In accordance with Paragraph 38 of the National Planning Policy Framework the Local Planning Authority has worked with the applicant in a positive and proactive manner to approve the proposed development, which accords with the Local Plan and the National Planning Policy Framework.
The development to which this permission relates must be begun not later than 17-Apr-2026, the expiration of three years beginning with the date on which the original permission was granted. Reason To comply with the requirements of Section 91 of the Town & Country Planning Act 1990.
The development herby permitted shall be carried out in accordance with the following approved plans: Existing Site Location Plan and Proposed Block Plan 2025-08 01 Proposed Plans & Elevations 2025-08 02 Proposed Streetscene 2025-08 03 Reason For the avoidance of doubt and in the interests of proper planning.
Prior to the erection or installation of any new external lighting to the extension hereby permitted, details of the proposed lighting shall be submitted to and agreed in writing by the Local Planning Authority. Reason In the interests of controlling light spillage in the context of the AONB in accordance with Local Plan Policy CP14.
Cadent Gas Ltd own and operate the gas infrastructure within the area of your development. Prior to carrying out works, please register on www.linesearchbeforeudig.co.uk to submit details of the planned works for review, ensuring requirements are adhered to. The original holding objection was triggered due to the presence of a High-Pressure Major Accident Hazard Pipeline (MAHP). The minimum building proximity distance (BPD) for the pipelines and associated installations is as follows: • Specific HP metre BPD 14 • Specific LP metre BPD 1 The building proximity distance taken from The Institution of Gas Engineers and Managers publication IGEM/TD/1 Edition 5 which is the standard applicable to steel pipelines and associated installations for high pressure gas transmission and IGEM/TD/3 Edition 5 Steel and PE pipelines for gas distribution
Coal Authority The proposed development lies within a coal mining area which may contain unrecorded coal mining related hazards. If any coal mining feature is encountered during development, this should be reported immediately to the Mining Remediation Authority on 0345 762 6846 or if a hazard is encountered on site call the emergency line 0800 288 4242. Further information is also available on the Mining Remediation Authority website at: https://www.gov.uk/government/organisations/mining-remediation-authority
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.