Council planning record

Section 73 planning application to develop land without complying with conditions 1D, 3, 38, 39, 42, 43, 44, 44A, 46, 48, 49, 55, and 56A of planning permission reference S/02279/11/CW & S/02575/12/CW for an extension to the operational life of Area D of the existing landfill area from 31 December 2015 to 31 December 2036 for the landfilling of non hazardous waste; and to not fill Area E1 (Gravel Diggers) of the landfill with non hazardous waste and to restore that area instead to a lower level with onsite sourced clay material (by 31 December 2019); with the continued use of the Waterbeach Waste Management Park as set out in planning permission reference S/01587/99/CW.

Waterbeach Waste Management Park, Ely Road, Waterbeach, CB25 9PG

ApproveReference: S/0013/15/CWCambridgeshire County Council

Last published check: 22 Sept 2026, 00:44. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Valid Date

    Published milestoneCouncil source
  2. Application Received Date

    Published milestoneCouncil source
  3. Decision Date

    Published milestoneCouncil source

Application summary

Status
Approve
Application type
Full application
Received
2 Dec 2015
Validated
1 Dec 2015
Determination deadline
Not published
Local authority
Cambridgeshire County Council

Application overview

Section 73 planning application to develop land without complying with conditions 1D, 3, 38, 39, 42, 43, 44, 44A, 46, 48, 49, 55, and 56A of planning permission reference S/02279/11/CW & S/02575/12/CW for an extension to the operational life of Area D of the existing landfill area from 31 December 2015 to 31 December 2036 for the landfilling of non hazardous waste; and to not fill Area E1 (Gravel Diggers) of the landfill with non hazardous waste and to restore that area instead to a lower level with onsite sourced clay material (by 31 December 2019); with the continued use of the Waterbeach Waste Management Park as set out in planning permission reference S/01587/99/CW.

Proposal details

Reference
S/0013/15/CW
Parish
Cottenham
Agent
Mr David Adams, Axis Ped

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Waterbeach Waste Management Park, Ely Road, Waterbeach, CB25 9PG

This record has no verified map location.

Documents 120 of 120

DocumentPublishedAction
Decision letter Con 58Decision15 May 2017View
Submission letter Con 58Decision15 May 2017View
from Agent confirming C1 implement date of 11.4.16Decision20 Apr 2016View
Decision NoticeDecision14 Apr 2016View
Final Landscaping Restoration PlanApplication submission18 Mar 2016View
Environmental Statement Section 11(1999)Application submission7 Dec 2015View
Environmental Statement 2012 Section 3Application submission7 Dec 2015View
Environmental Impact Statement Section 4 (1999)Application submission7 Dec 2015View
Figure 4.1Location of non hazardous siteApplication submission7 Dec 2015View
Environmental Statement 2012 Section 7Application submission7 Dec 2015View
Environmental Statement 2012 Section 11Application submission7 Dec 2015View
Appendix 7.4 Area D photosApplication submission7 Dec 2015View
Appendix 7.14 Biodiversity ChecklistApplication submission7 Dec 2015View
Appendix 7.13 Ecological Management PlanApplication submission7 Dec 2015View
Environmental Impact Statement section 6Application submission7 Dec 2015View
Appendix 7.6 Area E1 PhotosApplication submission7 Dec 2015View
Appendix 5.3-PIA Search AreaApplication submission7 Dec 2015View
Appendix 1.5 Planning Permission S/026101/12/CMApplication submission7 Dec 2015View
Soil Movements Phase 6Application submission7 Dec 2015View
Soil Movements Phase 2Application submission7 Dec 2015View
Site sectionsApplication submission7 Dec 2015View
Non Technical Summary (1 of 2)Application submission7 Dec 2015View
Figure 9.3 Discharge ConsentsApplication submission7 Dec 2015View
Environmental Statement Section 8 (1999)Application submission7 Dec 2015View
Environmental Statement 2012 Section 9Application submission7 Dec 2015View
Figure 9.2 Surface Water FeaturesApplication submission7 Dec 2015View
Figure 8.1 Receptor LocationsApplication submission7 Dec 2015View
Figure 7.2 Area D Pond locationsApplication submission7 Dec 2015View
Final Planning Statement Part 2 to 4Application submission7 Dec 2015View
Figure 9.1Site settingApplication submission7 Dec 2015View
Figure 2.1 Site Location and ContextApplication submission7 Dec 2015View
Environmental Statement Section 7 (2 of 2)(1999)Application submission7 Dec 2015View
Environmental Statement Section 7 (1 of 2)(1999)Application submission7 Dec 2015View
Environmental Statement Section 10 (1999)Application submission7 Dec 2015View
Environmental Statement 2012 Section 5Application submission7 Dec 2015View
Figure 4.2 Major Development AreasApplication submission7 Dec 2015View
Environmental Impact StatementApplication submission7 Dec 2015View
Area D cell 13 designApplication submission7 Dec 2015View
Appendix 7.8 Great Crested Newt BackgroundApplication submission7 Dec 2015View
Soil Movements Phase 4Application submission7 Dec 2015View
Figure 7.5 Area D Phase 1 SurveyApplication submission7 Dec 2015View
Figure 6.2a Viewpoints Sheet 1Application submission7 Dec 2015View
Figure 5.1 to 5.14-2012 Surveyed Traffic FlowsApplication submission7 Dec 2015View
Figure 1.2 Site AreasApplication submission7 Dec 2015View
Environmental Statement Section 9 (1 of 2) (1999)Application submission7 Dec 2015View
Environmental Statement reportApplication submission7 Dec 2015View
Environmental Statement 2012 Section 13Application submission7 Dec 2015View
Area D Cross section AApplication submission7 Dec 2015View
Area D cell 17 designApplication submission7 Dec 2015View
Area D cell 15 designApplication submission7 Dec 2015View
Soil Movements Phase 1Application submission7 Dec 2015View
Site sectionApplication submission7 Dec 2015View
Odour Management Plan Part 7Application submission7 Dec 2015View
Figure 9.5 Surface and Ground Water MonitoringApplication submission7 Dec 2015View
Figure 9.4 GeologyApplication submission7 Dec 2015View
Figure 7.4 Bat LocationsApplication submission7 Dec 2015View
Figure 7.3 Area D Water Vole AreasApplication submission7 Dec 2015View
Area D base cell designApplication submission7 Dec 2015View
Superseded Landscape Restoration PlanApplication submission7 Dec 2015View
Statement of Community Involvement Part 6Application submission7 Dec 2015View
Soil Movements Phase 5Application submission7 Dec 2015View
Non Technical Statement 2015.12.03 FinalApplication submission7 Dec 2015View
Non Technical Statement 2012Application submission7 Dec 2015View
Figure 9.6 Surface Water ManagementApplication submission7 Dec 2015View
Figure 7.6 Area E1 Phase 1 SurveyApplication submission7 Dec 2015View
Figure 7.1 Designated SitesApplication submission7 Dec 2015View
Figure 1.1 Site LocationApplication submission7 Dec 2015View
Environmental Statement Section 9 (2 of 2) (1999)Application submission7 Dec 2015View
Environmental Statement 2012 Section 8Application submission7 Dec 2015View
Environmental Statement 2012 Section 14Application submission7 Dec 2015View
Environmental Impact Statement Section 3 (1999)Application submission7 Dec 2015View
Area D cell 14 designApplication submission7 Dec 2015View
Appendix 7.5 Area E1 Plant species listApplication submission7 Dec 2015View
Appendix 7.3 Area D Plant species listApplication submission7 Dec 2015View
Appendix 1.7-Scoping opinionApplication submission7 Dec 2015View
Statutory planApplication submission7 Dec 2015View
Soil Movements Phase 3Application submission7 Dec 2015View
Figure 6.2b Viewpoints Sheet 2Application submission7 Dec 2015View
Figure 6.1 Viewpoints LocationsApplication submission7 Dec 2015View
Area D Cross section BApplication submission7 Dec 2015View
Application FormApplication submission7 Dec 2015View
Appendix 8.1 Noise TerminologyApplication submission7 Dec 2015View
Appendix 7.2 Protected and Priority Species RecordsApplication submission7 Dec 2015View
Appendix 7.11 Bat Detector SurveyApplication submission7 Dec 2015View
Appendix 7.1 Designated Statutory Site CitationApplication submission7 Dec 2015View
Appendix 7.7a Biological Monitoring JUNE 2015Application submission7 Dec 2015View
Appendix 7.10-Water vole surveyApplication submission7 Dec 2015View
Appendix 6.1-After care SchemeApplication submission7 Dec 2015View
Environmental Statement 2012 Section 4Application submission7 Dec 2015View
Environmental Statement 2012 Section 12Application submission7 Dec 2015View
Area D cell 16 designApplication submission7 Dec 2015View
Appendix 7.9 Winter Bird SurveyApplication submission7 Dec 2015View
Appendix 7.7b Biological Monitoring OCTOBER 2015Application submission7 Dec 2015View
Appendix 7.12 5 year after care scheme, Wetland Habitat (Area G*)Application submission7 Dec 2015View
Appendix 5.2-Traffic Count data-NTM Growth factorsApplication submission7 Dec 2015View
Appendix 1.4 Planning Permission S/00279/1/CW and S/025751/12/CWApplication submission7 Dec 2015View
Phasing drawingApplication submission7 Dec 2015View
Non Technical Summary (2 of 2)Application submission7 Dec 2015View
Figure 2.1 Area D Topographical SurveyApplication submission7 Dec 2015View
Environmental Statement 2012 Section 6Application submission7 Dec 2015View
Environmental Statement 2012 Section 2Application submission7 Dec 2015View
Environmental Statement 2012 Section 10Application submission7 Dec 2015View
Environmental Impact Statement Section 6 (2 of 2) (1999)Application submission7 Dec 2015View
Environmental Impact Statement Section 2 (1999)Application submission7 Dec 2015View
Environmental Impact Statement Document E (1999)Application submission7 Dec 2015View
Attachment SummaryApplication submission7 Dec 2015View
Area D Profile PlanApplication submission7 Dec 2015View
Appendix 5.1-Gravel Diggers transport AssessmentApplication submission7 Dec 2015View
Appendix 1.6 Waterbeach Landfill Environmental Scoping ReportApplication submission7 Dec 2015View
Appendix 1.6 Planning Permission Scoping OpinionApplication submission7 Dec 2015View
Appendix 1.3 Planning Permission S/01587/99Application submission7 Dec 2015View
from South Cambridgeshire DCConsultee comment3 Feb 2016View
from Old West Internal Drainage BoardConsultee comment25 Jan 2016View
from Wildlife OfficerConsultee comment4 Jan 2016View
from Cottenham Parish CouncilConsultee comment24 Dec 2015View
from Old West Internal Drainage BoardConsultee comment23 Dec 2015View
From flood and water team Julia BeedenConsultee comment22 Dec 2015View
from Natural EnglandConsultee comment22 Dec 2015View
from Waterbeach Parish CouncilConsultee comment17 Dec 2015View
from Environment AgencyConsultee comment16 Dec 2015View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Approve
Decision letter Con 58 Submission letter Con 58 from Agent confirming C1 implement date of 11.4.16 Decision Notice
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

No related records were published in this section.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.