England · County council

Cambridgeshire County Council
Planning applications.

Explore collected planning applications and decisions for Cambridgeshire County Council. Search an address, application reference or proposal to find a record.

Collected application statistics

Collected records · All available dates
6,832Searchable applications
46Recorded as pending
97%Approval rate · 6,392 approved or refused records
194Refused applications

6,198 approved · 194 refused · 387 withdrawn. Received dates in our records: 7 Sept 1943 to 3 Sept 2026. Most recent record check: 14 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areasNo boundary records available in this collection
Article 4 direction areasNo boundary records available in this collection

A boundary map is not available for this authority yet. Use council conservation-area and Article 4 guidance above where linked.

Download Article 4 coverage for all authorities (CSV)

Sources: Planning Data conservation areas and Article 4 direction areas. Contains public sector information licensed under the Open Government Licence v3.0.

More application records

  1. ApproveC/01205/06/CC

    Provide new entrance to jnr school & playground, additional car parking facilities including disabled for staff/visitors, additional cycle parking for staff/children, new access paths & external lighting, new safety barrier to segregate pedestrians & vehicles

    Land At, Queen Edith CP School, Godwin Way, Cambridge, CB1

    Received 3 Nov 2006
  2. RefuseCCC/21/070/FUL

    Use of land for recycling inert waste including use of a screener; construction of an earth bund and material storage bays; and the erection of a demountable building (retrospective).

    Beats Lodge, Hooks Drove, Murrow, PE13 4HH

    Received 2 Jun 2021
  3. ApproveF/01639/88/CC

    Formation Of A New Vehicular Access Including The Piping Of A Drain

    Speedwell Farm, Long Drove, Coldham

    Received 12 Nov 1988
  4. ApproveCCC/24/084/NMW

    Non-material amendment affecting condition 3 of planning permission F/2011/18/CW (as amended by F/2011/18/CW/N1 and CCC/21/043/NMW) to allow flexibility in the use of infrastructure area

    Witcham Meadlands Quarry, Block Fen Drove, Mepal, Chatteris, CB6 2AY

    Received 19 Aug 2024
  5. ApproveH/00112/69/CM

    Gravel Extraction

    Adjacent West Of Cow Lane Sand And Gravel Pit, Cow Lane, Godmanchester, Huntingdon, PE18

    Received 16 Dec 1970
  6. ApproveS/02521/89/CC

    Change Of Use Of Shop Unit 1 And First Floor Offices To Social Services Ground Team Offices

    New Shops/Offices Building, Mill Lane/High Street

    Received 8 Dec 1989
  7. ApproveF/02024/02/CC

    New hard play area and convert existing playground to car park.

    Land At Clarkson Infant School, Trafford Road, Wisbech, PE13

    Received 1 Oct 2002
  8. ApproveF/2009/18/CC/C2

    Development of a primary school from 6 class rooms to 2FE (14 class rooms, 420 spaces) including erection of a two storey classroom block, main hall, and single storey extensions to form pre-school with canopies, entrance, linked extension, hard play area, multi-use games area, new pedestrian entrances, reinstatement of car park cycle, scooter provision, relocation of buggy store, landscaping, electrical substation and removal of mobile classroom. Condition No. 25 - BREEAM

    New Road Primary School, New Road, Whittlesey, Peterborough, Cambridgeshire, PE7 1SZ

    Received 10 Apr 2019
  9. ApproveH/00359/93/CW

    Retention And Extension Of Existing Recycling Centre With Skips, Waste Oil Tank And Cabin, And Provision Of New Field Access

    Householders Waste Recycling Centre, Bluntisham Heath Road, Warboys, Huntingdon

    Received 24 Mar 1993
  10. ApproveE/3007/16/CC/C5

    Extensions to the college to provide 3938 sqm of additional floorspace consisting of 22 new classrooms (including music and drama studio), 9 music practice rooms, 3 staff offices, 2 staff preparation rooms, additional changing rooms, widening corridors, erection of a new corridor link, alterations to the existing building including relocation of main school and community entrance with new canopy and covered canopies; relocation and rebuilding of 219 sqm of greenhouse/outbuildings; external alterations to create new access from Lode Road to serve the new staff car and coach park, traffic barriers to car park, formation of bin store, alterations to the external landscape areas, secure fencing and associated infrastructure; and demolition of 386 sqm floorspace to accommodate the new development. , Cond 6: Travel Plan , , Cond 13: BREEAM Design Stage

    Bottisham Village College, Lode Road, Bottisham, Cambridge, CB25 9DL

    Received 28 Nov 2018
  11. ApproveF/00186/92/CC

    Retention Of A 2-Bay Mobile Classroom

    Thomas Eaton Primary School, Church Street, Wimblington, March, PE15

    Received 18 Jun 1992
  12. ApproveH/00076/96/CW

    Glass Cullet Processing Plant

    Old Station House, Station Farm Landfill Site, Brampton Road, St. Neots, Huntingdon, PE18

    Received 15 Jan 1996
  13. ApproveH/01362/87/CC

    Erection Of New County Primary School

    Folksworth C Of E School, Apreece Road, Folksworth, Peterborough, PE7 3TY

    Received 29 Jul 1987
  14. ApproveCCC/25/085/DOR

    Application to Discharge Requirement 08 (part discharge) of the Medworth EfW CHP DCO; Operational Drainage Strategy, Contract Package 3, Work Nos. 1, 1A, 2A and 2B, document reference: CP3_R08_REV_1.0, June 2025

    Medworth Efw Chp Facility, Algores Way, Wisbech, Cambridgeshire

    Received 26 Jun 2025
  15. ApproveC/00718/09/CW

    Erection of an extension to the existing waste recycling building

    Land At Cowley Road Waste Handling Facility, Cowley Road, Cambridge

    Received 12 Aug 2009
  16. ApproveH/01437/94/CC

    Retention Of One 3-Bay Mobile Unit

    Overhills County Primary School, Newtown, Kimbolton, Huntingdon, PE180HY

    Received 7 Nov 1994
  17. ApproveH/5006/15/CC/N1

    Non-material amendment to replace one external door with window on western elevation; replacement of two windows with external doors in the courtyard (northern elevation); and rearrangement to internal layout, to application H/5006/15/CC (Demolition of fire damaged part of the building and erection of 126sqm extension to the existing education building, external alterations to the existing building, car park alterations and associated works.)

    Former Huntingdonshire Regional College, Almond Road, St. Neots, PE19 1EA

    Received 5 Mar 2016
  18. ApproveS/00036/06/CM

    Extension of quarry for the extraction of chalk, and restoration to chalk grassland and woodland to enhance biodiversity

    Land At, Station Quarry, Station Road, Steeple Morden, Royston, SG8

    Received 29 Dec 2005
  19. ApproveS/0099/18/CC

    Section 73 planning application to expand the existing 360 place junior school, to include a two storey extension, two single storey extensions, 3 canopies to the reception area classrooms, additional car parking, cycle and scooter parking, and the creation of an artificial sports pitch to enable it to expand to a 630 place primary school with amended wording to Condition 24 (Station Road Footpath Widening), to allow footpath widening to be completed by 31st October 2019 of planning permission S/0243/17/CC.

    Histon And Impington Junior School, The Green, Histon, Cambridge, CB24 9JA

    Received 13 Sept 2018
  20. ApproveCCC/22/085/NMA

    Non-material amendment to planning permission no. F/2001/18/CW to change the description of the development to Construction and operation of an anaerobic digestion plant with access from Whittlesey Road

    West Fen Farm , Whitemoor Road, March, Cambridgeshire, PE15 0AF

    Received 20 Jul 2022
  21. RefuseF/2000/16/CW

    Application with Peterborough City Council ref 16/00080/MMFUL. Erection of Gas and Grid Anerobic Digestion Plant to comprise four digester tanks, technical operations building, sileage clamp, storage lagoons, four liquid waste tanks, Gas Flare, Gas Upgrading System (GUS) and Gas Entry UNit (GEU), seperator, cooling unit, transformer, heating kiosk and two underground propane tanks.

    Land Adjacent To Horsey Toll Farm, Whittlesey Road, Stanground, Peterborough, PE7 2PP

    Received 15 Jan 2016
  22. ApproveE/03007/07/CC

    New timber bridge over lode, earth ramp adjacent lode bank, foot and cycle path across field south of lode

    Land At South East Of Slade's Farm, Swaffham Prior Fen, Swaffham Prior, CB5

    Received 30 May 2007
  23. ApproveE/00688/00/CC

    New extension to provide technology, textiles and food rooms and ancillaries. Alterations to existing classrooms

    City Of Ely Community College, Downham Road, Ely, Cambridgeshire, CB6 2SH

    Received 29 Jun 2000
  24. ApproveE/03016/06/CC

    Extension canopy and external work regrading bank

    Land At, Cheveley Primary School, High Stret, Cheveley

    Received 24 Oct 2006

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Researching a proposal in Cambridgeshire County Council

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Cambridgeshire County Council, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage