England · County council

Cambridgeshire County Council
Planning applications.

Explore collected planning applications and decisions for Cambridgeshire County Council. Search an address, application reference or proposal to find a record.

Collected application statistics

Collected records · All available dates
6,833Searchable applications
47Recorded as pending
97%Approval rate · 6,392 approved or refused records
194Refused applications

6,198 approved · 194 refused · 387 withdrawn. Received dates in our records: 7 Sept 1943 to 30 Sept 2026. Most recent record check: 15 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areasNo boundary records available in this collection
Article 4 direction areasNo boundary records available in this collection

A boundary map is not available for this authority yet. Use council conservation-area and Article 4 guidance above where linked.

Download Article 4 coverage for all authorities (CSV)

Sources: Planning Data conservation areas and Article 4 direction areas. Contains public sector information licensed under the Open Government Licence v3.0.

More application records

  1. ApproveCCC/23/125/FUL

    Proposed Anaerobic Digestion Plant, Associated Infrastructure, Lagoons and Feedstock Clamps

    Rectory Farm, Luddington In The Brook, Peterborough, PE8 5QS

    Received 10 Oct 2023
  2. Application Withdrawn After ValidationH/01491/73/CM

    Extraction of sand and gravel - Exclusive use on Huntingdon & Godmanchester By-Pass

    Rectory Farm Sand And Gravel Pit (Vii), Cow Lane, Godmanchester, Huntingdon, PE18

    Received 24 Aug 1973
  3. ApproveC/00580/88/CC

    Erection Of One 15-Bay And One 11-Bay Mobile Classrooms, And Retention Of Five Mobile Classrooms And 12 Music Practice Huts

    Cambridgeshire College Of Arts And Technology, Collier Road, Cambridge, CB1

    Received 25 May 1988
  4. ApproveH/00220/77/CC

    Erection Of Teaching Block For Language & Humanities, Together With Dining Block

    Ernulf Community School, Eynesbury, St. Neots, Huntingdon, PE192SH

    Received 1 May 1977
  5. Application Withdrawn After ValidationH/05030/06/CC

    Construction of a three-quarter size all weather pitch including fencing and floodlighting

    Land At, Longsands College, Longsands Road, St. Neots, Huntingdon, PE19

    Received 25 Aug 2006
  6. ApproveCCC/22/053/VAR

    Materials Recycling Facility, offices and ancillary development. Informative: Section 73 planning application seeking to vary conditions 3, 7 & 16 of permission H/5007/14/CW to allow the storage of waste and the crushing and screening of hardcore waste outside the materials recycling facility building and to amend the surface water drainage scheme.

    Materials Recycling Facility, Station Road, Warboys, Cambridgeshire

    Received 29 Apr 2022
  7. ApproveE/00146/98/CW

    Extension To Existing Waste Transfer/Recycling Statoin

    Land At, The Carrops, Freckenham, Kennett

    Received 24 Dec 1997
  8. ApproveS/01801/01/CC

    CCTV static camera installation and control panel

    Land At Impington Village College, New Road, Impington, Cambridge, CB4

    Received 24 Aug 2001
  9. ApproveH/01283/99/CC

    RETENTION OF A MOBILE CLASSROOM

    Land Wast Of Eynesbury C Of E Primary School, Montagu Street, St. Neots, Huntingdon, PE19

    Received 31 Aug 1999
  10. ApproveCCC/22/119/DCON

    Discharge of condition application for conditions 29 (Foul and Surface Water Drainage Phase 1) and 30 (Surface Water Drainage Construction Phase) of planning permission CCC/21/262/FUL Full permission for part of a new secondary school comprising 4 forms of entry (600 pupils) with 8 form of entry core facilities; indoor sports facility building, a 150 pupil Special Educational Needs and Disability School (SEND) with post 16 accommodation provision; electricity sub-station; car and cycle parking, hard landscaped playing courts, playing fields, access, landscaping and ancillary development. Outline permission: for the remaining part of the secondary school comprising 4 forms of entry (600 pupils) to create an 8 form of entry school (1,200 pupils), and expansion of the SEND school buildings to provide specialist autism and Post 19 accommodation (50 pupils), car and cycle parking, playing fields, landscaping and ancillary development.

    Alconbury Weald Education Campus , Land At Alconbury Weald, Cambridgeshire.

    Received 1 Nov 2022
  11. ApproveH/00027/80/CC

    Erection Of Junior School

    Duloe Hill, Old Great North Road, Eaton Socon

    Received 18 Jan 1980
  12. ApproveS/01078/07/CW

    Application for a Certificate of Lawfulness of an existing use

    Land Rear Of Units 31/32 Cave Industrial Estate, Fen Road, Chesterton, CB4

    Received 6 Jun 2007
  13. ApproveS/01631/95/CW

    Variation Of Condition 1Of Planning Permission S/1571/94 To Extend Duration Of Infilling Of Former Clay Pits For A Further 18 Months

    Land To Rear Of Clayhithe Cottages, Clayhithe Road, Horningsea, Cambridge, CB5

    Received 20 Nov 1995
  14. ApproveE/3010/15/CC/C1

    Erection of a three-form entry primary school with associated infrastructure including new public highway and pedestrian footpaths with variation of conditions 2 and 7 to install temporary highway crossings prior to occupation and until permanent highway crossings are installed, prior to 31st January 2017, of application E/3000/15/CC. , Condition 5: Street Lighting

    Ely Primary School, Land To The North Of Cam Drive And The South Of King Edgar Close, CB6 2WH

    Received 9 Jan 2016
  15. ApproveS/00961/96/CC

    Extensions

    Babraham C.P. School, High Street

    Received 4 Jul 1996
  16. ApproveH/05009/02/CW

    Retention of household waste recycling centre

    Land At, Household Waste Recycling Centre, Huntingdon Street, St. Neots, Huntingdon, PE19

    Received 8 May 2002
  17. ApproveE/00830/91/CW

    Rationalisation of working hours

    Land At, Scrapyard, Fordham Road, Snailwell, Newmarket, CB8

    Received 11 Oct 1991
  18. ApproveH/05026/07/CC

    Retention of 6-bay mobile classroom building for education purposes

    Sawtry Infant School, Middlefield Road, Sawtry, PE28

    Received 26 Sept 2007
  19. ApproveE/03015/12/CC/C2

    New single storey, 2 form entry (420 place) primary school with Early Years provision; playground; sports provision; kitchen; mail hall; car and cycle parking; hard and soft landscaping and access from The Shade. , Condition 17 - Travel Plan

    Land At The Shade/Kingfisher Drive Junction, Soham, Cambridgeshire

    Received 12 Dec 2014
  20. ApproveS/00372/75/CC

    Erection Of Sports Hall With Changing Rooms

    Comberton Village College, Comberton

    Received 28 Apr 1975
  21. ApproveS/01821/02/CC

    Extensions to provide a new staff room and associated link corridor.

    Land At, Harston & Newton Community Primary School, High Street, Harston, Cambridge, CB2 5PX

    Received 9 Sept 2002
  22. ApproveF/2010/15/CC/C1

    Development of a single carriageway road south of the existing A605 (Peterborough Rd) from a point 480m west to 435m east of the current King's Dyke level crossing passing south of the commercial properties taking the new A605 road over the rail line on a bridge, also including two new 3 arm roundabout junctions (one with Funthams Lane and one with the brickworks access), two underpasses maintaining private access requirements, a shared footway/cycleway along the full length of the link road, two surface water drainage balancing/ soakage ponds, a surface water attenuation ditch, street lighting, safety fencing, signage, landscaping/ planting, a site compound and a temporary access to the brickworks. , Condition No. 8: CEMP

    Land To The South Of The A605 (Peterborough Road) From A Point 480 Metres West To 435 Metres East Of The Kings Dyke Level Crossing

    Received 24 Oct 2018
  23. ApproveF/00820/94/CC

    Erection Of A 3-Bay And Retention Of A 5-Bay Mobile Classroooms

    Meadowgate School, Meadowgate Lane, Wisbech, PE132JH

    Received 20 Feb 1995
  24. ApproveF/00811/79/CC

    Erection Of 3-Bay ""Elliott"" Mobile Classroom

    Sir Harry Smith Community College, Eastrea Road, Whittlesey, Peterborough, PE7 1XB

    Received 22 Oct 1979

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Researching a proposal in Cambridgeshire County Council

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Cambridgeshire County Council, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage