The application seeks discharge of condition 10 relating to Planning Approval Notice CH/23/0111. The condition requires the approval of a plan demonstrating the adoption and use of the best practicable means to reduce the effects of noise, vibration, dust and site lighting. The plan is required to include, but not be limited to: (i) Procedures for maintaining good public relations including complaint management, public consultation and liaison (ii) Arrangements for liaison with the Council’s Pollution Control Team (iii) All works and ancillary operations which are audible at the site boundary, or at such other place as may be agreed with the Local Planning Authority, shall be carried out only between the following hours: 08 00 Hours and 18 00 Hours on Mondays to Fridays and 08 00 and 13 00 Hours on Saturdays and; at no time on Sundays and Bank Holidays. (iv) Deliveries to and removal of plant, equipment, machinery and waste from the site must only take place within the permitted hours detailed above. (v) Mitigation measures as defined in BS 5528: Parts 1 and 2 : 2009 Noise and Vibration Control on Construction and Open Sites shall be used to minimise noise disturbance from construction works. (vi) Procedures for emergency deviation of the agreed working hours. (vii) Measures for controlling the use of site lighting whether required for safe working or for security purposes. Reason: In the interests of the amenities of surrounding occupiers during the construction of the development. The details provided are part of a wider Site Construction Phasing Plan as part of CDM regulations. The details provided include information relating to fuel storage, spillages, noise, vibration and lighting as well as hours of operation that accord with those specified by the Council's Environmental Health - who raise no objections to the discharge application in its amended form. Accordingly, subject to compliance with the approved details for the duration of works on site, the submitted details are approved and the prior to commencement requirements of Condition 10 are discharged. Reason In the interests of mitigating impacts associated with construction activities within a sensitive location.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.