New pedestrian and cycle bridge across the River Cam, including access ramps, lighting, steps, paths to the public highway, landscaping, replacement of the jetty, and flood compensation areas. , Condition 16: Construction Methods/Groundwater Pollution
Land Between Ditton Walk And Fen Road, Across Ditton Meadows And The River Cam, Cambridge
New pedestrian and cycle bridge across the River Cam, including access ramps, lighting, steps, paths to the public highway, landscaping, replacement of the jetty, and flood compensation areas. , Condition 16: Construction Methods/Groundwater Pollution
Reference
C/5005/16/CC/C1
Parish
Cambridge (Non Parished Area)
Agent
Ralph Lewis, Atkins
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.