Council planning record

Discharge of Conditions 3 (Demolition and Construction Method Statement), 4 (Nature and Extent of Contamination), 5 (Detailed Remediation Scheme and Verification Plan) and 6 (Number, Design and Location of Integral Nest Boxes) of 21/02863/MJR

30-36 Fishguard Road Llanishen Cardiff CF14 5PQ

DecidedReference: 26/00411/DOCCardiff Council

Last published check: 28 Sept 2026, 14:14. Check the council record for more recent changes.

Application location

30-36 Fishguard Road Llanishen Cardiff CF14 5PQ

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Discharge of Condition(s)
Received
27 Feb 2026
Validated
3 Mar 2026
Determination deadline
Not published
Local authority
Cardiff Council

Application overview

Discharge of Conditions 3 (Demolition and Construction Method Statement), 4 (Nature and Extent of Contamination), 5 (Detailed Remediation Scheme and Verification Plan) and 6 (Number, Design and Location of Integral Nest Boxes) of 21/02863/MJR

Proposal details

Reference
26/00411/DOC
Alternative references
PP-14742060
Ward
LLANISHEN
Agent
DLP Architecture Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 23 of 23

DocumentPublishedAction
OFFICER'S RECOMMENDATIONReport · PDF27 Aug 2026View
DISCHARGE OF CONDITION FDCDecision · PDF27 Aug 2026View
REVISED DEMOLITION METHOD STATEMENTAmended Information · PDF20 Jul 2026View
REVISED DEMOLITION METHOD STATEMENTAmended Information · PDF20 Jul 2026View
DEMOLITION AND CONSTRUCTION METHOD STATEMENTAmended Information · PDF20 Jul 2026View
ELEVATIONS 2 OF 3 AS PROPOSEDAmended Information · PDF15 May 2026View
DEMOLITION & CONSTRUCTION METHOD STATEMENTAmended Information · PDF15 May 2026View
ELEVATIONS 2 OF 3 AS PROPOSEDAmended Plans · PDF15 May 2026View
RDJ_GROUP_METHOD_STATEMENT REV 02Amended Information · PDF15 May 2026View
ELEVATIONS 2 OF 3 AS PROPOSEDSuperseded · PDF29 Apr 2026View
DEMOLITION AND CONSTRUCTION METHOD STATEMENT REV 01Amended Information · PDF24 Apr 2026View
GEOENVIROMENTAL REPORT - DECEMBER 2025_PART7Supporting Documents · PDF3 Mar 2026View
GEOENVIROMENTAL REPORT - DECEMBER 2025_PART6Supporting Documents · PDF3 Mar 2026View
GEOENVIROMENTAL REPORT - DECEMBER 2025_PART5Supporting Documents · PDF3 Mar 2026View
GEOENVIROMENTAL REPORT - DECEMBER 2025_PART4Supporting Documents · PDF3 Mar 2026View
GEOENVIROMENTAL REPORT - DECEMBER 2025_PART3Supporting Documents · PDF3 Mar 2026View
GEOENVIROMENTAL REPORT - DECEMBER 2025_PART2Supporting Documents · PDF3 Mar 2026View
GEOENVIROMENTAL REPORT - DECEMBER 2025_PART1Supporting Documents · PDF3 Mar 2026View
ELEVATIONS 1 OF 3 AS PROPOSEDDrawing · PDF2 Mar 2026View
ELEVATIONS 3 OF 3 AS PROPOSEDDrawing · PDF2 Mar 2026View
APPLICATIONFORMREDACTEDApplication Form · PDF27 Feb 2026View
SITE LOCATION PLANSite Location Plan · PDF27 Feb 2026View
INTEGRATED ECO BAT BOX NESTBOXDrawing · PDF27 Feb 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Issued Date

    Published milestoneCouncil source
  6. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Full Discharge of Condition
DISCHARGE OF CONDITION FDC
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.