Council planning record

Proposed two storey side extension, single storey rear extension, installation of solar panels and air source heat pump and battery

81, Chapel Street, Norton Canes, Cannock, WS11 9NX

Decision made 20 Mar 2026 Full - Approval with Conditions. Delegated.Reference: CH/26/048Cannock Chase District Council

Last published check: 1 Oct 2026, 20:15. Check the council record for more recent changes.

Application location

81, Chapel Street, Norton Canes, Cannock, WS11 9NX

This record has no verified map location.

Application summary

Status
Decision made 20 Mar 2026 Full - Approval with Conditions. Delegated.
Application type
Full Planning Application
Received
28 Jan 2026
Validated
12 Feb 2026
Determination deadline
9 Apr 2026
Local authority
Cannock Chase District Council

Application overview

Proposed two storey side extension, single storey rear extension, installation of solar panels and air source heat pump and battery

Proposal details

Reference
CH/26/048
Alternative references
PP-14657643
Ward
Norton Canes
Parish
Norton Canes CP
Agent
Cora Younger
UPRN
100031619480

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 13 of 13

DocumentPublishedAction
Approved 20.3.26 - Location PlanPAPPDWG28 Jan 2026View
Approved 20.3.26 - Proposed Site PlanPAPPDWG28 Jan 2026View
Existing Floor Plans and Roof PlanPPLAN28 Jan 2026View
Approved 20.3.26 - Block PlanPAPPDWG28 Jan 2026View
Existing ElevationsPPLAN29 Jan 2026View
Approved 20.3.26 - Proposed Floor PlansPAPPDWG12 Feb 2026View
Approved 20.3.26 - Proposed ElevationsPAPPDWG12 Feb 2026View
Approved 20.3.26 - Existing and Proposed Roof PlansPAPPDWG12 Feb 2026View
Application Form - Without Personal DataPAPPFRM12 Feb 2026View
Planning StatementPSUPPSTA12 Feb 2026View
Environmental Health CommentsPCONSULT16 Feb 2026View
Officer ReportPOFFREP20 Mar 2026View
Decision NoticePDECNOT20 Mar 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Press notice start date

    Published milestoneCouncil source
  4. Registration date

    Published milestoneCouncil source
  5. Valid date

    Published milestoneCouncil source
  6. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Dispatch date

    Published milestoneCouncil source
  8. Decision date

    Published milestoneCouncil source
  9. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Full - Approval with Conditions
Decision Notice
Planning conditions
  1. In accordance with paragraph 38 of the National Planning Policy Framework the Local Planning Authority has worked with the applicant in a positive and proactive manner to approve the proposed development, which accords with the Local Plan and the National Planning Policy Framework.
  2. The development to which this permission relates must be begun not later than the expiration of three years beginning with the date on which this permission is granted. Reason To comply with the requirements of Section 91 of the Town & Country Planning Act 1990.
  3. No materials shall be used for the external surfaces of the development other than those specified on the application. Reason In the interests of visual amenity and to ensure compliance with Local Plan Policies CP3, CP15, CP16, RTC3 (where applicable) and the NPPF.
  4. The development hereby permitted shall be carried out in accordance with the following approved plans: • Proposed site plans - SC / 25 / 577 – 200 • Proposed floor and roof plan - SC / 25 / 577 – 201 • Block Plan - SC / 25 / 577 – 001 • Proposed elevations - SC / 25 / 577 – 202 Rev A • Existing and proposed roof plans - SC / 25 / 577 – 21 Rev A Reason For the avoidance of doubt and in the interests of proper planning.
  5. Mining Remediation Authority The proposed development lies within an area that has been defined by the Mining Remediation Authority as containing coal mining features at surface or shallow depth. These features may include mine entries (shafts and adits); shallow coal workings; geological features (fissures and break lines); mine gas and former surface mining sites. Although such features are seldom readily visible, they can often be present and problems can occur, particularly as a result of new development taking place. Any form of development over or within the influencing distance of a mine entry can be dangerous and raises significant land stability and public safety risks. As a general precautionary principle, the Mining Remediation Authority considers that the building over or within the influencing distance of a mine entry should be avoided. In exceptional circumstance where this is unavoidable, expert advice must be sought to ensure a suitable engineering design which takes account of all relevant safety and environmental risk factors, including mine gas and mine-water. Your attention is drawn to the Mining Remediation Authority Policy in relation to new development and mine entries available at: https://www.gov.uk/government/publications/building-on-or-within-the-influencing-distance-of-mine-entries Any intrusive activities which disturb or enter any coal seams, coal mine workings or coal mine entries (shafts and adits) requires a Mining Remediation Authority Permit. Such activities could include site investigation boreholes, excavations for foundations, piling activities, other ground works and any subsequent treatment of coal mine workings and coal mine entries for ground stability purposes. Application forms for Mining Remediation Authority permission and further guidance can be obtained from The Mining Remediation Authority’s website at: www.gov.uk/get-a-permit-to-deal-with-a-coal-mine-on- your-property https://www.gov.uk/government/publications/permit-process/permit-process In areas where shallow coal seams are present caution should be taken when carrying out any on site burning or heat focused activities. If any future development has the potential to encounter coal seams which require excavating, for example excavation of building foundations, service trenches, development platforms, earthworks, non- coal mineral operations, an Incidental Coal Agreement will be required. Further information regarding Incidental Coal Agreements can be found here - https://www.gov.uk/government/publications/incidental-coal-agreement/guidance-notes-for-applicants-for-incidental-coal-agreements If any coal mining features are unexpectedly encountered during development, this should be reported immediately to the Mining Remediation Authority on 0800 288 4242. Further information is available on the Mining Remediation Authority website at: https://www.gov.uk/government/organisations/mining-remediation-authority
  6. National Grid The application site is located in close proximity to an electricity substation. The applicant is advised that separate consent, guidance, or safety measures may be required for any works taking place near electricity infrastructure. https://www.nationalgrid.com/electricity-transmission/network-and-infrastructure/working-near-our-assets
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.