Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Waterbeach Waste Management Park, Ely Road, Waterbeach, CB25 9PG
Last published check: 22 Sept 2026, 00:44. Check the council record for more recent changes.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
Section 73 planning application to develop land without complying with conditions 1D, 3, 38, 39, 42, 43, 44, 44A, 46, 48, 49, 55, and 56A of planning permission reference S/02279/11/CW & S/02575/12/CW for an extension to the operational life of Area D of the existing landfill area from 31 December 2015 to 31 December 2036 for the landfilling of non hazardous waste; and to not fill Area E1 (Gravel Diggers) of the landfill with non hazardous waste and to restore that area instead to a lower level with onsite sourced clay material (by 31 December 2019); with the continued use of the Waterbeach Waste Management Park as set out in planning permission reference S/01587/99/CW.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsWaterbeach Waste Management Park, Ely Road, Waterbeach, CB25 9PG
This record has no verified map location.
| Document | Published | Action |
|---|---|---|
| Decision letter Con 58Decision | 15 May 2017 | View |
| Submission letter Con 58Decision | 15 May 2017 | View |
| from Agent confirming C1 implement date of 11.4.16Decision | 20 Apr 2016 | View |
| Decision NoticeDecision | 14 Apr 2016 | View |
| Final Landscaping Restoration PlanApplication submission | 18 Mar 2016 | View |
| Environmental Statement Section 11(1999)Application submission | 7 Dec 2015 | View |
| Environmental Statement 2012 Section 3Application submission | 7 Dec 2015 | View |
| Environmental Impact Statement Section 4 (1999)Application submission | 7 Dec 2015 | View |
| Figure 4.1Location of non hazardous siteApplication submission | 7 Dec 2015 | View |
| Environmental Statement 2012 Section 7Application submission | 7 Dec 2015 | View |
| Environmental Statement 2012 Section 11Application submission | 7 Dec 2015 | View |
| Appendix 7.4 Area D photosApplication submission | 7 Dec 2015 | View |
| Appendix 7.14 Biodiversity ChecklistApplication submission | 7 Dec 2015 | View |
| Appendix 7.13 Ecological Management PlanApplication submission | 7 Dec 2015 | View |
| Environmental Impact Statement section 6Application submission | 7 Dec 2015 | View |
| Appendix 7.6 Area E1 PhotosApplication submission | 7 Dec 2015 | View |
| Appendix 5.3-PIA Search AreaApplication submission | 7 Dec 2015 | View |
| Appendix 1.5 Planning Permission S/026101/12/CMApplication submission | 7 Dec 2015 | View |
| Soil Movements Phase 6Application submission | 7 Dec 2015 | View |
| Soil Movements Phase 2Application submission | 7 Dec 2015 | View |
| Site sectionsApplication submission | 7 Dec 2015 | View |
| Non Technical Summary (1 of 2)Application submission | 7 Dec 2015 | View |
| Figure 9.3 Discharge ConsentsApplication submission | 7 Dec 2015 | View |
| Environmental Statement Section 8 (1999)Application submission | 7 Dec 2015 | View |
| Environmental Statement 2012 Section 9Application submission | 7 Dec 2015 | View |
| Figure 9.2 Surface Water FeaturesApplication submission | 7 Dec 2015 | View |
| Figure 8.1 Receptor LocationsApplication submission | 7 Dec 2015 | View |
| Figure 7.2 Area D Pond locationsApplication submission | 7 Dec 2015 | View |
| Final Planning Statement Part 2 to 4Application submission | 7 Dec 2015 | View |
| Figure 9.1Site settingApplication submission | 7 Dec 2015 | View |
| Figure 2.1 Site Location and ContextApplication submission | 7 Dec 2015 | View |
| Environmental Statement Section 7 (2 of 2)(1999)Application submission | 7 Dec 2015 | View |
| Environmental Statement Section 7 (1 of 2)(1999)Application submission | 7 Dec 2015 | View |
| Environmental Statement Section 10 (1999)Application submission | 7 Dec 2015 | View |
| Environmental Statement 2012 Section 5Application submission | 7 Dec 2015 | View |
| Figure 4.2 Major Development AreasApplication submission | 7 Dec 2015 | View |
| Environmental Impact StatementApplication submission | 7 Dec 2015 | View |
| Area D cell 13 designApplication submission | 7 Dec 2015 | View |
| Appendix 7.8 Great Crested Newt BackgroundApplication submission | 7 Dec 2015 | View |
| Soil Movements Phase 4Application submission | 7 Dec 2015 | View |
| Figure 7.5 Area D Phase 1 SurveyApplication submission | 7 Dec 2015 | View |
| Figure 6.2a Viewpoints Sheet 1Application submission | 7 Dec 2015 | View |
| Figure 5.1 to 5.14-2012 Surveyed Traffic FlowsApplication submission | 7 Dec 2015 | View |
| Figure 1.2 Site AreasApplication submission | 7 Dec 2015 | View |
| Environmental Statement Section 9 (1 of 2) (1999)Application submission | 7 Dec 2015 | View |
| Environmental Statement reportApplication submission | 7 Dec 2015 | View |
| Environmental Statement 2012 Section 13Application submission | 7 Dec 2015 | View |
| Area D Cross section AApplication submission | 7 Dec 2015 | View |
| Area D cell 17 designApplication submission | 7 Dec 2015 | View |
| Area D cell 15 designApplication submission | 7 Dec 2015 | View |
| Soil Movements Phase 1Application submission | 7 Dec 2015 | View |
| Site sectionApplication submission | 7 Dec 2015 | View |
| Odour Management Plan Part 7Application submission | 7 Dec 2015 | View |
| Figure 9.5 Surface and Ground Water MonitoringApplication submission | 7 Dec 2015 | View |
| Figure 9.4 GeologyApplication submission | 7 Dec 2015 | View |
| Figure 7.4 Bat LocationsApplication submission | 7 Dec 2015 | View |
| Figure 7.3 Area D Water Vole AreasApplication submission | 7 Dec 2015 | View |
| Area D base cell designApplication submission | 7 Dec 2015 | View |
| Superseded Landscape Restoration PlanApplication submission | 7 Dec 2015 | View |
| Statement of Community Involvement Part 6Application submission | 7 Dec 2015 | View |
| Soil Movements Phase 5Application submission | 7 Dec 2015 | View |
| Non Technical Statement 2015.12.03 FinalApplication submission | 7 Dec 2015 | View |
| Non Technical Statement 2012Application submission | 7 Dec 2015 | View |
| Figure 9.6 Surface Water ManagementApplication submission | 7 Dec 2015 | View |
| Figure 7.6 Area E1 Phase 1 SurveyApplication submission | 7 Dec 2015 | View |
| Figure 7.1 Designated SitesApplication submission | 7 Dec 2015 | View |
| Figure 1.1 Site LocationApplication submission | 7 Dec 2015 | View |
| Environmental Statement Section 9 (2 of 2) (1999)Application submission | 7 Dec 2015 | View |
| Environmental Statement 2012 Section 8Application submission | 7 Dec 2015 | View |
| Environmental Statement 2012 Section 14Application submission | 7 Dec 2015 | View |
| Environmental Impact Statement Section 3 (1999)Application submission | 7 Dec 2015 | View |
| Area D cell 14 designApplication submission | 7 Dec 2015 | View |
| Appendix 7.5 Area E1 Plant species listApplication submission | 7 Dec 2015 | View |
| Appendix 7.3 Area D Plant species listApplication submission | 7 Dec 2015 | View |
| Appendix 1.7-Scoping opinionApplication submission | 7 Dec 2015 | View |
| Statutory planApplication submission | 7 Dec 2015 | View |
| Soil Movements Phase 3Application submission | 7 Dec 2015 | View |
| Figure 6.2b Viewpoints Sheet 2Application submission | 7 Dec 2015 | View |
| Figure 6.1 Viewpoints LocationsApplication submission | 7 Dec 2015 | View |
| Area D Cross section BApplication submission | 7 Dec 2015 | View |
| Application FormApplication submission | 7 Dec 2015 | View |
| Appendix 8.1 Noise TerminologyApplication submission | 7 Dec 2015 | View |
| Appendix 7.2 Protected and Priority Species RecordsApplication submission | 7 Dec 2015 | View |
| Appendix 7.11 Bat Detector SurveyApplication submission | 7 Dec 2015 | View |
| Appendix 7.1 Designated Statutory Site CitationApplication submission | 7 Dec 2015 | View |
| Appendix 7.7a Biological Monitoring JUNE 2015Application submission | 7 Dec 2015 | View |
| Appendix 7.10-Water vole surveyApplication submission | 7 Dec 2015 | View |
| Appendix 6.1-After care SchemeApplication submission | 7 Dec 2015 | View |
| Environmental Statement 2012 Section 4Application submission | 7 Dec 2015 | View |
| Environmental Statement 2012 Section 12Application submission | 7 Dec 2015 | View |
| Area D cell 16 designApplication submission | 7 Dec 2015 | View |
| Appendix 7.9 Winter Bird SurveyApplication submission | 7 Dec 2015 | View |
| Appendix 7.7b Biological Monitoring OCTOBER 2015Application submission | 7 Dec 2015 | View |
| Appendix 7.12 5 year after care scheme, Wetland Habitat (Area G*)Application submission | 7 Dec 2015 | View |
| Appendix 5.2-Traffic Count data-NTM Growth factorsApplication submission | 7 Dec 2015 | View |
| Appendix 1.4 Planning Permission S/00279/1/CW and S/025751/12/CWApplication submission | 7 Dec 2015 | View |
| Phasing drawingApplication submission | 7 Dec 2015 | View |
| Non Technical Summary (2 of 2)Application submission | 7 Dec 2015 | View |
| Figure 2.1 Area D Topographical SurveyApplication submission | 7 Dec 2015 | View |
| Environmental Statement 2012 Section 6Application submission | 7 Dec 2015 | View |
| Environmental Statement 2012 Section 2Application submission | 7 Dec 2015 | View |
| Environmental Statement 2012 Section 10Application submission | 7 Dec 2015 | View |
| Environmental Impact Statement Section 6 (2 of 2) (1999)Application submission | 7 Dec 2015 | View |
| Environmental Impact Statement Section 2 (1999)Application submission | 7 Dec 2015 | View |
| Environmental Impact Statement Document E (1999)Application submission | 7 Dec 2015 | View |
| Attachment SummaryApplication submission | 7 Dec 2015 | View |
| Area D Profile PlanApplication submission | 7 Dec 2015 | View |
| Appendix 5.1-Gravel Diggers transport AssessmentApplication submission | 7 Dec 2015 | View |
| Appendix 1.6 Waterbeach Landfill Environmental Scoping ReportApplication submission | 7 Dec 2015 | View |
| Appendix 1.6 Planning Permission Scoping OpinionApplication submission | 7 Dec 2015 | View |
| Appendix 1.3 Planning Permission S/01587/99Application submission | 7 Dec 2015 | View |
| from South Cambridgeshire DCConsultee comment | 3 Feb 2016 | View |
| from Old West Internal Drainage BoardConsultee comment | 25 Jan 2016 | View |
| from Wildlife OfficerConsultee comment | 4 Jan 2016 | View |
| from Cottenham Parish CouncilConsultee comment | 24 Dec 2015 | View |
| from Old West Internal Drainage BoardConsultee comment | 23 Dec 2015 | View |
| From flood and water team Julia BeedenConsultee comment | 22 Dec 2015 | View |
| from Natural EnglandConsultee comment | 22 Dec 2015 | View |
| from Waterbeach Parish CouncilConsultee comment | 17 Dec 2015 | View |
| from Environment AgencyConsultee comment | 16 Dec 2015 | View |
Documents open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
No related records were published in this section.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.