Reconstruction of the building for B8 storage and distribution with integral B1 office use approved under application CH/16/013 following a fire

Kingswood Lakeside, Blakeney Way

Registered application. Delegated.Reference: CH/24/298Cannock Chase District Council

Last published check: 2 Oct 2026, 15:15. Check the council record for more recent changes.

Application location

Kingswood Lakeside, Blakeney Way

This record has no verified map location.

Application summary

Status
Registered application. Delegated.
Application type
Not published
Received
28 Oct 2024
Validated
29 Oct 2024
Determination deadline
26 Jan 2025
Local authority
Cannock Chase District Council

Application overview

Reconstruction of the building for B8 storage and distribution with integral B1 office use approved under application CH/16/013 following a fire

Proposal details

Reference
CH/24/298
Alternative references
PP-13484488
Ward
Norton Canes
Parish
Norton Canes CP
Agent
Lexi Dones
UPRN
10091051251

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 49 of 49

DocumentPublishedAction
Planning StatementPSUPPSTANot publishedView
External Lighting ReportPSUPPSTANot publishedView
Indicative External Lighting LayoutPSUPPSTANot publishedView
Flood risk assessmentPFLOODRINot publishedView
Attenuation Area JointingPPLANNot publishedView
Drainage LayoutPDRAINLANot publishedView
Superseded - Drainage LayoutPSUPPLANNot publishedView
Approved 27.3.25 - Proposed Main Office Hub OfficePAPPDWGNot publishedView
Existing Main Office Hub OfficePPLANNot publishedView
Approved 27.3.25 - Proposed ElevationsPAPPDWGNot publishedView
Approved 27.3.25 - Proposed Section B-BPAPPDWGNot publishedView
Approved 27.3.25 - Proposed Section A-APAPPDWGNot publishedView
Existing Sections B-BPPLANNot publishedView
Existing Sections A-APPLANNot publishedView
Existing ElevationsPPLANNot publishedView
Approved 27.3.25 - Existing Bin Storage and Collection PlanPAPPDWGNot publishedView
Existing Site PlanPSITEPLANot publishedView
Approved 27.3.25 - Proposed Roof PlansPAPPDWGNot publishedView
Existing Roof PlansPPLANNot publishedView
Approved 27.3.25 - Proposed Warehouse PlansPAPPDWGNot publishedView
Existing Warehouse PlansPPLANNot publishedView
Design and access statementPDNASNot publishedView
Design and access statementPDNASNot publishedView
Design and access statementPDNASNot publishedView
Design and access statementPDNASNot publishedView
Approved 27.3.25 - Site Location PlanPAPPDWGNot publishedView
Application Form - Without Personal DataPAPPFRMNot publishedView
BREEAM NC Version 6.1 Pre-AssessmentPSUPPSTA29 Oct 2024View
BREEAM NC V6.1 Assessment TrackerPSUPPSTA29 Oct 2024View
HSE commentsPCONSULT31 Oct 2024View
Rights of Way commentsPCONSULT31 Oct 2024View
Env Health commentsPCONSULT1 Nov 2024View
Ecology Officer commentsPCONSULT4 Nov 2024View
Coal Authority commentsPCONSULT6 Nov 2024View
Econ Dev commentsPCONSULT6 Nov 2024View
Environmental Agency commentsPCONSULT18 Nov 2024View
Flood Team commentsPCONSULT20 Nov 2024View
Floods Team further commentsPCONSULT9 Dec 2024View
Approved 27.3.25 - Amended Plan - Proposed Site PlanPAPPDWG20 Jan 2025View
Highways commentsPCONSULT21 Jan 2025View
Approved 27.3.2025 - Amended - Drainage LayoutPAPPDWG28 Jan 2025View
Approved 27.3.25 - Drainage Layout - Attenuation TankPAPPDWG28 Jan 2025View
Flood Risk AssessmentPADDINFO28 Jan 2025View
Flood Team further commentsPCONSULT12 Feb 2025View
Approved 27.3.25 - Sustainable Drainage StatementPAPPDWG10 Mar 2025View
Severn Trent Water commentsPCONSULT11 Mar 2025View
Flood Team commentsPCONSULT24 Mar 2025View
Officer ReportPOFFREP27 Mar 2025View
Decision NoticePDECNOT27 Mar 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Press notice start date

    Published milestoneCouncil source
  5. Site notice date

    Published milestoneCouncil source
  6. Valid date

    Published milestoneCouncil source
  7. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Extension date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Dispatch date

    Published milestoneCouncil source
  12. Decision date

    Published milestoneCouncil source

Decision & conditions

Full - Approval with Conditions
Decision Notice
Planning conditions
  1. The development hereby permitted shall be carried out in accordance with the following approved plans: 24365-UMC-XXXX-SI-DR-A-0601 Proposed Site Plan 24365-UMC-XXXX-XX-DR-A-1301 Proposed Elevations 24365-UMC-XXXX-SI-DR-A-0501 Location Plan 24365-UMC-XXXX-ZZ-DR-A-1002 Proposed Main Office Hub Office Layout 24365-UMC-XXXX-XX-DR-A-1102 Proposed Section B-B Main Office 24365-UMC-XXXX-XX-DR-A-1101 Proposed Section A-A Warehouse 24365-UMC-XXXX-SI-DR-A-0510 Existing Bin Storage and Collection Plan 24365-UMC-XXXX-R1-DR-A-1070 Proposed Roof Plan 24365-UMC-XXXX-00-DR-A-1001 Proposed Warehouse Floor Plan 24365-UMC-XXXX-SI-DR-A-0601 Proposed Site Plan 24365-UMC-XXXX-XX-DR-A-1301 Proposed Elevations 24365-UMC-XXXX-SI-DR-A-0501 Location Plan 24365-UMC-XXXX-ZZ-DR-A-1002 Proposed Main Office Hub Office Layout 24365-UMC-XXXX-XX-DR-A-1102 Proposed Section B-B Main Office 24365-UMC-XXXX-XX-DR-A-1101 Proposed Section A-A Warehouse 24365-UMC-XXXX-SI-DR-A-0510 Existing Bin Storage and Collection Plan 24365-UMC-XXXX-R1-DR-A-1070 Proposed Roof Plan 24365-UMC-XXXX-00-DR-A-1001 Proposed Warehouse Floor Plan 244355-BWB-EXT-XX-D-C-0500 S1 P01 244355-BWB-EXT-XX-D-C-0510 S1 P01 BWB – Kingswood, Lakeside, Cannock – Sustainable Drainage Statement – Document Number 244355-BWB-GEN-XX-RP-C0001 – BWB Reference 244355 - Revision P02 – Dated 27/02/2025. Reason For the avoidance of doubt and in the interests of proper planning.
  2. The development to which this permission relates must be begun not later than the expiration of three years beginning with the date on which this permission is granted. Reason To comply with the requirements of Section 91 of the Town & Country Planning Act 1990.
  3. The proposed car and cycle parking, accesses, servicing and circulation areas as shown on the approved ‘Site Plan – proposed’ Drawing Number 0601 Revision P7 shall be retained and sustainably drained in accordance with Drainage Layouts 244355-BWB-EXT-XX-D-C-0500 S1 P01 and 244355-BWB-EXT-XX-D-C-0510 S1 P01. Thereafter these areas shall be retained in accordance with the approved plans for the lifetime of the development. Reason In the interest of highway safety, in accordance with CP10 and paragraph 116 of the National Planning Policy Framework.
  4. Prior to first occupation, details of the level of staff lockers and showering facilities within the building shall be submitted to and approved in writing by the Local Planning Authority and shall thereafter be retained as such for the lifetime of the development. Reason In the interest of worker provision, in accordance with the National Planning Policy Framework.
  5. The development permitted by this planning permission shall only be carried out in accordance with the approved Drainage Strategy: • BWB – Kingswood, Lakeside, Cannock – Sustainable Drainage Statement – Document Number 244355-BWB-GEN-XX-RP-C0001 – BWB Reference 244355 - Revision P02 – Dated 27/02/2025. Reason To prevent flooding by ensuring the satisfactory storage of/disposal of surface water from the site
  6. The development hereby permitted shall take place in full accordance with the disposal of foul and surface water flow details as shown on plan references 244355-BWB-EXT-XX-D-C-0500 S1 P01 and 244355-BWB-EXT-XX-D-C-0510 S1 P01. The scheme shall be implemented in accordance with the approved details before the development is first brought into use. Reason To ensure that the development is provided with a satisfactory means of drainage as well as reduce the risk of creating or exacerbating a flooding problem and to minimise the risk of pollution.
  7. No materials shall be used for the external surfaces of the development other than those specified on the application, except with the written approval of the Local Planning Authority. Reason In the interests of visual amenity and to ensure compliance with Local Plan Policies CP3 and the NPPF
  8. The proposed development lies within an area that has been defined by the Coal Authority as containing potential hazards arising from former coal mining activity at the surface or shallow depth. These hazards can include: mine entries (shafts and adits); shallow coal workings; geological features (fissures and break lines); mine gas and former surface mining sites. Although such hazards are seldom readily visible, they can often be present and problems can occur in the future, particularly as a result of new development taking place. It is recommended that information outlining how former mining activities may affect the proposed development, along with any mitigation measures required (for example the need for gas protection measures within the foundations), is submitted alongside any subsequent application for Building Regulations approval (if relevant). Any form of development over or within the influencing distance of a mine entry can be dangerous and raises significant land stability and public safety risks. As a general precautionary principle, the Coal Authority considers that the building over or within the influencing distance of a mine entry should be avoided. In exceptional circumstance where this is unavoidable, expert advice must be sought to ensure that a suitable engineering design which takes into account all the relevant safety and environmental risk factors, including mine gas and mine-water. Your attention is drawn to the Coal Authority Policy in relation to new development and mine entries available at: www.gov.uk/government/publications/building-on-or-within-the-influencing-distance-of-mine-entries Any intrusive activities which disturb or enter any coal seams, coal mine workings or coal mine entries (shafts and adits) requires a Coal Authority Permit. Such activities could include site investigation boreholes, excavations for foundations, piling activities, other ground works and any subsequent treatment of coal mine workings and coal mine entries for ground stability purposes. Failure to obtain a Coal Authority Permit for such activities is trespass, with the potential for court action. If any coal mining features are unexpectedly encountered during development, this should be reported immediately to the Coal Authority on 0345 762 6848. Further information is available on the Coal Authority website at: www.gov.uk/government/organisations/the-coal-authority Under the Coal Industry Act 1994 any intrusive activities which disturb or enter any coal seams, coal mine workings or coal mine entries (shafts and adits) require the prior written permission of the Coal Authority since these activities can have serious public health and safety implications. Such activities could include site investigation boreholes, the piling of foundations, other ground works and any subsequent treatment of coal mine workings and coal mine entries for ground stability purposes. Failure to obtain permission to enter or disturb our property will result in the potential for court action. Application forms for Coal Authority permission and further guidance can be obtained from The Coal Authority’s website at: www.gov.uk/get-a-permit-to-deal-with-a-coal-mine- on-your-property
  9. In accordance with paragraph 38 of the National Planning Policy Framework the Local Planning Authority has worked with the applicant in a positive and proactive manner to approve the proposed development, which accords with the Local Plan and the National Planning Policy Framework.
  10. Before undertaking any work on site, all applicants must determine if Severn Trent has any assets in the vicinity of the proposed works. This can be done by accessing our records at www.digdat.co.uk Severn Trent Water advise that even if our statutory records do not show any public sewers within the area you have specified, there may be sewers that have been recently adopted under The Transfer of Sewer Regulations 2011. Public sewers and Water mains have statutory protection and may not be built close to, or diverted without consent, consequently you must contact Severn Trent Water to discuss your proposals. Severn Trent will seek to assist you obtaining a solution which protects both the public sewer and the proposed building. Planning Practice Guidance and section H of the Building Regulations 2010 detail surface water disposal hierarchy. The disposal of surface water by means of soakaways should be considered as the primary method. If this is not practical and there is no watercourse available as an alternative, other sustainable methods should also be explored. If these are found unsuitable satisfactory evidence will need to be submitted before a discharge to the public sewerage system is considered. No surface water to enter the foul or combined water systems by any means.
  11. Public right of way No. 28 Norton Canes runs adjacent to the application site along the northern boundary. The granting of planning permission does not constitute authority for any interference with the public right of way and associated items - or its obstruction (temporary or permanent). This is the case both during the building stage or once the development is completed should the permission be granted. The term obstruction, in this context, applies to items such as gates or stiles which are regarded as licenced obstructions which must be sanctioned by the highways authority, and also to any vehicles parking on the right of way, including those associated with construction.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.