Council planning record

Proposed refurbishment alterations and extensions to dwelling consisting of the conversion of the existing roof space to provide access, an additional bathroom, and an additional bedroom and including an additional dormer window to the front and rear elevations, plus a two storey side extension to relocate the kitchen, and provide an additional bedroom at ground floor level and an additional family room and external terrace at first floor level, plus a change of external finishes.

58 Strand Road, East Crossreagh, Portstewart

Site Inspection CompleteReference: LA01/2026/0745/FCauseway Coast and Glens Borough Council

Last published check: 3 Oct 2026, 03:07. Check the council record for more recent changes.

Application location

58 Strand Road, East Crossreagh, Portstewart

This record has no verified map location.

Application summary

Status
Site Inspection Complete
Application type
Full
Received
9 Jul 2026
Validated
10 Jul 2026
Determination deadline
Not published
Local authority
Causeway Coast and Glens Borough Council

Application overview

Proposed refurbishment alterations and extensions to dwelling consisting of the conversion of the existing roof space to provide access, an additional bathroom, and an additional bedroom and including an additional dormer window to the front and rear elevations, plus a two storey side extension to relocate the kitchen, and provide an additional bedroom at ground floor level and an additional family room and external terrace at first floor level, plus a change of external finishes.

Proposal details

Reference
LA01/2026/0745/F
Alternative references
PP-15073212
Ward
Portstewart
Agent
Dimensions

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 12 of 12

DocumentPublishedAction
Application Form - Without Personal DataApplication Form10 Jul 2026View
Acknowledge ApplicationCorrespondence with Applicant/Agent/Solicitor10 Jul 2026View
NeighbourNeighbour Notifications27 Jul 2026View
Contextual Elevation & Floor PlansSite & Detailed Drawings22 Sept 2026View
Existing & Proposed Block Plans A3Site Layout or Block Plan10 Jul 2026View
Location Map A3Site Location Plan10 Jul 2026View
Existing & Proposed Floor Plan OverlayExisting and Proposed Floor Plans24 Aug 2026View
Existing & Proposed Floor Plan Overlay 06AExisting and Proposed Floor Plans24 Aug 2026View
Proposed First Floor Plans, Elevations & Sections A3Proposed Elevations10 Jul 2026View
Proposed Ground Floor Plans, Elevations & Sections A3Proposed Elevations and Floor Plans10 Jul 2026View
Existing Floor Plans & Elevations 03AExisting Elevations and Floor Plans24 Aug 2026View
Existing Floor Plans & Elevations A3Existing Elevations and Floor Plans10 Jul 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received date

    Published milestoneCouncil source
  2. Validated date

    Published milestoneCouncil source
  3. Date last advertised

    Published milestoneCouncil source

Decision & conditions

Site Inspection Complete
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.