Council planning record

Roof extension including raising of ridge and part pitched,part flat roofed rear dormer.

19 Chesterfield Road Cambridge Cambridgeshire CB4 1LN

WithdrawnReference: 26/03090/HFULCambridge City Council

Last published check: 10 Oct 2026, 18:01. Check the council record for more recent changes.

Application location

19 Chesterfield Road Cambridge Cambridgeshire CB4 1LN

This record has no verified map location.

View council map

Application summary

Status
Withdrawn
Application type
Householder Works/Extension
Received
14 Aug 2026
Validated
14 Aug 2026
Determination deadline
9 Oct 2026
Local authority
Cambridge City Council

Application overview

Roof extension including raising of ridge and part pitched,part flat roofed rear dormer.

Proposal details

Reference
26/03090/HFUL
Ward
East Chesterton
Agent
Complete Fabrications

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 26 of 26

DocumentPublishedAction
CONFIRMATION OF WITHDRAWALApplication Officer Correspondence · PDF6 Oct 2026View
CONFIRMATION OF WITHDRAWALAgent / Applicant Comments · PDF2 Oct 2026View
ACKNOWLEDGEMENT LETTERApplication Officer Correspondence · PDF18 Aug 2026View
MAP OF NOTIFIED NEIGHBOURSNeighbour/Consultee Notification List · PDF18 Aug 2026View
APPLICATION FORM - NO PERSONAL INFOApplication Information · PDF14 Aug 2026View
FEE CALCULATIONApplication Information · PDF14 Aug 2026View
ATTACHMENT SUMMARY FROM PORTALAttachment Summary · PDF14 Aug 2026View
COVER LETTERApplication Information · PDF14 Aug 2026View
DRAWINGS AND DOCUMENTS PLANNING INDEXApplication Information · PDF14 Aug 2026View
DESIGN AND ACCESS STATEMENTDesign and Access Statement · PDF14 Aug 2026View
SITE PLAN EXISTINGDrawings · PDF14 Aug 2026View
GROUND AND FIRST FLOOR PLANDrawings · PDF14 Aug 2026View
EXISTING LOFT AND ROOF PLANDrawings · PDF14 Aug 2026View
REAR ELEVATION EXISTINGDrawings · PDF14 Aug 2026View
SIDE ELEVATION EXISTING SOUTH WESTDrawings · PDF14 Aug 2026View
SIDE ELEVATION EXISTING NORTH EASTDrawings · PDF14 Aug 2026View
EXISTING FRONT ELEVATION NORTH WESTDrawings · PDF14 Aug 2026View
SITE PLAN PROPOSEDDrawings · PDF14 Aug 2026View
PROPOSED GROUND AND FIRST FLOOR PLANDrawings · PDF14 Aug 2026View
PROPOSED SECOND FLOOR ROOF PLANSDrawings · PDF14 Aug 2026View
REAR ELEVATION SOUTH EAST PROPOSED OPTION ADrawings · PDF14 Aug 2026View
SIDE ELEVATION SOUTH WEST PROPOSEDDrawings · PDF14 Aug 2026View
SIDE ELEVATION NORTH EAST PROPOSEDDrawings · PDF14 Aug 2026View
FRONT ELEVATION NORTH WEST PROPOSEDDrawings · PDF14 Aug 2026View
SECTION AA PROPOSEDDrawings · PDF14 Aug 2026View
LOCATION PLANDrawings · PDF14 Aug 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Decision Issued Date

    Published milestoneCouncil source
  4. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Withdrawn
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.