Council planning record

Erection of 3x bed detached dwelling adjoining existing semi detached dwelling and relocation of three public car parking spaces

25, Coppice Road, Rugeley, WS15 1LT

Decision made 14 Oct 2025 Full - Approval with Conditions. Delegated.Reference: CH/25/0028Cannock Chase District Council

Last published check: 2 Oct 2026, 04:11. Check the council record for more recent changes.

Application location

25, Coppice Road, Rugeley, WS15 1LT

This record has no verified map location.

Application summary

Status
Decision made 14 Oct 2025 Full - Approval with Conditions. Delegated.
Application type
Full Planning Application
Received
20 Jan 2025
Validated
4 Feb 2025
Determination deadline
31 Mar 2025
Local authority
Cannock Chase District Council

Application overview

Erection of 3x bed detached dwelling adjoining existing semi detached dwelling and relocation of three public car parking spaces

Proposal details

Reference
CH/25/0028
Alternative references
PP-13691786
Ward
Brereton & Ravenhill
Parish
Rugeley CP
Agent
John Heminsley
UPRN
100031641426

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 28 of 28

DocumentPublishedAction
PhotographPPHOTONot publishedView
Construction Method StatementPSUPPSTANot publishedView
Design and Access StatementPDNASNot publishedView
Approved 14.10.25 - Floor Plan and ElevationsPAPPDWGNot publishedView
Existing Site PlanPPLANNot publishedView
Application Form - Without Personal DataPAPPFRMNot publishedView
Approved 14.10.25 - Site Location PlanPAPPDWG4 Feb 2025View
Shed Layout and PhotographsPSUPPSTA4 Feb 2025View
Env Health commentsPCONSULT17 Feb 2025View
Severn Trent Water commentsPCONSULT27 Feb 2025View
Attachment to Severn Trent Water commentsPCONSULT27 Feb 2025View
Objection receivedPNEIGHCO3 Mar 2025View
Landscaping CommentsPCONSULT11 Mar 2025View
Highways CommentsPCONSULT26 Mar 2025View
Amended - Statutory Biodiversity Metric Calc ToolPAMDPLAN29 May 2025View
Amended - Statutory Biodiversity Metric calc ToolPAMDPLAN29 May 2025View
Ecology Officer commentsPCONSULT29 May 2025View
Highways further commentsPCONSULT11 Jun 2025View
Amended - BNG Calculation SummaryPAMDPLAN11 Jul 2025View
Amended - Preliminary Ecological AppraisalPAMDPLAN11 Jul 2025View
Amended - A4 PEAPAMDPLAN11 Jul 2025View
Amended - BNG EnhancementsPAMDPLAN11 Jul 2025View
Approved 14.10.25 - Amended - Proposed Site Plan Rev.DPAPPDWG17 Sept 2025View
BNG offsetting letterPADDINFO17 Sept 2025View
Amended - Biodiversity Metric Calculation ToolPAMDPLAN30 Sept 2025View
Ecology Officer further commentsPCONSULT7 Oct 2025View
Officer ReportPOFFREP14 Oct 2025View
Decision NoticePDECNOT14 Oct 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Press notice start date

    Published milestoneCouncil source
  6. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Extension date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Dispatch date

    Published milestoneCouncil source
  10. Decision date

    Published milestoneCouncil source

Decision & conditions

Full - Approval with Conditions
Decision Notice
Planning conditions
  1. In accordance with Paragraph 38 of the National Planning Policy Framework the Local Planning Authority has worked with the applicant in a positive and proactive manner to approve the proposed development, which accords with the Local Plan and the National Planning Policy Framework.
  2. The effect of Paragraph 13 of Schedule 7A to the Town and Country Planning Act 1990 is that, subject to some exemptions, every grant of planning permission in England is deemed to have been granted subject to the biodiversity gain condition that development may not begin unless: (a) a Biodiversity Gain Plan has been submitted to the planning authority, and (b) the planning authority has approved the plan. This objective is for development to deliver at least a 10% increase in biodiversity value relative to the pre-development biodiversity value of the onsite habitat. This increase can be achieved through onsite biodiversity gains, registered offsite biodiversity gains or statutory biodiversity credits. Based on the information available this permission is considered to be one which WILL require the approval of a Biodiversity Gain Plan before development is begun because none of the statutory exemptions or transitional arrangements are considered to apply. The Planning Authority, for the purposes of determining whether to approve a Biodiversity Gain Plan in respect of this permission is Cannock Chase District Council. When submitting an application to discharge the biodiversity gain condition, the LPA requests that the applicant uses the standard national templates for a Biodiversity Gain Plan and a Habitat Management and Monitoring Plan. Submit a biodiversity gain plan - GOV.UK (www.gov.uk) The Biodiversity Gain Plan should be submitted as an ‘application for approval of details reserved by condition following grant of planning permission’ via the Planning Portal. The biodiversity gain condition cannot be removed or varied. Development to Proceed in Phases Where the permission granted has the effect of requiring or permitting the development to proceed in phases, the modifications in respect of the biodiversity gain condition which are set out in Part 2 of the Biodiversity Gain (Town and Country Planning) (Modifications and Amendments) (England) Regulations 2024 apply. In summary: Biodiversity Gain Plans are required to be submitted to, and approved by, the planning authority before development may be begun (the overall plan), and before each phase of development may be begun (phase plans). Biodiversity net gain - GOV.UK (www.gov.uk) Irreplaceable Habitat If the on-site habitat includes irreplaceable habitat (within the meaning of the Biodiversity Gain Requirements (Irreplaceable Habitat) Regulations 2024) there are additional requirements for the content and approval of Biodiversity Gain Plans. Irreplaceable habitats - GOV.UK (www.gov.uk) Effect of Section 73D of the Town and Country Planning Act 1990 If planning permission is granted on an application made under Section 73 of the Town and Country Planning Act 1990 and a Biodiversity Gain Plan was approved in relation to the previous planning permission (“the earlier Biodiversity Gain Plan”) there are circumstances when the earlier Biodiversity Gain Plan is regarded as approved for the purpose of discharging the biodiversity gain condition subject to which the Section 73 planning permission is granted. Those circumstances are that the conditions subject to which the Section 73 permission is granted: i) do not affect the post-development value of the onsite habitat as specified in the earlier Biodiversity Gain Plan, and ii) in the case of planning permission for a development where all or any part of the onsite habitat is irreplaceable habitat the conditions do not change the effect of the development on the biodiversity of that onsite habitat (including any arrangements made to compensate for any such effect) as specified in the earlier Biodiversity Gain Plan. i) habitat (including any arrangements made to compensate for any such effect) as specified in the earlier Biodiversity Gain Plan.
  3. The development hereby permitted shall be carried out in accordance with the following approved plans: Location Plan 2024:12:10:01A Proposed Site Plan 2024:12:10:03D Floor Plans + Elevations 2024:12:10:04 Reason For the avoidance of doubt and in the interests of proper planning.
  4. The development to which this permission relates must be begun not later than the expiration of three years beginning with the date on which this permission is granted. Reason To comply with the requirements of Section 91 of the Town & Country Planning Act 1990.
  5. No development shall commence until a detailed scheme for the disposal of foul and surface water flows has been submitted to and approved in writing by the Local Planning Authority. The approved scheme shall be implemented in full prior to the first occupation of the development and thereafter retained for the lifetime of the development. The submitted details shall include: • A drainage strategy demonstrating how surface and foul water will be managed, • Evidence that the disposal of surface water via soakaways has been fully explored as the primary method in accordance with the surface water disposal hierarchy set out in Planning Practice Guidance and Section H of the Building Regulations 2010, • If soakaways are not feasible and there is no suitable watercourse, details of other sustainable drainage methods considered, and • Evidence to demonstrate why discharge to the public sewerage system is necessary, if proposed. No surface water shall discharge into the foul or combined sewer system by any means. Reason To ensure that the development is provided with a satisfactory means of drainage as well as reduce the risk of creating or exacerbating a flooding problem and to minimise the risk of pollution.
  6. Prior to the first occupation of the hereby approved development, the site accesses shall be completed within the limits of the public highway in accordance with submitted ‘Proposed Site Plan’ Drawing Number 2024:12:10:03D. The accesses and visibility splays are then to be retained for the life of the development. Reason In the interest of highway safety, in accordance with the NPPF.
  7. The proposed parking as shown on the approved plan shall be sustainably drained, hard surfaced in a bound material prior to the first occupation of the dwelling hereby permitted. Thereafter the parking areas shall be retained in accordance with the approved plans for the lifetime of the development. Reason In the interest of highway safety, in accordance with the NPPF.
  8. The approved landscape works shown on Proposed Site Plan 2024:12:10:03D shall be carried out in the first planting and seeding season following the occupation of any buildings or the completion of the development whichever is the sooner. Reason In the interest of visual amenity of the area. In accordance with Local Plan Policies CP3, CP12, CP14 and the NPPF.
  9. No materials shall be used for the external surfaces of the development other than those specified on the application. Reason In the interests of visual amenity and to ensure compliance with Local Plan Policies CP3, CP15, CP16, RTC3 (where applicable) and the NPPF.
  10. Any trees or plants which within a period of five years from the date of planting die, are removed or become seriously damaged or diseased, shall be replaced in the following planting season with others of similar size and species unless the Local Planning Authority gives written consent to any variation. Reason In the interests of visual amenity of the area. In accordance with Local Plan Policies CP3, CP12, CP14 and the NPPF.
  11. No plant or machinery shall be operated, no loading or unloading of vehicles and no movement of commercial vehicles to or from the site shall take place outside the hours of 08:00 to 18:00 Monday to Friday and 08:00 to 13:00 Saturday. None of the above operations shall be carried out at any time on Sundays or Bank and Public Holidays. Reason To ensure that the proposed development does not prejudice the enjoyment by neighbouring occupiers of their properties and to ensure compliance with the Local Plan Policies CP3 - Chase Shaping, and the NPPF.
  12. Coal Authority (i) The proposed development lies within a coal mining area which may contain unrecorded coal mining related hazards. If any coal mining feature is encountered during development, this should be reported immediately to the Mining Remediation Authority on 0345 762 6846 or if a hazard is encountered on site call the emergency line 0800 288 4242. Further information is also available on the Mining Remediation Authority website at: https://www.gov.uk/government/organisations/mining-remediation-authority
  13. Staffordshire Highways Authority (ii) Please note that prior to the accesses being constructed you require a Section 184 Notice of Approval from Staffordshire County Council. The link below provides a further link to 'vehicle dropped crossings' which includes a 'vehicle dropped crossing information pack' and an application form for a dropped crossing. Please complete and send to the address indicated on the application form which is Staffordshire County Council at Traffic and Network Unit, Staffordshire Place 1, Wedgwood Building, Tipping Street, STAFFORD, Staffordshire, ST16 2DH. (or email to trafficandnetwork@staffordshire.gov.uk) https://www.staffordshire.gov.uk/Highways/licences/Vehicleaccess/VehicleAccessCrossings.aspx
  14. Severn Trent Water (iii) Before undertaking any work on site, all applicants must determine if Severn Trent has any assets in the vicinity of the proposed works. This can be done by accessing our records at www.digdat.co.uk Severn Trent Water advise that even if our statutory records do not show any public sewers within the area you have specified, there may be sewers that have been recently adopted under The Transfer of Sewer Regulations 2011. Our records indicate that there are assets that may be affected by this proposal and as such the applicant must contact Severn Trent before any work takes place. Public sewers and Water mains have statutory protection and may not be built close to, or diverted without consent, consequently you must contact Severn Trent Water to discuss your proposals. Severn Trent will seek to assist you obtaining a solution which protects both the public sewer and the proposed building.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.