The development to which this permission relates must be begun not later than the expiration of three years beginning with the date on which this permission is granted. Reason To comply with the requirements of Section 91 of the Town & Country Planning Act 1990.
The development hereby permitted shall be carried out in accordance with the following approved plans: Sketch Proposals DWG Ref 2901-01B Reason For the avoidance of doubt and in the interests of proper planning.
No construction work or deliveries to the site shall be undertaken outside the hours of 0800 to 1900 Monday - Friday, 0800 to 1300 on Saturdays or at any time on Sundays, Bank or Public Holidays. Reason To protect the amenity of neighbouring occupiers.
The development hereby permitted shall not be brought into use until the access, parking and turning areas have been provided in a bound and porous material in accordance with DWG no. 2901 Revision B ‘Sketch Proposals’ and shall thereafter be retained for the lifetime of the development. Reason In the interests of highway safety and the safe and convenient flow of traffic.
No part of the development hereby approved shall commence until a scheme detailing the external environment-landscape, including planting, fencing, walls, surface treatment & construction details for the site has been submitted to and approved by the Local Planning Authority. The details shall be in the form as specified in Annex C of the Supplementary Planning Guidance 'Trees, Landscape and Development'. Thereafter the development shall be carried out in accordance with the approved details. Reason In the interest of visual amenity of the area and in accordance with Local Plan Policies CP3, CP12, CP14 and the NPPF.
Prior to the commencement of the development a Construction and Environmental Management Plan and details of an intended Programme of Works shall be submitted to and agreed in writing by the Local Planning Authority. The Construction and Environmental Management Plan shall include details of site compounds, demolition of existing onsite structures, site hours, types of vehicles, proposed delivery hours, provision for parking of vehicles for site operatives and visitors, loading and unloading of plant and materials and storage of plant and materials used in constructing the development and the method of piling should piling be used. The approved scheme shall thereafter be implemented prior to and throughout the duration of any works on site. Reason To comply with the objectives and policies contained within the NPPF. In the interests of site sustainability and highway safety.
The proposed development lies within a coal mining area which may contain unrecorded coal mining related hazards. If any coal mining feature is encountered during development, this should be reported immediately to the Coal Authority on 0345 762 6848. Further information is also available on the Coal Authority website at: www.gov.uk/government/organisations/the-coal-authority
Please note that prior to the access being widened you require a Section 184 Notice of Approval from Staffordshire County Council. The link below provides a further link to 'vehicle dropped crossings' which includes a 'vehicle dropped crossing information pack' and an application form for a dropped crossing. Please complete and send to the address indicated on the application form which is Staffordshire County Council at Network Management Unit, Staffordshire Place 1, Wedgwood Building, Tipping Street, Stafford, ST16 2DH. (or email to nmu@staffordshire.gov.uk)
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.