Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Cantonian High School Fairwater Road Fairwater Cardiff CF5 3JR
Last published check: 27 Sept 2026, 15:58. Check the council record for more recent changes.
Cantonian High School Fairwater Road Fairwater Cardiff CF5 3JR
This record has no verified map location.
View council mapDischarge of Condition 9 (Verification Report) of 23/01501/FUL
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| APPENDIX D- FC - CUT & FILL VOLUME CALCULATIONS P4 - SITE STRIP -200 TO FORMATIODrawing · PDF | 26 Aug 2026 | View |
| APPENDIX D- PROPOSED FOUL DRAINAGE SHEET 1Drawing · PDF | 26 Aug 2026 | View |
| APPENDIX E - ASBESTOS INTERPRATIVE REPORT AND REMEDIATION STRATEGYSupporting Documents · PDF | 26 Aug 2026 | View |
| APPLICATIONFORMREDACTEDApplication Form · PDF | 24 Aug 2026 | View |
| FC - GROUND REMEDIATION VERIFICATION REPORT 180826Supporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX A - ASBESTOS CELL VOLUME CALCULATION 08.02.24Drawing · PDF | 24 Aug 2026 | View |
| APPENDIX A - FC - AS RECORD ASBESTOS CELL LEVELSDrawing · PDF | 24 Aug 2026 | View |
| APPENDIX A - FAIRWATER CAMPUS - ASBESTOS CELL AS-BUILT LOCATION 08.02.24Drawing · PDF | 24 Aug 2026 | View |
| APPENDIX A - FC - AS RECORDASBESTOS CELL SECTIONDrawing · PDF | 24 Aug 2026 | View |
| APPENDIX B - CUT & FILL WORKINGSSupporting Documents | 24 Aug 2026 | View |
| APPENDIX B - IMPORTED MATERIALS TESTINGSupporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX B - (SEER IMPORTS) 10MM PIPE BEDDING - GEOTECHNICAL REPORT (03-2025)Supporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX B - (SEER IMPORTS) RMR BIO RETENTION, FILTER MEDIA 50 40 10 RESIDENTIALSupporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX B - AREAS CUT AND FILL RESULTSSupporting Documents | 24 Aug 2026 | View |
| APPENDIX B - WH1143 - FAIRWATER REMEASURE - SPLIT AREAS CUT AND FILL RESULTS - CSupporting Documents | 24 Aug 2026 | View |
| APPENDIX B - PHASE 03 CUT & FILLSupporting Documents | 24 Aug 2026 | View |
| APPENDIX B (CHURNGOLD IMPORTS) - 2020-04-01 6F5 CONSTITUENT RESULTSDrawing · PDF | 24 Aug 2026 | View |
| APPENDIX B (CHURNGOLD IMPORTS) - 2020-04-28 TYPE 1 CONSTITUENT RESULTSDrawing · PDF | 24 Aug 2026 | View |
| APPENDIC C - FC PLANNING CONDITION 9Supporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX D - AREAS CUT AND FILL RESULTSSupporting Documents | 24 Aug 2026 | View |
| APPENDIX B (AFAN IMPORTS) - AUGUST 2025, FAIRWATER TOPSOIL[1]Supporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX B (AFAN IMPORTS) - NOVEMBER 2025 FAIRWATER TOPSOIL [1]Supporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX B (AFAN IMPORTS) - TREE CELL SOILS [1]Supporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX B (AFAN IMPORTS) - OCTOBER 2025 FAIRWATER TOPSOIL [1]Supporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX B (AFAN IMPORTS) - TREE CELL MATERIAL[1]Supporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX B (AFAN IMPORTS) - TREECELL SOILS [2]Supporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX B (AFAN IMPORTS) - SEPTEMBER 2025 FAIRWATER TOP SOIL [1]Supporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX B (CHURNGOLD IMPORTS) - 19-12-04 TYPE 1 - FROST HEAVESupporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX B (CHURNGOLD IMPORTS) - 19-12-02 6F5 SULFATE RESULTSSupporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX D - CUT & FILL WORKINGSSupporting Documents | 24 Aug 2026 | View |
| APPENDIX D - FC - DEMOLITION 6F5 STOCK PILE VOLUMES 15.08.23Supporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX D - FC - EXISTING SURFACE MATERIALS IN THE CUT AND FILL ZONESDrawing · PDF | 24 Aug 2026 | View |
| APPENDIX D - PHASE 3 SURFACE WATER DRAINAGEDrawing · PDF | 24 Aug 2026 | View |
| APPENDIX D - PROPOSED FOUL DRAINAGE SHEET 2Drawing · PDF | 24 Aug 2026 | View |
| APPENDIX D - PROPOSED SURFACE WATER DRAINAGE SHEET 2Drawing · PDF | 24 Aug 2026 | View |
| APPENDIX D - FAIRWATER CAMPUS - PHASE 3 PHASING PLAN REV B 041225Supporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX D - PROPOSED SURFACE WATER DRAINAGE SHEET 1Drawing · PDF | 24 Aug 2026 | View |
| APPENDIX D - GENERAL ARRANGEMENTDrawing · PDF | 24 Aug 2026 | View |
| APPENDIX D - CONSTRUCTION FINISHES SHEET 2Drawing · PDF | 24 Aug 2026 | View |
| APPENDIX D - EXTERNAL DUCT LAYOUT SHEET 2 OF 4Drawing · PDF | 24 Aug 2026 | View |
| APPENDIX D - PHASE 3 FOUL DRAINAGEDrawing · PDF | 24 Aug 2026 | View |
| APPENDIX D - EXTERNAL DUCT LAYOUT SHEET 1 OF 4Drawing · PDF | 24 Aug 2026 | View |
| APPENDIX D - EXTERNAL DUCT LAYOUT SHEET 3 OF 4Drawing · PDF | 24 Aug 2026 | View |
| APPENDIX D - ISOPACHYTEDrawing · PDF | 24 Aug 2026 | View |
| APPENDIX D -EXTERNAL DUCT LAYOUT SHEET 4 OF 4Drawing · PDF | 24 Aug 2026 | View |
| APPENDIX D - CONSTRUCTION FINISHES SHEET 2Drawing · PDF | 24 Aug 2026 | View |
| APPENDIX D - PHASE 03 CUT & FILLSupporting Documents | 24 Aug 2026 | View |
| APPENDIX D - PHASE 02B MUCK PILESSupporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX D - TARMAC STONE DEPTHS PHASE 3Drawing · PDF | 24 Aug 2026 | View |
| APPENDIX D - WH1143 - FAIRWATER REMEASURE - SPLIT AREAS CUT AND FILL RESULTS - CSupporting Documents | 24 Aug 2026 | View |
| APPENDIX D - GRUBBING UP DRAINAGEDrawing · PDF | 24 Aug 2026 | View |
| APPENDIX D - PHASE 02B & 03 CONSTRUCTION BUILDUPSSupporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX D - MATERIAL MANAGEMENT-OVERALL LANDSCAPE GA-C08 (1)Drawing · PDF | 24 Aug 2026 | View |
| APPENDIX F - OVERALL LANDSCAPE GADrawing · PDF | 24 Aug 2026 | View |
| APPENDIX A - ENVIROSAVERS CONFIRMATION LETTERSupporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX A - AIR TESTING 03.02.24Supporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX A - T2050.1.1 - STEVE KEDWARD - 30.05.23Supporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX A - T2050.1.2 - ELLIOTT BURLEY - 30.05.23Supporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX A - T2050.2 - CANTONIAN HIGH SCHOOL - 30.05.23Supporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX A - T2050.3 - CANTONIAN HIGH SCHOOL - 30.05.23Supporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX A - T2288.1 - CANTONIAN HIGH SCHOOL, CARDIFF - PERSONAL AND NEAR-SOURCESupporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX A - METHOD STATEMENT CANTONIAN HIGH SCHOOL GROUND WORKS 3RD FEB 24 COMPSupporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX B - (SEER IMPORTS) 6F5 CAPPING - CHEMICAL REPORT (02-2025)Drawing · PDF | 24 Aug 2026 | View |
| APPENDIX B - (SEER IMPORTS) 10MM PIPE BEDDING - CHEMICAL REPORT (02-2025)Supporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX B - (SEER IMPORTS) 6F5 CAPPING - GEOTECHNICAL REPORT (03-2025)Supporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX B - (SEER IMPORTS) 20MM PIPE BEDDING - CHEMICAL REPORT (01-2025)Supporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX B - (SEER IMPORTS) 40MM PIPE BEDDING - GEOTECHNICAL REPORT (03-2025)Supporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX B - (SEER IMPORTS) 20MM PIPE BEDDING - GEOTECHNOLOGY REPORT (03-2025)Supporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX B - (SEER IMPORTS) MOT TYPE 1 SUBBASE - CHEMICAL REPORT - (02-2025)Supporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX B - (SEER IMPORTS) MOT TYPE 1 SUBBASE ECOBLEND - CHEMICAL REPORT (02-20Supporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX B - (SEER IMPORTS) 4459_THE_CONSTRUCTION_HUB_RMR_SAND_AND_AGG_ANALYTICASupporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX B - (SEER IMPORTS) MOT TYPE 1 SUBBASE ECOBLEND - GEOTECHNICAL REPORT (0Drawing · PDF | 24 Aug 2026 | View |
| APPENDIX B - (SEER IMPORTS) MOT TYPE 1 SUBBASE - GEOTECHNICAL REPORT - (03-2025)Drawing · PDF | 24 Aug 2026 | View |
| APPENDIX B (CHURNGOLD IMPORTS) - 6F5 - MOISTURE CONTENT 2020-06-22Supporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX B (CHURNGOLD IMPORTS) - 6F5 BULK DENSITY & VOIDS 19-12-02Supporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX B (CHURNGOLD IMPORTS) - 6F5 DRY DENSITY - OWC 19-12-02Supporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX B (CHURNGOLD IMPORTS) - 6F5 RESISTANCE TO FRAGMENTATION (LA) 2020-06-22Supporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX B (CHURNGOLD IMPORTS) - 19-12-04 TYPE 1 SULFATE RESULTSSupporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX B (CHURNGOLD IMPORTS) - 19-12-11 STONE DUST SULFATE RESULTSSupporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX B (CHURNGOLD IMPORTS) - 2020-04-01 6F5 SULFATE RESULTSSupporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX B (CHURNGOLD IMPORTS) - 2020-04-08 STONE DUST SULFATE RESULTSSupporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX B (CHURNGOLD IMPORTS) - 2020-04-28 TYPE 1 SULFATE RESULTSSupporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX B (CHURNGOLD IMPORTS) - 2020-06-09 STONE DUST CHEMICALSupporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX B (CHURNGOLD IMPORTS) - 2020-06-09 6F5 CHEMICALSupporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX B (CHURNGOLD IMPORTS) - 2020-06-17 TYPE 1 GRADINGSupporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX B (CHURNGOLD IMPORTS) - 2020-06-17 TYPE 1 MOISTURE CONTENTSupporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX B (CHURNGOLD IMPORTS) - 2020-06-09 TYPE 1 CHEMICALSupporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX B (CHURNGOLD IMPORTS) - 2020-06-26 STONE DUST GRADINGSupporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX B (CHURNGOLD IMPORTS) - TYPE 1 - PLASTIC LIMIT 2020-06-17Supporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX B (CHURNGOLD IMPORTS) - 2020-06-22 6F5 GRADINGSupporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX B (CHURNGOLD IMPORTS) - TAFFS WELL QY 6N PHYSICAL MECHANICAL PROPERTIESSupporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX B (CHURNGOLD IMPORTS) - TYPE 1 BULK DENSITY & VOIDS 19-12-04Supporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX B (CHURNGOLD IMPORTS) - TYPE 1 LA TEST - 2020-06-17Supporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX B (CHURNGOLD IMPORTS) - TYPE 1 DRY DENSITY - OWC 19-12-04Supporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX B (CHURNGOLD IMPORTS) - TYPE 1 MAGNESIUM SULFATE TEST 18-12-07Supporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX D - WELSH WATER GROUNDWATER APPROVALSupporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX E -REMEDIATION STRATEGY AND REMEDIATION IMPLEMENTATION AND VERIFICATIONSupporting Documents · PDF | 24 Aug 2026 | View |
| APPENDIX G - IMAGE (5)Photos | 24 Aug 2026 | View |
| APPENDIX G - IMAGE (3)Photos | 24 Aug 2026 | View |
| APPENDIX G - IMAGE (2)Photos | 24 Aug 2026 | View |
| APPENDIX G - IMAGE (1)Photos | 24 Aug 2026 | View |
| APPENDIX G - IMAGE (4)Photos | 24 Aug 2026 | View |
| APPENDIX G - IMAGE (6)Photos | 24 Aug 2026 | View |
| APPENDIX G - IMAGE (7)Photos | 24 Aug 2026 | View |
| APPENDIX G - IMAGE (8)Photos | 24 Aug 2026 | View |
| APPENDIX I - WATCHING BRIEF ABSESTOS (2)Photos | 24 Aug 2026 | View |
| APPENDIX I - WATCHING BRIEF ABSESTOS (3)Photos | 24 Aug 2026 | View |
| APPENDIX I - WATCHING BRIEF ABSESTOS (5)Photos | 24 Aug 2026 | View |
| APPENDIX I - WATCHING BRIEF ABSESTOS (1)Photos | 24 Aug 2026 | View |
| APPENDIX I - WATCHING BRIEF ABSESTOS (4)Drawing | 24 Aug 2026 | View |
| APPENDIX I - WATCHING BRIEF ABSESTOS (6)Drawing · PDF | 24 Aug 2026 | View |
| APPENDIX I - WATCHING BRIEF ABSESTOS (7)Photos · PDF | 24 Aug 2026 | View |
| APPENDIX I - WATCHING BRIEF ABSESTOS (9)Drawing · PDF | 24 Aug 2026 | View |
| APPENDIX I - WATCHING BRIEF ABSESTOS (10)Photos | 24 Aug 2026 | View |
| APPENDIX I - WATCHING BRIEF ABSESTOS (8)Photos · PDF | 24 Aug 2026 | View |
| APPENDIX I - WATCHING BRIEF ABSESTOS (11)Photos | 24 Aug 2026 | View |
| FAIRWATER CAMPUS - ASBESTOS AREAS REV CDrawing · PDF | 24 Aug 2026 | View |
| APPENDIX I - WATCHING BRIEF ABSESTOS (12)Photos · PDF | 24 Aug 2026 | View |
| APPENDIX J - FAIRWATER CAMPUS - ASBESTOS AREAS REV CDrawing · PDF | 24 Aug 2026 | View |
| APPENDIX J - D25120 FAIRWATER LAB TEST REPORTDrawing · PDF | 24 Aug 2026 | View |
| SITE LOCATION PLANSite Location Plan · PDF | 24 Aug 2026 | View |
| COVER LETTERCorrespondence · PDF | 24 Aug 2026 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceWe haven’t collected any decision conditions for this application.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.