Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Land To The South Of Ely Between Angel Drove & Stuntney Causeway
Last published check: 22 Sept 2026, 09:14. Check the council record for more recent changes.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A142 Ely Southern Bypass, linking Angel Drove with Stuntney Causeway: construction of 1.7km long single carriageway road between 2 new roundabouts, including crossings of the Cambridge to Ely railway line and River Gt Ouse. Associated works to include earthworks, planting, drainage, minor road structures, lighting, signage, pedestrian & cycle provision and temporary construction compounds and are inclusive of works to the bypassed A142.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsLand To The South Of Ely Between Angel Drove & Stuntney Causeway
This record has no verified map location.
| Document | Published | Action |
|---|---|---|
| Decision noticeDecision | 13 Oct 2014 | View |
| Environmental MasterplanApplication submission | 29 Aug 2014 | View |
| Cross Sections - Scheme Landscape Proposals - Sheet 2 of 2Application submission | 29 Aug 2014 | View |
| Cross Sections - Scheme Landscape Proposals Sheet 1 of 2Application submission | 29 Aug 2014 | View |
| Sustainability Appraisal - FINALApplication submission | 19 Aug 2014 | View |
| Statement of Community & Stakeholder InvolvementApplication submission | 19 Aug 2014 | View |
| Application FormApplication submission | 19 Aug 2014 | View |
| Transport Assessment - FINALApplication submission | 19 Aug 2014 | View |
| Preliminary Underpass Traffic CalmingApplication submission | 19 Aug 2014 | View |
| Design & Access Statement (Final)Application submission | 19 Aug 2014 | View |
| LA dev letterApplication submission | 19 Aug 2014 | View |
| Flood Risk Assessment FINALApplication submission | 19 Aug 2014 | View |
| Planning Statement - FINALApplication submission | 19 Aug 2014 | View |
| ES Vol 2 - FinalApplication submission | 19 Aug 2014 | View |
| ES Vol 1 NTS - FinalApplication submission | 19 Aug 2014 | View |
| Applicant covering letterApplication submission | 19 Aug 2014 | View |
| from Ely Crossing ActionApplication submission | 5 Aug 2014 | View |
| Planning Statement Addendum July 2014Application submission | 7 Jul 2014 | View |
| Applicant letter 4 July 2014Application submission | 7 Jul 2014 | View |
| Environmental Statement Addendum July 2014Application submission | 7 Jul 2014 | View |
| Visual impact assessmentApplication submission | 8 May 2014 | View |
| Planning StatementApplication submission | 28 Feb 2014 | View |
| ECDC Planning Committee ReportApplication submission | 27 Feb 2014 | View |
| from English Heritage - Review of Addendum 2Application submission | 27 Feb 2014 | View |
| Addendum 1 Landscaping summaryApplication submission | 23 Jan 2014 | View |
| Addendum 3 Winter bird survey planApplication submission | 23 Jan 2014 | View |
| Addendum 2 Transport assessment and Highway designApplication submission | 23 Jan 2014 | View |
| Addendum 4 Preliminary sources study reportApplication submission | 23 Jan 2014 | View |
| Addendum 4 Enviro check reportApplication submission | 23 Jan 2014 | View |
| Addendum 4 Groundwater protection summaryApplication submission | 23 Jan 2014 | View |
| Addendum 4 Ground investigation reportApplication submission | 23 Jan 2014 | View |
| Addendum 1 Zone of visual influence fig 10 - 9 revBApplication submission | 23 Jan 2014 | View |
| Addendum 1 Tree protectionApplication submission | 23 Jan 2014 | View |
| Addendum 3 Ecology summaryApplication submission | 23 Jan 2014 | View |
| Addendum 3 Great crested newts surveyApplication submission | 23 Jan 2014 | View |
| Addendum 3 Breeding bird survey planApplication submission | 23 Jan 2014 | View |
| Addendum 3 Bat surveyApplication submission | 23 Jan 2014 | View |
| Protected species resultsApplication submission | 21 Nov 2013 | View |
| Photomontage viewpoint 4 existing view and summer view 2030 sheet 8Application submission | 21 Nov 2013 | View |
| Photomontage viewpoint 1 existing view and summer view 2030 sheet 2Application submission | 21 Nov 2013 | View |
| Photomontage methodologyApplication submission | 21 Nov 2013 | View |
| Option assessment reportApplication submission | 21 Nov 2013 | View |
| NVC frequency tablesApplication submission | 21 Nov 2013 | View |
| Land contamination Construction and operation impact assessment tablesApplication submission | 21 Nov 2013 | View |
| Land contamination construction and operation CSM tablesApplication submission | 21 Nov 2013 | View |
| Front sheet option assessment report addendum 3.2Application submission | 21 Nov 2013 | View |
| Fig 4.1 Lighting Contours- Angel Drove RAApplication submission | 21 Nov 2013 | View |
| Fig 11.4 Bat Activity SurveysApplication submission | 21 Nov 2013 | View |
| Fig 10.21 Photographs 1-4Application submission | 21 Nov 2013 | View |
| Fig 10.15 Panoramic Viewpoints P1-2Application submission | 21 Nov 2013 | View |
| Fig 10.13 Year 2030 Summer Visual Impact ResidentialApplication submission | 21 Nov 2013 | View |
| Environmental masterplanApplication submission | 21 Nov 2013 | View |
| Elements of the setting of Ely and CathedralApplication submission | 21 Nov 2013 | View |
| Tree protection plan sheet 1Application submission | 21 Nov 2013 | View |
| Photomontage viewpoint 5 existing view and winter view 2015 sheet 9Application submission | 21 Nov 2013 | View |
| Photomontage viewpoint 4 existing view and winter view 2015 aheet 7Application submission | 21 Nov 2013 | View |
| Noise difference do minimum opening year vs with scheme design yearApplication submission | 21 Nov 2013 | View |
| Landscape, townscape and visual assessment schedulesApplication submission | 21 Nov 2013 | View |
| Fig 13.1 Exploratory Hole Location PlanApplication submission | 21 Nov 2013 | View |
| Fig 10.19 Panoramic Viewpoints P9Application submission | 21 Nov 2013 | View |
| Fig 10.17 Panoramic Viewpoints P5-6Application submission | 21 Nov 2013 | View |
| Designated assets showing the location of the schemeApplication submission | 21 Nov 2013 | View |
| Cross sections - scheme landscape proposals sheet 1Application submission | 21 Nov 2013 | View |
| Archaeological desk-based assessment App 9.2Application submission | 21 Nov 2013 | View |
| Fig 7.3 2011 Background No2 Concentrations at modlled gridApplication submission | 21 Nov 2013 | View |
| Fig 7.2 Location of Discrete Receptors Included In ModelApplication submission | 21 Nov 2013 | View |
| Fig 11.2 Phase 1 Habitat MapApplication submission | 21 Nov 2013 | View |
| Fig 11.1 Protected Species & Designated SitesApplication submission | 21 Nov 2013 | View |
| Fig 10.5 Landscape ConstraintsApplication submission | 21 Nov 2013 | View |
| Fig 10.4 Townscape CharacterApplication submission | 21 Nov 2013 | View |
| Fig 10.16 Panoramic Viewpoints P3-4Application submission | 21 Nov 2013 | View |
| Existing ground contoursApplication submission | 21 Nov 2013 | View |
| Drawing showing representative receptor locationsApplication submission | 21 Nov 2013 | View |
| Architectural bridge drawingsApplication submission | 21 Nov 2013 | View |
| Air QualityApplication submission | 21 Nov 2013 | View |
| Tree protection plan sheet 7Application submission | 21 Nov 2013 | View |
| Tree protection plan sheet 6Application submission | 21 Nov 2013 | View |
| Photomontage viewpoint 3 existing view and summer view 2015 sheet 5Application submission | 21 Nov 2013 | View |
| Land contamination problems and consequencesApplication submission | 21 Nov 2013 | View |
| Heritage viewsApplication submission | 21 Nov 2013 | View |
| Fig 8.11 Noise difference do minimum 2015 vs do something 2015Application submission | 21 Nov 2013 | View |
| Fig 7.1 Air Quality Constraints MapApplication submission | 21 Nov 2013 | View |
| Fig 10.6 Environmental MasterplanApplication submission | 21 Nov 2013 | View |
| Fig 10.3 Local Landscape CharacterApplication submission | 21 Nov 2013 | View |
| Fig 10.23 Photographs 9-13Application submission | 21 Nov 2013 | View |
| Fig 10.20 Night time Panoramic Viewpoint P10Application submission | 21 Nov 2013 | View |
| Ely Setting studyApplication submission | 21 Nov 2013 | View |
| Drainage and fencingApplication submission | 21 Nov 2013 | View |
| Ely setting study front sheet app 9.1Application submission | 21 Nov 2013 | View |
| Ely capacity study quintessential & long distance viewApplication submission | 21 Nov 2013 | View |
| Biodiversity and landscaping management planApplication submission | 21 Nov 2013 | View |
| Assessment methods and significance criteriaApplication submission | 21 Nov 2013 | View |
| Arboricultural development reportApplication submission | 21 Nov 2013 | View |
| Volume 3A cover page and contents A3 landscapeApplication submission | 21 Nov 2013 | View |
| Tree protection plan sheet 4Application submission | 21 Nov 2013 | View |
| Photomontage viewpoint 1 existing view and summer view 2030 sheet 2Application submission | 21 Nov 2013 | View |
| Photomontage viewpoint 2 existing view and summer view 2015 sheet 3Application submission | 21 Nov 2013 | View |
| Photo Montage- View point 1 Existing View and Summer View 2015 sheet 1 of 12Application submission | 21 Nov 2013 | View |
| Habitat survey resultsApplication submission | 21 Nov 2013 | View |
| Fig 8.1 Noise contour map do minimum opening yearApplication submission | 21 Nov 2013 | View |
| Fig 7.9 Indicative dist&sensitive receptors for const.site boundaryApplication submission | 21 Nov 2013 | View |
| Fig 11.5 Barn owl SurveysApplication submission | 21 Nov 2013 | View |
| Environmental masterplan - Environmental statement chapter 10Application submission | 21 Nov 2013 | View |
| Environmental driversApplication submission | 21 Nov 2013 | View |
| Bypass long and cross sectionApplication submission | 21 Nov 2013 | View |
| Tree survey front sheetApplication submission | 21 Nov 2013 | View |
| Tree protection plan sheet 5Application submission | 21 Nov 2013 | View |
| Tree protection plan sheet 2Application submission | 21 Nov 2013 | View |
| Site access and compoundsApplication submission | 21 Nov 2013 | View |
| Photomontage viewpoint location planApplication submission | 21 Nov 2013 | View |
| Photomontage viewpoint 6 existing view and summer viw 2030 sheet 12Application submission | 21 Nov 2013 | View |
| Noise contour maps do something 2031Application submission | 21 Nov 2013 | View |
| Noise contour maps do something 2015Application submission | 21 Nov 2013 | View |
| Noise contour map with scheme design yearApplication submission | 21 Nov 2013 | View |
| Noise contour map do minimum 2015Application submission | 21 Nov 2013 | View |
| Methodology to acquire digital imagesApplication submission | 21 Nov 2013 | View |
| Local landscaping characterApplication submission | 21 Nov 2013 | View |
| Invertebrate reportApplication submission | 21 Nov 2013 | View |
| General arrangementApplication submission | 21 Nov 2013 | View |
| Front sheet Environmental Impact assessment scoping opinion 5.1Application submission | 21 Nov 2013 | View |
| Fig 4.2 Lighting Contours Stutney Causeway RAApplication submission | 21 Nov 2013 | View |
| Fig 14.1 Agricultural LandholdingsApplication submission | 21 Nov 2013 | View |
| Fig 10.8 Cross Sections Environmental Masterplan Sheet 2Application submission | 21 Nov 2013 | View |
| Fig 10.14 Viewpoint Location PlanApplication submission | 21 Nov 2013 | View |
| Desk based archaeological assessmentApplication submission | 21 Nov 2013 | View |
| Water framework directiveApplication submission | 21 Nov 2013 | View |
| MethodologyApplication submission | 21 Nov 2013 | View |
| Location planApplication submission | 21 Nov 2013 | View |
| Fig 15.1 Water Attributes & FeaturesApplication submission | 21 Nov 2013 | View |
| Fig 10.9 Zone of Visual Influence Winter 2015Application submission | 21 Nov 2013 | View |
| Fig 10.22 Photographs 5-8Application submission | 21 Nov 2013 | View |
| Fig 10.12 Key Visual Effects Year 15 of Opening Summer 2030Application submission | 21 Nov 2013 | View |
| Fig 10.11 Year 2015 Winter Visual Impact ResidentialApplication submission | 21 Nov 2013 | View |
| Fig 10.10 Key Visual Effects Completion- WinterApplication submission | 21 Nov 2013 | View |
| Environmental masterplan A1Application submission | 21 Nov 2013 | View |
| Ely railway crossing option assessment addendumApplication submission | 21 Nov 2013 | View |
| EIA scoping opinionApplication submission | 21 Nov 2013 | View |
| Cross sections - scheme landscape proposals sheet 2Application submission | 21 Nov 2013 | View |
| Tree protection plan sheet 3Application submission | 21 Nov 2013 | View |
| Photomontage viewpoint 5 existing view and summer view 2030 sheet 10Application submission | 21 Nov 2013 | View |
| Photomontage viewpoint 3 existing view and summer view 2030 sheet 6Application submission | 21 Nov 2013 | View |
| Photmontage viewpoint 2 existing view and summer view 2030 sheet 4Application submission | 21 Nov 2013 | View |
| Noise difference do minimum opening year vs with scheme opening yearApplication submission | 21 Nov 2013 | View |
| Noise contour map with scheme opening yearApplication submission | 21 Nov 2013 | View |
| MethodologiesApplication submission | 21 Nov 2013 | View |
| Legislation and policyApplication submission | 21 Nov 2013 | View |
| Fig 7.6 Air Quality Monitoring Site LocationsApplication submission | 21 Nov 2013 | View |
| Underpass traffic calmingApplication submission | 21 Nov 2013 | View |
| Tree protection plan sheet 8Application submission | 21 Nov 2013 | View |
| Tree protection planApplication submission | 21 Nov 2013 | View |
| Photomontage viewpoint 6 existing view and winter view 2015 sheet 11Application submission | 21 Nov 2013 | View |
| Photomontage methodologyApplication submission | 21 Nov 2013 | View |
| Front sheet Option assessment report App 3.1Application submission | 21 Nov 2013 | View |
| Fig 8.10 Noise difference do minimum vs do nothing 2015Application submission | 21 Nov 2013 | View |
| Fig 11.3 Waterbody Survey MapApplication submission | 21 Nov 2013 | View |
| Fig 10.7 Cross Sections Environmental Masterplan Sheet 1Application submission | 21 Nov 2013 | View |
| Fig 10.2 Regional Landscape CharacterApplication submission | 21 Nov 2013 | View |
| Fig 10.18 Panoramic Viewpoints P7-8Application submission | 21 Nov 2013 | View |
| Fig 10.1 TopographyApplication submission | 21 Nov 2013 | View |
| from Cambs Chambers of CommerceConsultee comment | 1 Dec 2014 | View |
| from City of Ely CouncilConsultee comment | 1 Dec 2014 | View |
| from Littleport PCConsultee comment | 29 Aug 2014 | View |
| from English HeritageConsultee comment | 29 Aug 2014 | View |
| from Greater Cambridge & Greater Pbro Local Enterprise PartnershipConsultee comment | 20 Aug 2014 | View |
| from Mepal PCConsultee comment | 15 Aug 2014 | View |
| from Soham Town CouncilConsultee comment | 29 Jul 2014 | View |
| from CCC Rights of WayConsultee comment | 23 Jul 2014 | View |
| from Network RailConsultee comment | 23 Jul 2014 | View |
| from ECDC PlanningConsultee comment | 23 Jul 2014 | View |
| from Highways AuthorityConsultee comment | 22 Jul 2014 | View |
| from Natural EnglandConsultee comment | 18 Jul 2014 | View |
| Response from Littleport Parish CouncilConsultee comment | 16 Jul 2014 | View |
| response from Environment AgencyConsultee comment | 20 Jun 2014 | View |
| Response from ECDC Tree Officer Oct 13Consultee comment | 8 May 2014 | View |
| Response from ECDC EHO Nov 13Consultee comment | 8 May 2014 | View |
| Response from City of Ely Feb 14Consultee comment | 8 May 2014 | View |
| Response from Rights of Way Oct 13Consultee comment | 8 May 2014 | View |
| Response from Natural England Oct 13Consultee comment | 8 May 2014 | View |
| Response from ECDC Nov 13Consultee comment | 8 May 2014 | View |
| Response from East Cambs Commercial Vehicles Nov 13Consultee comment | 8 May 2014 | View |
| Response from Cathedral fabric commission Oct 13Consultee comment | 8 May 2014 | View |
| Response from Baldwin to applicantConsultee comment | 8 May 2014 | View |
| Response from Landscape Partnership Feb 14Consultee comment | 8 May 2014 | View |
| Response from ECDC Feb 14Consultee comment | 8 May 2014 | View |
| Response from ECDC EHO Nov 13Consultee comment | 8 May 2014 | View |
| From East Cambs HCV CommitteeConsultee comment | 8 May 2014 | View |
| From East Cambs HCV CommitteeConsultee comment | 8 May 2014 | View |
| Response from Highways Feb 14Consultee comment | 8 May 2014 | View |
| Response from English Heritage report Nov 13Consultee comment | 8 May 2014 | View |
| Response from English Heritage Nov 13Consultee comment | 8 May 2014 | View |
| Response from Ecology Nov 13Consultee comment | 8 May 2014 | View |
| Response from ECDC Jan 13Consultee comment | 8 May 2014 | View |
| Response from ECDC Comments Oct 13Consultee comment | 8 May 2014 | View |
| Response from CPRE Oct 13Consultee comment | 8 May 2014 | View |
| Response from Transport officer Nov 13Consultee comment | 8 May 2014 | View |
| Response from Soham town council Oct 13Consultee comment | 8 May 2014 | View |
| Response from Mgr Enterprise Mar 14Consultee comment | 8 May 2014 | View |
| Response from ECDC EHO Nov 13Consultee comment | 8 May 2014 | View |
| Response from CPRE Mar 14Consultee comment | 8 May 2014 | View |
| Response from Local enterprise Mar 14Consultee comment | 8 May 2014 | View |
| Response from English Heritage Nov 13Consultee comment | 8 May 2014 | View |
| response from English HeritageConsultee comment | 8 May 2014 | View |
| Response from Ecology Mar 14Consultee comment | 8 May 2014 | View |
| Response from ECDC Wendy HagueConsultee comment | 8 May 2014 | View |
| Response from ECDC Nov 13Consultee comment | 8 May 2014 | View |
| Response from ECDC conservation Oct 13Consultee comment | 8 May 2014 | View |
| Response from City of Ely Council Oct 13Consultee comment | 8 May 2014 | View |
| Response from Cawdle Fen IDB Oct 13Consultee comment | 8 May 2014 | View |
| report from English HeritageConsultee comment | 8 May 2014 | View |
| Response from Stuntney village Nov 13Consultee comment | 8 May 2014 | View |
| Response from Landscape partnership Nov 13Consultee comment | 8 May 2014 | View |
| Response from Highways Mar 14Consultee comment | 8 May 2014 | View |
| Response from ECDC planning decision Feb 14Consultee comment | 8 May 2014 | View |
| Response from ECDC comments Oct 13Consultee comment | 8 May 2014 | View |
| Response from EA Oct 13Consultee comment | 8 May 2014 | View |
| Response from Archaeology Nov 13Consultee comment | 8 May 2014 | View |
| Response from Sutton Parish Council Nov 13Consultee comment | 8 May 2014 | View |
| Response from Middle Fen & Mere Oct 13Consultee comment | 8 May 2014 | View |
| Response from Landscape partnership Nov 13Consultee comment | 8 May 2014 | View |
| Response from Highways Mar 14Consultee comment | 8 May 2014 | View |
| from Rights of Way & Access TeamApplicant/Agent correspondence | 3 Apr 2014 | View |
| from Cathedrals Fabric Commission for EnglandApplicant/Agent correspondence | 3 Apr 2014 | View |
| from ECDC Conservation OfficerApplicant/Agent correspondence | 2 Apr 2014 | View |
| from CPREApplicant/Agent correspondence | 2 Apr 2014 | View |
| from CPREApplicant/Agent correspondence | 2 Apr 2014 | View |
| from Environment AgencyApplicant/Agent correspondence | 21 Mar 2014 | View |
| ECDC Planning Committee reportApplicant/Agent correspondence | 5 Mar 2014 | View |
| Response from Environment AgencyApplicant/Agent correspondence | 27 Feb 2014 | View |
| from English HeritageApplicant/Agent correspondence | 27 Feb 2014 | View |
| Response Ely Allotment associationApplicant/Agent correspondence | 19 Feb 2014 | View |
| Natural EnglandApplicant/Agent correspondence | 19 Feb 2014 | View |
| Response Network railApplicant/Agent correspondence | 19 Feb 2014 | View |
| Response Ely CouncilApplicant/Agent correspondence | 19 Feb 2014 | View |
| Response ECDCApplicant/Agent correspondence | 19 Feb 2014 | View |
| Response Cllr HuntApplicant/Agent correspondence | 19 Feb 2014 | View |
Documents open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
No related records were published in this section.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.