The development to which this permission relates must be begun not later than the expiration of three years beginning with the date on which this permission is granted. Reason To comply with the requirements of Section 91 of the Town & Country Planning Act 1990.
The development hereby permitted shall be constructed in accordance with drawing numbers 0059278-BHE-XX-XX-DR-C-30006, Rev P03, 0059278-BHE-XX-XX-DR-C32601, Rev P01 and 0059278-BHE-XX-XX-DR-C-32611, Rev P01 prior to the opening of the All Through School and shall remain until such time as not required due to the full opening of the spine road approved by application CH/23/0312. Reason: In the interests of assuring the temporary barriers and fences are in place for the necessary period and are removed thereafter in accordance with Local Plan Policy CP3.
3. The development hereby permitted shall be carried out in accordance with the following approved plans: 0059278-BHE-XX-XX-DR-C-30001 P00 Temp 3 Planning Site Location Plan Sheet 1 0059278-BHE-XX-XX-DR-C-30002 P00 Temp 3 Planning Site Location Plan Sheet 2 0059278-BHE-XX-XX-DR-C-30005 P00 Temp 3 Planning Existing Site Plan 0059278-BHE-XX-XX-DR-C-30006 P03 Temp 3 Planning Proposed Site Plan 0059278-BHE-XX-XX-DR-C-32601 P01 Temp 3 Planning Highways Vehicle Tracking 0059278-BHE-XX-XX-DR-C-32611 P01 Temp 3 Planning Highways Visibility Splays TW490.07 0 Generic Hoarding Above Ground Foundation 07/02189 Euroguard Combi Double Gates Reason: In the interests of proper planning and to define the consent.
In accordance with paragraph 38 of the National Planning Policy Framework the Local Planning Authority has worked with the applicant in a positive and proactive manner to approve the proposed development, which accords with the Local Plan and the National Planning Policy Framework.
National Grid Electricity Distribution (NGED) has Extra High Voltage (EHV) (132kV) network installed on this site. NGED welcomes contact with the developer and MUST be contacted in all instances for safety guidance, proximity clearances and clear working methodologies related to locating equipment and safe working practices prior to any physical (or survey) works at this site. Any alteration, building or ground works proposed with the proximity of any network, apparatus or equipment that may or may not directly affect cables or conductors, MUST be notified in detail to National Grid Electricity Distribution.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.