Council planning record

Erection of a single storey rear extension following demolition of existing conservatory

6, St Christopher Close, Rawnsley, Staffordshire, Cannock, WS12 0FH

Decision made 20 Jun 2024 Full - Approval with Conditions. Delegated.Reference: CH/24/118Cannock Chase District Council

Last published check: 3 Oct 2026, 12:53. Check the council record for more recent changes.

Application location

6, St Christopher Close, Rawnsley, Staffordshire, Cannock, WS12 0FH

This record has no verified map location.

Application summary

Status
Decision made 20 Jun 2024 Full - Approval with Conditions. Delegated.
Application type
Full Planning Application
Received
25 Apr 2024
Validated
1 May 2024
Determination deadline
25 Jun 2024
Local authority
Cannock Chase District Council

Application overview

Erection of a single storey rear extension following demolition of existing conservatory

Proposal details

Reference
CH/24/118
Ward
Rawnsley
Agent
Kelly Holmes
UPRN
MAN000000000120402

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 8 of 8

DocumentPublishedAction
Application Form - redactedPAPPFRM25 Apr 2024View
Approved 20.6.24 - Site Location PlanPAPPDWG25 Apr 2024View
Existing Plans and ElevationsPPLAN25 Apr 2024View
Approved 20.6.24 - Proposed Plans and ElevationsPAPPDWG25 Apr 2024View
Approved 20.6.24 - Proposed Site PlanPAPPDWG25 Apr 2024View
Existing Site PlanPPLAN1 May 2024View
officer reportPOFFREP20 Jun 2024View
decision noticePDECNOT20 Jun 2024View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Committee date

    Published milestoneCouncil source
  2. Application date

    Published milestoneCouncil source
  3. Received date

    Published milestoneCouncil source
  4. Registration date

    Published milestoneCouncil source
  5. Valid date

    Published milestoneCouncil source
  6. Press notice start date

    Published milestoneCouncil source
  7. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Dispatch date

    Published milestoneCouncil source
  9. Decision date

    Published milestoneCouncil source
  10. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Full - Approval with Conditions
decision notice
Planning conditions
  1. Reason for Grant of Permission In accordance with paragraph 38 of the National Planning Policy Framework the Local Planning Authority has worked with the applicant in a positive and proactive manner to approve the proposed development, which accords with the Local Plan and the National Planning Policy Framework.
  2. Note to Developer Coal Authority The proposed development lies within an area that has been defined by the Coal Authority as containing potential hazards arising from former coal mining activity at the surface or shallow depth. These hazards can include: mine entries (shafts and adits); shallow coal workings; geological features (fissures and break lines); mine gas and former surface mining sites. Although such hazards are seldom readily visible, they can often be present and problems can occur in the future, particularly as a result of new development taking place. It is recommended that information outlining how former mining activities may affect the proposed development, along with any mitigation measures required (for example the need for gas protection measures within the foundations), is submitted alongside any subsequent application for Building Regulations approval (if relevant). Any form of development over or within the influencing distance of a mine entry can be dangerous and raises significant land stability and public safety risks. As a general precautionary principle, the Coal Authority considers that the building over or within the influencing distance of a mine entry should be avoided. In exceptional circumstance where this is unavoidable, expert advice must be sought to ensure that a suitable engineering design which takes into account all the relevant safety and environmental risk factors, including mine gas and mine-water. Your attention is drawn to the Coal Authority Policy in relation to new development and mine entries available at: www.gov.uk/government/publications/building-on-or-within-the-influencing-distance-of-mine-entries Any intrusive activities which disturb or enter any coal seams, coal mine workings or coal mine entries (shafts and adits) requires a Coal Authority Permit. Such activities could include site investigation boreholes, excavations for foundations, piling activities, other ground works and any subsequent treatment of coal mine workings and coal mine entries for ground stability purposes. Failure to obtain a Coal Authority Permit for such activities is trespass, with the potential for court action. If any coal mining features are unexpectedly encountered during development, this should be reported immediately to the Coal Authority on 0345 762 6848. Further information is available on the Coal Authority website at: www.gov.uk/government/organisations/the-coal-authority
  3. The development to which this permission relates must be begun not later than the expiration of three years beginning with the date on which this permission is granted. Reason To comply with the requirements of Section 91 of the Town & Country Planning Act 1990.
  4. The materials to be used for the external surfaces of the development shall be of the same type, colour and texture as those used on the existing building. Reason In the interests of visual amenity and to ensure compliance with Local Plan Policies CP3, CP15, CP16, RTC3 (where applicable) and the NPPF.
  5. The development hereby permitted shall be carried out in accordance with the following approved plans: Proposed Site Plan RS-004 Proposed Plans and Elevations RS-003 Reason For the avoidance of doubt and in the interests of proper planning.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.