Continuation of landfill of inert waste and stable non-reactive hazardous waste, soil washing and mineral processing within the existing site until 31 December 2031. Retention of 2 no. weighbridges and 14 metre x 8 metre site office building. Extraction of clay. Erection of 50 metre x 50 metre building for recycling tyres, 50 metre x 50 metre building for recycling plasterboard, 40 metre x 20 metre building for bagging aggregate, 3 no. 14 metre x 8 metre buildings to serve as office, site laboratory and welfare unit and 6 no. temporary buildings ancillary to the clay extraction operations. Installation of concrete surface and its use for treating liquid waste; bio-remediation of waste; aggregate storage and recycling; storing vehicles and machinery; and ancillary parking for cars and lorries. Alteration of internal haul road. Storage of topsoil and subsoil. Formation of silt settlement ponds.
Continuation of landfill of inert waste and stable non-reactive hazardous waste, soil washing and mineral processing within the existing site until 31 December 2031. Retention of 2 no. weighbridges and 14 metre x 8 metre site office building. Extraction of clay. Erection of 50 metre x 50 metre building for recycling tyres, 50 metre x 50 metre building for recycling plasterboard, 40 metre x 20 metre building for bagging aggregate, 3 no. 14 metre x 8 metre buildings to serve as office, site laboratory and welfare unit and 6 no. temporary buildings ancillary to the clay extraction operations. Installation of concrete surface and its use for treating liquid waste; bio-remediation of waste; aggregate storage and recycling; storing vehicles and machinery; and ancillary parking for cars and lorries. Alteration of internal haul road. Storage of topsoil and subsoil. Formation of silt settlement ponds.
Reference
F/2000/17/CW
Parish
Manea
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.