Before the commencement of any works other than demolition, including works and deliveries associated with construction, a Construction Management Plan (CMP) shall be submitted to and approved in writing by the Local Planning Authority. The management plan shall include: - Construction and delivery hours (to avoid school opening and closing times) - Arrangements for the parking of site operatives - Storage of plant and materials used in constructing the development. - Measures to remove mud or debris carried onto the adopted highway. Reason In the interest of highway safety.
Prior to the commencement of any construction or site preparation works, approved protective fencing shall be erected in the positions shown on the approved Tree Protection Plan ref 1808-TPP Rev 3. Within the enclosed area known as the Tree Protection Zone, no work will be permitted without the written consent of the Local Planning Authority. No storage of material, equipment or vehicles will be permitted within this zone. Service routes will not be permitted to cross the Tree Protection Zones unless written consent of the Local Planning Authority is obtained. The Tree Protection Zone will be maintained intact and the vegetation within maintained until the cessation of all construction works or until the Local Planning Authority gives written consent for variation. Reason To ensure the retention and protection of the existing vegetation which makes an important contribution to the visual amenity of the area. In accordance with Local Plan Policies CP3, CP12, CP14 and the NPPF.
The development hereby permitted shall not be first occupied until the approved drainage details, as shown on the following plans, have been implemented in full. The details shall be maintained for the lifetime of the development: 250426-SUB-XX-XX-DR-C-02400-S2-P01 250426-SUB-XX-XX-DR-C-02300-S2-P02 250426-SUB-XX-XX-DR-C-02402-S2-P03 250426-SUB-XX-XX-DR-C-02401-S2-P02 S250426-SUB-XX-XX-RP-D-001_DRAINAGE STRATEGY MAINTENANCE SCHEDULE_R02 Reason This is to ensure that the development is provided with a satisfactory means of drainage as well as to prevent or to avoid exacerbating any flooding issues and to minimise the risk of pollution.
Means of illumination of the site shall be completed in full accordance with the approved scheme as detailed within document ref. Lighting Assessment P189-900 prior to the first use of the development hereby approved. The details shall be implemented prior to first occupation and shall be retained for the lifetime of the development. Reason In the interests of protecting the amenity of neighbouring occupiers from light pollution.
The development hereby permitted shall not be brought into use until the access and parking areas have been provided in accordance with Drawing No. CANN-FRO-CAR-006-P-04G Proposed Site Plan and CANN-FRO-CAR-006-P-09D Finishes Plan and shall thereafter be retained for the lifetime of the development. Reason In the interest of highway safety.
The development hereby permitted shall not be brought into use until the access and parking areas have been provided in accordance with Drawing No. CANN-FRO-CAR-006-P-04G Proposed Site Plan and CANN-FRO-CAR-006-P-09D Finishes Plan and shall thereafter be retained for the lifetime of the development. Reason In the interest of highway safety.
No trees or hedges shown as retained on Dwg No.FRO-CAR-006-P-04 Rev G shall be cut down, topped, lopped, uprooted or removed without the prior written permission of the Local Planning Authority nor shall they be wilfully damaged or destroyed. Any trees or hedges which, within a period of 5 years from completion of the development are cut down, topped, lopped or uprooted without permission of the Local Planning Authority or become seriously damaged or diseased or die shall be replaced in the next planting season with similar size and species unless the Local Planning Authority gives written consent to any variation. Reason The existing vegetation makes an important contribution to the visual amenity of the area. In accordance with Local Plan Policies CP3, CP14, CP12 and the NPPF.
The site shall not be open for business outside the hours of 08:00hrs to 22:00hrs, daily. Reason To ensure that the proposed development does not prejudice the enjoyment by neighbouring occupiers of their properties and to ensure compliance with the Local Plan Policy CP3 - Chase Shaping, Design and the NPPF.
The development hereby permitted shall be carried out in accordance with the following approved plans: CANN-FRO-CAR-006-P-01F Block and Location Plan CANN-FRO-CAR-006-P-04G Proposed Site Plan CANN-FRO-CAR-006-P-09D Finishes Plan CANN-FRO-CAR-006-P-12A Existing and Proposed Site Sections 1808TPP rev3 CANN-FRO-CAR-006-P-11B Existing and Proposed Site Levels Lighting Assessment P189-900 Carbana Cannock CANN-FRO-CAR-006-P-08 Proposed Valet Centre Plan and Elevations Ancillary Equipment Plan FRO-CAR-006-P-10 Rev B Reason For the avoidance of doubt and in the interests of proper planning
Coal Authority The proposed development lies within a coal mining area which may contain unrecorded coal mining related hazards. If any coal mining feature is encountered during development, this should be reported immediately to the Coal Authority on 0345 762 6848. Further information is also available on the Coal Authority website at: www.gov.uk/government/organisations/the-coal-authority
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.