England · County council

Cambridgeshire County Council
Planning applications.

Explore collected planning applications and decisions for Cambridgeshire County Council. Search an address, application reference or proposal to find a record.

Collected application statistics

Collected records · All available dates
6,833Searchable applications
47Recorded as pending
97%Approval rate · 6,392 approved or refused records
194Refused applications

6,198 approved · 194 refused · 387 withdrawn. Received dates in our records: 7 Sept 1943 to 30 Sept 2026. Most recent record check: 15 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areasNo boundary records available in this collection
Article 4 direction areasNo boundary records available in this collection

A boundary map is not available for this authority yet. Use council conservation-area and Article 4 guidance above where linked.

Download Article 4 coverage for all authorities (CSV)

Sources: Planning Data conservation areas and Article 4 direction areas. Contains public sector information licensed under the Open Government Licence v3.0.

More application records

  1. ApproveCCC/24/027/DCON

    Discharge of condition 6 (maintenance of surface water drainage system) of planning permission CCC/22/107/FUL

    Samuel Pepys School, Cromwell Road, Eynesbury, St Neots, Cambridgeshire, PE19 2EZ

    Received 28 Mar 2024
  2. ApproveF/2009/17/CC/C2

    Development to extend school to increase capacity from a 3 to a 4 form entry school including five extensions to provide in total four classrooms together with group rooms, toilets, corridors, kitchen and entrance lobbies with office and associated facilities including additional parking provision and covered cycle provision and new vehicle and pedestrian access point to facilitate in out access. , Condition No 16: Cycle Racks

    Westwood Junior School, Maple Grove, March, PE15 8JT

    Received 26 Mar 2018
  3. ApproveE/00729/97/CM

    Extraction Of Sand & Gravel To Form Irrigation Reservoir, Incl Formation Of Temp Haul Rd, Erection Of Temp Screening Plant & Weighbridge. The Grid Ref of the site is: TL407 810,

    Land Off Blabys Drove, The Gault, Sutton, Ely, CB6

    Received 15 Sept 1997
  4. ApproveCCC/22/011/NMW

    Non-Material Amendment Application to change the description of Planning Permission C/5001/17/CC to Retention of a 7-bay classroom building for a temporary period.

    Queen Edith Community Primary School , Godwin Way, Cambridge, Cambridgeshire, CB1 8QP

    Received 4 Mar 2022
  5. ApproveF/00009/96/CM

    Construction Of Agric Irrigation Reservoir With Removal From Site Of Aggregates Element Of Excavated Material Incl Surplus Topsoil

    New Hays Farm Sand And Gravel Pit, Ramsey Road, Whittlesey, Peterborough, PE7

    Received 29 Mar 1996
  6. ApproveH/00216/82/CC

    Erection Of 3-Bay Mobile Classroom

    Sawtry Infant And Junior Schools, Middlefield Road, Sawtry, Huntingdon, PE17

    Received 11 May 1982
  7. ApproveS/00394/87/CC

    Provision Of Pitched Roof To Swimming Pool

    Sawston Village College, New Road

    Received 5 Mar 1987
  8. ApproveS/0092/18/CC/C6

    Outline permission for the remaining part of the secondary school comprising 8 forms of entry (1200 pupils); a 3 form of entry primary school (630 pupils); a post 16 education college (400 places), the remaining part of the indoor sports facilities, playing fields, car and cycle parking, landscaping and ancillary development, Full permission for part of a new secondary school comprising 4 forms of entry (600 pupils); a Special Educational Needs School (SEN) (110 pupils); energy centre; car and cycle parking, indoor sports facilities, hard landscaped playing courts, playing fields, access, landscaping and ancillary development, Condition No 32: Visibility Splays - Phase 1

    Northstowe Education Campus, Land Adjacent To Stirling Road, Northstowe New Town, Cambridge, CB24 1BN

    Received 13 Feb 2019
  9. ApproveS/0470/14/CM

    Export of surplus clay from existing stockpile for use in engineering works at other FCC environment landfill site.

    Milton Landfill Site, Butt Lane, Milton, Cambridgeshire, CB24 6DQ

    Received 14 Jun 2014
  10. ApproveS/00951/78/CC

    Erection Of Toilet Block

    Gamlingay Primary School, Green End, Gamlingay

    Received 28 Jun 1978
  11. ApproveC/5000/16/CC/C5

    Demolition of single storey section of the school and replacement with one and two-storey extensions; reconfiguration of car parking area; installation of new cycle parking spaces; widening of footpath at main access road; new landscaping; extension to hardplay area; and associated external works. Condition 19: BREEAM post construction

    St Bedes Inter-church School, Birdwood Road, Cambridge, Cambridgeshire, CB1 3TD

    Received 2 Jul 2019
  12. ApproveH/05005/11/CC

    Erection of 7 bay mobile classroom until 31 August 2016

    Thorndown Infant School, Hill Rise, St Ives, Huntingdon, Cambridgeshire PE27 6SE

    Received 4 Jul 2011
  13. ApproveC/00465/81/CC

    Retention Of Changing Rooms

    Chesterton Community College, Gilbert Road, Cambridge, CB4 3NY

    Received 16 Jun 1981
  14. ApproveE/00143/76/CW

    Improvement To Existing Access To Landfill Site

    Access To Landfill Site, A1421, Haddenham, Ely, Cambridgeshire

    Received 9 Mar 1976
  15. ApproveH/00311/95/CC

    Replacement Of Existing External Swimming Pool With New Enclosed Swimming Pool Incorporating Changing Facilities

    Park Lane Primary School, Park Lane, Godmanchester, Huntingdon, PE188AG

    Received 20 Mar 1995
  16. Application Withdrawn After ValidationS/00026/90/CC

    Retention Of Three 3-Bay Mobile Classrooms And A Mobile Toilet Block

    Hardwick Community Primary School, Limes Road

    Received 12 Jan 1990
  17. ApproveH/00436/00/CC

    Extensions & Alterations To School

    Bushmead Infant School, Bushmead Road, St. Neots, Huntingdon, Cambridgeshire, PE193BT

    Received 23 Mar 2000
  18. ApproveS/01149/95/CC

    Retention Of A 3-Bay Mobile Classroom

    Fen Drayton C.P. School, Cootes Lane

    Received 4 Sept 1995
  19. ApproveF/00000/47/CM

    Gravel Extraction

    Boots Farm Sand And Gravel Pit, Manea Road, Wimblington, March, PE15

    Received 1 Jan 1947
  20. ApproveF/00541/94/CC

    Retention Of A 4-Bay Mobile Classroom

    Adult Training Centre, Marwick Road, March, PE15

    Received 16 Nov 1994
  21. ApproveH/00773/94/CC

    Retention Of A 5-Bay Mobile Classroom

    Alconbury C Of E School, School Lane, Alconbury, Huntingdon, PE175EQ

    Received 13 Jun 1994
  22. ApproveCCC/24/123/DCON

    Application to discharge condition 73 (BREEAM Design Stage - Phase 2) of planning permission S/0092/18/CC

    Northstowe Secondary College (Northstowe Education Campus), Stirling Road, Northstowe, Cambridgeshire, CB24 1DJ

    Received 9 Dec 2024
  23. ApproveS/00695/97/CC

    Erection, Relocation & Retention Of Mobile Units (7 Units)

    Fulbourn C.P. School, School Lane

    Received 15 Jul 1997
  24. ApproveF/02007/11/CC

    Variation of Condition 1 of planning permission F/2018/08/CC to retain the mobile classroom building until 31 August 2016

    Cavalry Primary School, Cavalry Drive, March, PE15 9EQ

    Received 4 May 2011

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Researching a proposal in Cambridgeshire County Council

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Cambridgeshire County Council, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage