements8 Oct 2026View
ES Vol 2 Appendix 5.1 Target Notes, Quadrats and Plant Species ListImpact Assessments and Statements8 Oct 2026View
ES Vol 2 Appendix 5.2 PhotographsImpact Assessments and Statements8 Oct 2026View
ES Vol 2 Appendix 5.7 Marsh Fritillary ReportImpact Assessments and Statements8 Oct 2026View
ES Vol 2 Appendix 5.8 Lizard Survey Report -RedactedImpact Assessments and Statements8 Oct 2026View
ES Vol 1 Cover and Contents PageImpact Assessments and Statements8 Oct 2026View
ES Vol 3 LVIA Figures Cover and ContentsImpact Assessments and Statements8 Oct 2026View
ES Vol 3 Figure 1 Landscape Designations and Non-Statutory DesignationsImpact Assessments and Statements8 Oct 2026View
ES Vol 3 Figure 2 Landscape CharacterImpact Assessments and Statements8 Oct 2026View
ES Vol 3 Figure 3 Viewpoint SelectionImpact Assessments and Statements8 Oct 2026View
ES Vol 3 Figure 4 Cumulative BaselineImpact Assessments and Statements8 Oct 2026View
ES Vol 3 Figure 7 Combined Zone of Theoretical Visibility Blade Tip Height, 30km radiusImpact Assessments and Statements8 Oct 2026View
ES Vol 2 Appendix 5.9 Outline Habitat Management PlanImpact Assessments and Statements8 Oct 2026View
ES Vol 3 Figure 8 Comparative Zone of Theoretical Visibility, Consented 6 Turbine vs Proposed 7 TurbineImpact Assessments and Statements8 Oct 2026View
ES Vol 3 Figure 10 Viewpoint 4 CullycappleImpact Assessments and Statements8 Oct 2026View
ES Vol 3 Figure 11 Viewpoint 6 Craigmore RoadImpact Assessments and Statements8 Oct 2026View
ES Vol 3 Figure 12 Viewpoint 7 B66 Ringsend RoadImpact Assessments and Statements8 Oct 2026View
ES Vol 3 Figure 13 Viewpoint 12 A29 Looking SouthImpact Assessments and Statements8 Oct 2026View
ES Vol 3 Figure 14 VIewpoint 13 A29 Lay-byImpact Assessments and Statements8 Oct 2026View
ES Vol 3 Figure 15 Viewpoint 18 Cashel Road JunctionImpact Assessments and Statements8 Oct 2026View
ES Vol 3 Figure 16 Viewpoint 19 Ringsend Presbyterian ChurchImpact Assessments and Statements8 Oct 2026View
ES Vol 3 Figure 17 Viewpoint 20 Boleran RoadImpact Assessments and Statements8 Oct 2026View
ES Vol 3 Figure 18 Viewpoint 27 Lisnamuck Road at Mill Lane JunctionImpact Assessments and Statements8 Oct 2026View
ES Vol 3 Figure 19 Viewpoint 28 Drumbane RoadImpact Assessments and Statements8 Oct 2026View
ES Vol 4 Outline Construction Environmental Management PlanImpact Assessments and Statements8 Oct 2026View
ES Vol 2 Appendix 2.1 Design Evolution PlanImpact Assessments and Statements8 Oct 2026View
ES Vol 2 Appendix 8.6 Hydrological Testing ReportImpact Assessments and Statements8 Oct 2026View
ES Vol 2 Appendix 6.1 Fisheries FiguresImpact Assessments and Statements8 Oct 2026View
ES Vol 2 Appendix 7.1 - 7.20 Avian EcologyImpact Assessments and Statements8 Oct 2026View
ES Vol 2 Appendix 8.4 Groundwater Abstraction Feasibility AssessmentImpact Assessments and Statements8 Oct 2026View
ES Vol 2 Appendix 8.5 Hydrogeological Risk AssessmentImpact Assessments and Statements8 Oct 2026View
ES Vol 2 Appendix 8.7 Consultation Records - RedactedImpact Assessments and Statements8 Oct 2026View
ES Vol 2 Appendix 8.8 Hydrology FiguresImpact Assessments and Statements8 Oct 2026View
ES Vol 2 Appendix 9.1 - 9.6 Archaeology and Cultural HeritageImpact Assessments and Statements8 Oct 2026View
ES Vol 2 Appendix 10.1 Abnormal Load Delivery RouteImpact Assessments and Statements8 Oct 2026View
ES Appendix 10.2 Proposed Site AccessImpact Assessments and Statements8 Oct 2026View
ES Vol 2 Appendix 10.3 Collision DataImpact Assessments and Statements8 Oct 2026View
ES Vol 2 Appendix 11.1 - 11.10 NoiseImpact Assessments and Statements8 Oct 2026View
ES Vol 2 Appendix 12.1 Shadow CalculationsImpact Assessments and Statements8 Oct 2026View
ES Vol 2 Appendix 12.2 Worst Case Shadow MapImpact Assessments and Statements8 Oct 2026View
ES Vol 2 Appendix 12.3 Real Case Shadow MapImpact Assessments and Statements8 Oct 2026View
ES Vol 2 Appendix 14.1 Telecommunications & Aviation consultation - RedactedImpact Assessments and Statements8 Oct 2026View
ES Vol 2 Appendix 15.1 Grid Connection PlanImpact Assessments and Statements8 Oct 2026View
ES Vol 2 Appendix 15.2 Grid Connection Constraint PlanImpact Assessments and Statements8 Oct 2026View
ES Vol 2 Appendix 16.1 NIE Infrastructure MapImpact Assessments and Statements8 Oct 2026View
Appendix 17.1 Greenhouse Gas AssessmentImpact Assessments and Statements8 Oct 2026View
ES Appendix 17.2 Inter-Related Effects of Climate ChangeImpact Assessments and Statements8 Oct 2026View
ES Vol 4 Appendix 4.0 P2.101 Site Layout and Infrastructure - VectorImpact Assessments and Statements8 Oct 2026View
ES Vol 4 Appendix 4.2 Outline Habitat Management PlanImpact Assessments and Statements8 Oct 2026View
ES Vol 4 Appendix 4.3 Outline Ornithological Mitigation and Management PlanImpact Assessments and Statements8 Oct 2026View
ES Vol 4 Appendix 4.4 Outline Traffic Management PlanImpact Assessments and Statements8 Oct 2026View
ES Vol 2 Appendix 4.5 Outline Archaeological Monitoring PlanImpact Assessments and Statements8 Oct 2026View
Es Vol 2 Appendix 5.3 Static Bat Detector Report & ObmmpImpact Assessments and Statements8 Oct 2026View
Es Vol 2 Appendix 5.4 Glta And Endoscoping ReportImpact Assessments and Statements8 Oct 2026View
Es Vol 2 Appendix 5.10 Ecology Figures (without Confidential Figure 5.5)Impact Assessments and Statements8 Oct 2026View
Es Vol 2 Appendix 8.1 Surface Water Management PlanImpact Assessments and Statements8 Oct 2026View
Es Vol 2 Appendix 8.2 Flood Risk & Drainage AssessmentImpact Assessments and Statements8 Oct 2026View
Es Vol 2 Appendix 8.3 Peat Landslide Hazard Risk AssessmentImpact Assessments and Statements8 Oct 2026View
Es Vol 3 Figure 5 Zone Of Theoretical Visibility Hub, Blade Tip And Reverse Blade Tip, 15km RadiusImpact Assessments and Statements8 Oct 2026View
Es Vol 3 Figure 6 Zone Of Theoretical Visibility Hub, Blade Tip And Reverse Blade Tip, 30km RadiusImpact Assessments and Statements8 Oct 2026View
Es Vol 3 Figure 7 Combined Zone Of Theoretical Visibility Blade Tip Height, 30km Radius(1)Impact Assessments and Statements8 Oct 2026View
Es Vol 3 Figure 9 Cumulative Zone Of Theoretical VisibilityImpact Assessments and Statements8 Oct 2026View
Es Vol 4 Appendix 4.0 P1.200site Context PlanImpact Assessments and Statements8 Oct 2026View
Es Vol 4 Appendix 4.1 Surface Water Management PlanImpact Assessments and Statements8 Oct 2026View
Site Context Plan (Too large for plans tab)Other Supporting Information8 Oct 2026View
Planning, Design and Access StatementOther Supporting Information8 Oct 2026View
Cover LetterOther Supporting Information8 Oct 2026View
Pre-Application Community Consultation (PACC) ReportOther Supporting Information8 Oct 2026View
Typical Road Section and Typical Cut Fill Scenario A3Road Details8 Oct 2026View
Site Entrance Detail A3Road Details8 Oct 2026View
Site Layout and Infrastructure Raster A3Site Layout or Block Plan8 Oct 2026View
Site Layout and Infrastructure Vector A3Site Layout or Block Plan8 Oct 2026View
Site Layout and Infrastructure Ortho A3Site Layout or Block Plan8 Oct 2026View
Temporary Construction Compound A3Site Layout or Block Plan8 Oct 2026View
Site Location Plan A1Site Location Plan8 Oct 2026View
Gas Pipeline Crossing Detail A3Detailed Drawing Plans8 Oct 2026View
Typical Turbine Base Details - Section View and Plan View A3Proposed Plans8 Oct 2026View
Typical Crane Pad and Storage Area A3Proposed Plans8 Oct 2026View
Substation Front and Rear Elevations A3Proposed Elevations8 Oct 2026View
Substation Side Elevation and Cross Section A3Proposed Elevations8 Oct 2026View
Hydrogen Elevations A1Proposed Elevations8 Oct 2026View
BESS Elevations A3Proposed Elevations8 Oct 2026View
Turbine Elevations A3Proposed Elevations8 Oct 2026View
Substation Floorplan A3Proposed Floor Plans8 Oct 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received date

    Published milestoneCouncil source
  2. Validated date

    Published milestoneCouncil source
  3. Date last advertised

    Scheduled

    Future date published by the council.

    Council source

Decision & conditions

Valid
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.