ApprovedCouncil status: Decision made 06 Jul 2026 Full - Approval with Conditions. Delegated.

Erection of a non-permanent, ancillary, modular workshop and storage building (B2/B8 use), anchored to an existing concrete base.

MURPHY GROUP, Murphy Group Building, Hawks Green Lane, Hawks Green, CANNOCK, WS11 7LH

Cannock Chase District CouncilReference CH/26/156Full Planning Application

Last published check: 3 Oct 2026, 19:43. Check the council record for more recent changes.

Status and dates

Last published check: 3 Oct 2026, 19:43 (UK)

  1. DoneReceived18 May 2026
  2. DoneValidated1 Jun 2026
  3. ClosedConsultationEnded 23 Jun 2026
  4. Date set by councilTarget decision date24 Jul 2026
  5. DecidedFull - Approval with Conditions6 Jul 2026

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (9)
  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Press notice start date

    Published milestoneCouncil source
  6. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Dispatch date

    Published milestoneCouncil source
  8. Decision date

    Published milestoneCouncil source
  9. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Full Planning Application
Ward
Hawks Green with Rumer Hill
Documents
9 published

Proposal

Erection of a non-permanent, ancillary, modular workshop and storage building (B2/B8 use), anchored to an existing concrete base.

Reference
CH/26/156
Alternative references
PP-14884117
Ward
Hawks Green with Rumer Hill
Agent
Leon Armstrong
UPRN
100032222986

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • Planning StatementPSUPPSTA18 May 2026View
  • Utility SurveyPPLAN18 May 2026View
  • Application Form - Without Personal DataPAPPFRM18 May 2026View
  • Approved 6.7.26 - Location PlanPAPPDWG28 May 2026View
  • Approved 6.7.26 - Proposed PlansPAPPDWG28 May 2026View
  • Environmental Health CommentsPCONSULT3 Jun 2026View
  • SCC Highways commentsPCONSULT19 Jun 2026View
  • Officer ReportPOFFREP6 Jul 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Full - Approval with Conditions
Decision Notice
Planning conditions
  1. The development to which this permission relates must be begun not later than the expiration of three years beginning with the date on which this permission is granted. Reason To comply with the requirements of Section 91 of the Town & Country Planning Act 1990.
  2. No materials shall be used for the external surfaces of the development other than those specified on the application. Reason In the interests of visual amenity and to ensure compliance with Local Plan Policies SO1.1, SO1.2, SO2.2 & SO8.3 (where applicable) and the NPPF.
  3. The development hereby permitted shall be carried out in accordance with the following approved plans: • Proposed Floorplans, Elevations and Site Plan – 26024-SDA-ZZ-ZZ-DR-A-0201 REV P3 • Existing Location Plan - 26024-SDA-ZZ-ZZ-DR-A-0001 REV P2 Reason For the avoidance of doubt and in the interests of proper planning.
  4. The building hereby permitted shall be retained for a temporary period only and shall be removed from the site, with the land restored to its former condition, no later than five years from the date of this permission. Reason The development has been assessed based on its temporary nature and to enable the Local Planning Authority to reassess the impact of the development after a defined period, if necessary, to ensure compliance with the Local Plan Policies SO1.1, SO1.2, SO2.2, SO7.4 & SO7.5 (where applicable) and the NPPF.
  5. In accordance with paragraph 38 of the National Planning Policy Framework the Local Planning Authority has worked with the applicant in a positive and proactive manner to approve the proposed development, which accords with the Local Plan and the National Planning Policy Framework.
  6. Mining Remediation Authority The proposed development lies within an area that has been defined by the Mining Remediation Authority as containing coal mining features at surface or shallow depth. These features may include mine entries (shafts and adits); shallow coal workings; geological features (fissures and break lines); mine gas and former surface mining sites. Although such features are seldom readily visible, they can often be present and problems can occur, particularly as a result of new development taking place. Any form of development over or within the influencing distance of a mine entry can be dangerous and raises significant land stability and public safety risks. As a general precautionary principle, the Mining Remediation Authority considers that the building over or within the influencing distance of a mine entry should be avoided. In exceptional circumstance where this is unavoidable, expert advice must be sought to ensure a suitable engineering design which takes account of all relevant safety and environmental risk factors, including mine gas and mine-water. Your attention is drawn to the Mining Remediation Authority Policy in relation to new development and mine entries available at: https://www.gov.uk/government/publications/building-on-or-within-the-influencing-distance-of-mine-entries Any intrusive activities which disturb or enter any coal seams, coal mine workings or coal mine entries (shafts and adits) requires a Mining Remediation Authority Permit. Such activities could include site investigation boreholes, excavations for foundations, piling activities, other ground works and any subsequent treatment of coal mine workings and coal mine entries for ground stability purposes. Application forms for Mining Remediation Authority permission and further guidance can be obtained from The Mining Remediation Authority’s website at: www.gov.uk/get-a-permit-to-deal-with-a-coal-mine-on- your-property https://www.gov.uk/government/publications/permit-process/permit-process In areas where shallow coal seams are present caution should be taken when carrying out any on site burning or heat focused activities. If any future development has the potential to encounter coal seams which require excavating, for example excavation of building foundations, service trenches, development platforms, earthworks, non- coal mineral operations, an Incidental Coal Agreement will be required. Further information regarding Incidental Coal Agreements can be found here - https://www.gov.uk/government/publications/incidental-coal-agreement/guidance-notes-for-applicants-for-incidental-coal-agreements If any coal mining features are unexpectedly encountered during development, this should be reported immediately to the Mining Remediation Authority on 0800 288 4242. Further information is available on the Mining Remediation Authority website at: https://www.gov.uk/government/organisations/mining-remediation-authority
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.