Council planning record

Variation of condition 15 (approved plans) on planning application CH/19/021

151, Walsall Road, Norton Canes, Cannock, WS11 9QX

Decision made 24 Jun 2024 Full - Approval with Conditions. Delegated.Reference: CH/24/060Cannock Chase District Council

Last published check: 3 Oct 2026, 14:31. Check the council record for more recent changes.

Application location

151, Walsall Road, Norton Canes, Cannock, WS11 9QX

This record has no verified map location.

Application summary

Status
Decision made 24 Jun 2024 Full - Approval with Conditions. Delegated.
Application type
Full Planning Application
Received
4 Mar 2024
Validated
22 Apr 2024
Determination deadline
14 Jun 2024
Local authority
Cannock Chase District Council

Application overview

Variation of condition 15 (approved plans) on planning application CH/19/021

Proposal details

Reference
CH/24/060
Ward
Norton Canes
Parish
Norton Canes CP
Agent
Gary Deffley
UPRN
100032223790

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 8 of 8

DocumentPublishedAction
Approved 24.6.24 - Foul Drainage LayoutPAPPDWG5 Mar 2024View
Approved 24.6.24 - Ground Floor and Site Section PlanPAPPDWG11 Mar 2024View
Application Form - without personal informationPAPPFRM22 Apr 2024View
Environmental Health commentsPCONSULT2 May 2024View
Staffs Police commentsPCONSULT7 May 2024View
Severn Trent Water commentsPCONSULT15 May 2024View
decision noticePDECNOT24 Jun 2024View
officer reportPOFFREP8 Jul 2024View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Press notice start date

    Published milestoneCouncil source
  6. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Extension date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Dispatch date

    Published milestoneCouncil source
  10. Decision date

    Published milestoneCouncil source

Decision & conditions

Full - Approval with Conditions
decision notice
Planning conditions
  1. The development to which this permission relates must be begun not later than 23rd May 2027. Reason To comply with the requirements of Section 91 of the Town & Country Planning Act 1990 and the date of the original planning consent CH/19/021.
  2. The development hereby approved shall take place in full accordance with external surface details as shown on dwg reference Rev B-10-05-022A and shall be retained as such for the lifetime of the development. Reason In the interests of visual amenity and to ensure compliance with Local Plan Policies CP3, CP15, CP16, RTC3 (where applicable) and the NPPF.
  3. No part of the development hereby approved shall commence until approved external environment details as shown on Dwg no. Rev B 10-05-022A have been implemented. The details shall thereafter be retained for the lifetime of the development unless otherwise approved in writing by the Local Planning Authority. Reason In the interest of visual amenity of the area and in accordance with Local Plan Policies CP3, CP12, CP14 and the NPPF.
  4. The approved landscape works approved by condition No.3 shall be carried out in the first planting and seeding season following the occupation of any buildings or the completion of the development whichever is the sooner. Reason In the interest of visual amenity of the area. In accordance with Local Plan Policies CP3, CP12, CP14 and the NPPF.
  5. Any trees or plants which within a period of five years from the date of planting die, are removed or become seriously damaged or diseased, shall be replaced in the following planting season with others of similar size and species unless the Local Planning Authority gives written consent to any variation. Reason In the interests of visual amenity of the area. In accordance with Local Plan Policies CP3, CP12, CP14 and the NPPF.
  6. The development hereby permitted shall not be brought into use until the access and parking areas have been provided in accordance with approved dwg no 3393-004 Rev B and kept as intended for the lifetime of the development. Reason In the interests of highway safety and to comply with Cannock Chase Local Plan CP10 and the objectives contained within the NPPF.
  7. The development hereby approved shall take place in full accordance with the Construction Method Statement - Norton Canes produced by Furlow Construction and shall be adhered to throughout the construction period. Reason In order to comply with the National Planning Policy Framework.
  8. No demolition or construction work shall be carried out and no deliveries in connection with this work shall be taken at or despatched from the site outside the following times; 8am to 6pm weekdays and 8am to 1 pm on Saturdays only. Reason To protect the amenity of the neighbouring residents in accordance with Local Plan Policy CP3.
  9. The development hereby approved shall take place in full accordance with drainage plan reference c7903 - 501_P1 Proposed Site Drainage by Couch Consulting Engineers and shall be implemented before the development is brought into first use and retained as such for the lifetime of the development unless otherwise agreed in writing by the Local Planning Authority. Reason This is to ensure that the development is provided with a satisfactory means of drainage as well as to prevent or to avoid exacerbating any flooding issues and to minimise the risk of pollution.
  10. Notwithstanding the provisions of the Town and Country Planning (General Permitted Development)(England) Order 2015 (or any Order revoking and reenacting that Order with or without modification), no development within Part 1 of Schedule 2 to the Order shall be carried out without an express grant of planning permission, from the Local Planning Authority, namely: • The enlargement, improvement or other alteration of the dwellinghouse; • The enlargement of the dwellinghouse consisting of an addition or alteration to its roof; • Any other alteration to the roof of the dwellinghouse; • The erection or construction of a porch outside any external door of the dwelling; • The provision within the curtilage of the dwellinghouse of any building or enclosure, swimming or other pool required for a purpose incidental to the enjoyment of the dwellinghouses such, or the maintenance, improvement or other alteration of such a building or enclosure; • The provision within the curtilage of the dwelling house of a hard surface for any purpose incidental to the enjoyment of the dwellinghouse as such; • The erection or provision within the curtilage of the dwellinghouse of a container for the storage of oil for domestic heating; or • The installation, alteration or replacement of a satellite antenna on the dwellinghouse or within the curtilage of the dwellinghouse. Reason The Local Planning Authority considers that such development would be likely to adversely affect the amenity of neighbouring occupiers and the character of the area. It is considered to be in the public interest to require an application to enable the merits of any proposal to be assessed and to ensure compliance with Local Plan Policy CP3 - Chase Shaping - Design and the NPPF.
  11. The development hereby approved shall not commence above ground level until the provision of bat boxes in accordance with document ‘Bat box locations Walsall Road Norton Canes August 2021 ver 1.3 by ecology consultant Chris Smith’ has been implemented. The details shall thereafter be retained for the lifetime of the development, unless agreed in writing by the Local Authority. Reason In the interests of enhancing bat breeding habitat in accordance with Policy CP12 of the Local Plan and the NPPF.
  12. If demolition and refurbishment are to be undertaken between the beginning of March and the end of August in any year, there must first be a check undertaken of the building for nesting birds and if birds are nesting then no work can be undertaken until the young have fledged. Reason In the interests of conserving habitats and biodiversity in accordance with Policy CP12 of the Local Plan and the NPPF.
  13. The development hereby approved shall take place in full accordance with dwg ref. 3393-150C in respect of EV charging points and shall be implemented prior to occupation. The works shall thereafter be retained for the lifetime of the development unless otherwise approved in writing by the Local Planning Authority. Reason In the interests of improving air quality and combatting climate change in accordance with policy CP16 and the National Planning Policy Framework.
  14. lf during development, contamination not previously identified is found to be present at the site, no further development (unless otherwise agreed in writing with the Local Planning Authority) shall be carried out until either: A site investigation has been designed and undertaken in accordance with details approved in writing by the Local Planning Authority, an assessment has been produced and a method statement detailing remediation requirements using the information obtained from the site investigation has been approved by the Local Planning Authority; or If the above has been previously undertaken, the developer has submitted and obtained written approval from the Local Planning Authority for an addendum to the method statement detailing how this unsuspected contamination shall be dealt with. Reason In order to enable the development to proceed in a safe environment and to protect the health and safety of its occupiers and to ensure compliance with Local Plan Policy CP3 and the NPPF.
  15. The development hereby permitted shall be carried out in accordance with the following approved plans: Drg No.s 3393-001, 002, 003, 005 Rev A, 006 Rev A, 007 Rev A, 008 Rev A, 009 and JMD(79b)03. Preliminary Bat Roost Assessment and Bird Survey. Reason For the avoidance of doubt and in the interests of proper planning.
  16. Notes to Developer Coal Authority The proposed development lies within a coal mining area which may contain unrecorded coal mining related hazards. If any coal mining feature is encountered during development, this should be reported immediately to the Coal Authority on 0345 762 6848. Further information is also available on the Coal Authority website at: www.gov.uk/government/organisations/the-coal-authority
  17. Highway Authority Please note that prior to the access being widened you require a Section 184 Notice of Approval from Staffordshire County Council. The link below provides a further link to 'vehicle dropped crossings' which includes a 'vehicle dropped crossing information pack' and an application form for a dropped crossing. Please complete and send to the address indicated on the application form which is Staffordshire County Council at Network Management Unit, Staffordshire Place 1, Wedgwood Building, Tipping Street, Stafford, ST16 2DH (or email to nmu@staffordshire.gov.uk)
  18. Severn Trent Water Severn Trent Water advise that there may be a public sewer located within the application site. Although our statutory sewer records do not show any public sewers within the area you have specified, there may be sewers that have been recently adopted under the Transfer Of Sewer Regulations 2011. Public sewers have statutory protection and may not be built close to, directly over or be diverted without consent and contact must be made with Severn Trent Water to discuss the proposals. Severn Trent will seek to assist in obtaining a solution which protects both the public sewer and the building.
  19. Environmental Protection Environmental Protection advise that the site lies in close proximity to a former landfill site which was investigated in detail under the Council's Contaminated Land Strategy in 2010. In view of the outcome there will be no necessity for gas protection measures at this site, however, contingency measures should be available to deal with any unforeseen hotspots of contamination discovered during the progress of works.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.