Council planning record

Prior Notification: Erection of a single storey rear extension following demolition of existing conservatory

187, Bevan Lee Road, West Chadsmoor, Cannock, WS11 4QB

Unregistered applicationReference: CH/23/0408Cannock Chase District Council

Last published check: 4 Oct 2026, 04:15. Check the council record for more recent changes.

Application location

187, Bevan Lee Road, West Chadsmoor, Cannock, WS11 4QB

This record has no verified map location.

Application summary

Status
Unregistered application
Application type
Not published
Received
5 Dec 2023
Validated
13 Dec 2023
Determination deadline
23 Jan 2024
Local authority
Cannock Chase District Council

Application overview

Prior Notification: Erection of a single storey rear extension following demolition of existing conservatory

Proposal details

Reference
CH/23/0408
Ward
Cannock North
Agent
Katarzyna Senaczek
UPRN
100031615743

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 9 of 9

DocumentPublishedAction
Application Form RedactedPAPPFRM15 Dec 2023View
Site Location PlanPLOCPLAN15 Dec 2023View
Site Location and Block PlanPBLOCKPL15 Dec 2023View
Existing Floor PlansPPLAN15 Dec 2023View
Existing elevationPPLAN15 Dec 2023View
Proposed Floor PlansPFLOORP15 Dec 2023View
Proposed ElevationsPELEVP15 Dec 2023View
Officer ReportPOFFREP22 Jan 2024View
Decision NoticePDECNOT22 Jan 2024View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Press notice start date

    Published milestoneCouncil source
  6. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Dispatch date

    Published milestoneCouncil source
  8. Decision date

    Published milestoneCouncil source
  9. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approved
Decision Notice
Planning conditions
  1. The proposal complies with the requirements of Schedule 2 Part 1 Class A of the Town and Country Planning (General Permitted Development) (Amendment)(No2)(England) Order 2015
  2. The proposed development lies within an area that has been defined by the Coal Authority as containing potential hazards arising from former coal mining activity at the surface or shallow depth. These hazards can include: mine entries (shafts and adits); shallow coal workings; geological features (fissures and break lines); mine gas and former surface mining sites. Although such hazards are seldom readily visible, they can often be present and problems can occur in the future, particularly as a result of new development taking place. It is recommended that information outlining how former mining activities may affect the proposed development, along with any mitigation measures required (for example the need for gas protection measures within the foundations), is submitted alongside any subsequent application for Building Regulations approval (if relevant). Any form of development over or within the influencing distance of a mine entry can be dangerous and raises significant land stability and public safety risks. As a general precautionary principle, the Coal Authority considers that the building over or within the influencing distance of a mine entry should be avoided. In exceptional circumstance where this is unavoidable, expert advice must be sought to ensure that a suitable engineering design which takes into account all the relevant safety and environmental risk factors, including mine gas and mine-water. Your attention is drawn to the Coal Authority Policy in relation to new development and mine entries available at: www.gov.uk/government/publications/building-on-or-within-the-influencing-distance-of-mine-entries Any intrusive activities which disturb or enter any coal seams, coal mine workings or coal mine entries (shafts and adits) requires a Coal Authority Permit. Such activities could include site investigation boreholes, excavations for foundations, piling activities, other ground works and any subsequent treatment of coal mine workings and coal mine entries for ground stability purposes. Failure to obtain a Coal Authority Permit for such activities is trespass, with the potential for court action. If any coal mining features are unexpectedly encountered during development, this should be reported immediately to the Coal Authority on 0345 762 6848. Further information is available on the Coal Authority website at: www.gov.uk/government/organisations/the-coal-authority
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.