Council planning record

Refurbishment of existing student rooms, bathrooms and common areas in Y staircase in the former London and County Bank Building, re-roofing existing building with Welsh Slate, alterations to improve fire safety including smoke venting on roofs, additional rooftop extension connection between Y and Z staircases to improve escape routes and new dormer facing Bene't Street to facilitate the creation of an additional student room.

Corpus Christi College Trumpington Street Cambridge Cambridgeshire CB2 1RH

Awaiting decisionReference: 26/03046/FULCambridge City Council

Last published check: 10 Oct 2026, 18:25. Check the council record for more recent changes.

Application location

Corpus Christi College Trumpington Street Cambridge Cambridgeshire CB2 1RH

This record has no verified map location.

View council map

Application summary

Status
Awaiting decision
Application type
Full Application
Received
11 Aug 2026
Validated
11 Aug 2026
Determination deadline
6 Oct 2026
Local authority
Cambridge City Council

Application overview

Refurbishment of existing student rooms, bathrooms and common areas in Y staircase in the former London and County Bank Building, re-roofing existing building with Welsh Slate, alterations to improve fire safety including smoke venting on roofs, additional rooftop extension connection between Y and Z staircases to improve escape routes and new dormer facing Bene't Street to facilitate the creation of an additional student room.

Proposal details

Reference
26/03046/FUL
Ward
Market
Agent
Mike Tuck Studio

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 231 of 231

DocumentPublishedAction
ROOM Y3 PROPOSEDDrawings · PDF7 Oct 2026View
ROOM Y3 EXISTINGDrawings · PDF7 Oct 2026View
ROOM Y6 PROPOSEDDrawings · PDF7 Oct 2026View
ROOM Y6 EXISTINGDrawings · PDF7 Oct 2026View
ROOM Y7 PROPOSEDDrawings · PDF7 Oct 2026View
ROOM Y7 EXISTINGDrawings · PDF7 Oct 2026View
ROOM Y8 PROPOSEDDrawings · PDF7 Oct 2026View
ROOM Y8 EXISTINGDrawings · PDF7 Oct 2026View
ROOM Y9 PROPOSEDDrawings · PDF7 Oct 2026View
ROOM Y9 EXISTINGDrawings · PDF7 Oct 2026View
GYP ROOM YG01 PROPOSEDDrawings · PDF7 Oct 2026View
GYP ROOM YG01 EXISTINGDrawings · PDF7 Oct 2026View
ROOM YLOFT EXISTINGDrawings · PDF7 Oct 2026View
EXISTING SITE PLANDrawings · PDF7 Oct 2026View
EXISTING GROUND FLOOR PLANDrawings · PDF7 Oct 2026View
EXISTING FIRST FLOOR PLANDrawings · PDF7 Oct 2026View
EXISTING SECOND FLOOR PLANDrawings · PDF7 Oct 2026View
EXISTING THIRD FLOOR PLANDrawings · PDF7 Oct 2026View
EXISTING FOURTH FLOOR PLANDrawings · PDF7 Oct 2026View
EXISTING ROOF PLANDrawings · PDF7 Oct 2026View
EXISTING SECTION AADrawings · PDF7 Oct 2026View
EXISTING SECTION BBDrawings · PDF7 Oct 2026View
EXISTING SECTION CCDrawings · PDF7 Oct 2026View
EXISTING SECTION DDDrawings · PDF7 Oct 2026View
EXISTING SECTION EEDrawings · PDF7 Oct 2026View
EXISTING SECTION FFDrawings · PDF7 Oct 2026View
EXISTING SECTIONS GG AND HHDrawings · PDF7 Oct 2026View
EXISTING ELEVATIONS A AND BDrawings · PDF7 Oct 2026View
EXISTING ELEVATION CDrawings · PDF7 Oct 2026View
EXISTING ELEVATIONS D, E, F AND GDrawings · PDF7 Oct 2026View
EXISTING DORMER REFURB DETAILSDrawings · PDF7 Oct 2026View
PROPOSED LOGGIA DETAILSDrawings · PDF7 Oct 2026View
PROPOSED LOGGIA DETAILSDrawings · PDF7 Oct 2026View
ROOF DETAILS - VALLEYDrawings · PDF7 Oct 2026View
ROOF DETAILS - RIDGEDrawings · PDF7 Oct 2026View
ROOF DETAILS CEILING LEVEL INSULATIONDrawings · PDF7 Oct 2026View
GROUND FLOOR FIRE PLANDrawings · PDF7 Oct 2026View
FIRST FLOOR FIRE PLANDrawings · PDF7 Oct 2026View
SECOND FLOOR FIRE PLANDrawings · PDF7 Oct 2026View
THIRD FLOOR FIRE PLANDrawings · PDF7 Oct 2026View
FOURTH FLOOR FIRE PLANDrawings · PDF7 Oct 2026View
ROOF FIRE PLANDrawings · PDF7 Oct 2026View
GROUND FLOOR WALL LININGS PLANDrawings · PDF7 Oct 2026View
FIRST FLOOR WALL LININGS PLANDrawings · PDF7 Oct 2026View
SECOND FLOOR WALL LININGS PLANDrawings · PDF7 Oct 2026View
THIRD FLOOR WALL LININGS PLANDrawings · PDF7 Oct 2026View
FOURTH FLOOR WALL LININGS PLANDrawings · PDF7 Oct 2026View
PROPOSED GROUND FLOOR PLANDrawings · PDF7 Oct 2026View
PROPOSED FIRST FLOOR PLANDrawings · PDF7 Oct 2026View
PROPOSED SECOND FLOOR PLANDrawings · PDF7 Oct 2026View
PROPOSED THIRD FLOOR PLANDrawings · PDF7 Oct 2026View
PROPOSED FOURTH FLOOR PLANDrawings · PDF7 Oct 2026View
PROPOSED ROOF PLANDrawings · PDF7 Oct 2026View
PROPOSED SECTION AADrawings · PDF7 Oct 2026View
PROPOSED SECTION BBDrawings · PDF7 Oct 2026View
PROPOSED SECTION CCDrawings · PDF7 Oct 2026View
PROPOSED SECTION DDDrawings · PDF7 Oct 2026View
PROPOSED SECTION EEDrawings · PDF7 Oct 2026View
PROPOSED SECTION FFDrawings · PDF7 Oct 2026View
PROPOSED SECTIONS GG AND HHDrawings · PDF7 Oct 2026View
PROPOSED ELEVATIONS A AND BDrawings · PDF7 Oct 2026View
PROPOSED ELEVATION CDrawings · PDF7 Oct 2026View
PROPOSED ELEVATIONS D, E, F & GDrawings · PDF7 Oct 2026View
DEMOLITIONS AND ALTERATIONSDrawings · PDF7 Oct 2026View
DEMOLITIONS AND ALTERATIONSDrawings · PDF7 Oct 2026View
DEMOLITIONS AND ALTERATIONSDrawings · PDF7 Oct 2026View
ROOM Y10 PROPOSEDDrawings · PDF7 Oct 2026View
ROOM Y10 EXISTINGDrawings · PDF7 Oct 2026View
ROOM Y11 PROPOSEDDrawings · PDF7 Oct 2026View
ROOM Y11 EXISTINGDrawings · PDF7 Oct 2026View
ROOM Y12 PROPOSEDDrawings · PDF7 Oct 2026View
ROOM Y12 EXISTINGDrawings · PDF7 Oct 2026View
ROOM Y13 PROPOSEDDrawings · PDF7 Oct 2026View
ROOM Y13 EXISTINGDrawings · PDF7 Oct 2026View
ROOM Y14 PROPOSEDDrawings · PDF7 Oct 2026View
ROOM Y14 EXISTINGDrawings · PDF7 Oct 2026View
ROOM Y15 PROPOSEDDrawings · PDF7 Oct 2026View
ROOM Y15 EXISTINGDrawings · PDF7 Oct 2026View
ROOM Y16 PROPOSEDDrawings · PDF7 Oct 2026View
ROOM Y16 EXISTINGDrawings · PDF7 Oct 2026View
ROOM Y17 PROPOSEDDrawings · PDF7 Oct 2026View
ROOM Y1 PROPOSEDDrawings · PDF7 Oct 2026View
ROOM Y1 EXISTINGDrawings · PDF7 Oct 2026View
ROOM Y2 PROPOSEDDrawings · PDF7 Oct 2026View
ROOM Y2 EXISTINGDrawings · PDF7 Oct 2026View
FIRE DOORSDrawings · PDF7 Oct 2026View
FIRE DOORSDrawings · PDF7 Oct 2026View
FIRE DOORSDrawings · PDF7 Oct 2026View
FIRE DOORSDrawings · PDF7 Oct 2026View
FIRE-RATING DETAILSDrawings · PDF7 Oct 2026View
PROPOSED WALL LININGSDrawings · PDF7 Oct 2026View
TYPICAL BATHROOMDrawings · PDF7 Oct 2026View
PROPOSED SHOWER DETAILSDrawings · PDF7 Oct 2026View
SECONDARY GLAZINGDrawings · PDF7 Oct 2026View
SECONDARY GLAZINGDrawings · PDF7 Oct 2026View
SECONDARY GLAZINGDrawings · PDF7 Oct 2026View
SECONDARY GLAZINGDrawings · PDF7 Oct 2026View
SECONDARY GLAZINGDrawings · PDF7 Oct 2026View
SEONDARY GLAZINGDrawings · PDF7 Oct 2026View
SECONDARY GLAZINGDrawings · PDF7 Oct 2026View
SECONDARY GLAZINGDrawings · PDF7 Oct 2026View
YST SCHEDULES - DOOR SCHEDULE REVDApplication Information · PDF7 Oct 2026View
FIRE STRATEGY HERITAGE STATEMENTApplication Survey / Assessment / Statement · PDF6 Oct 2026View
HERITAGE STATEMENTApplication Survey / Assessment / Statement · PDF6 Oct 2026View
YST SCHEDULES - WINDOW SCHEDULE REV DApplication Information · PDF6 Oct 2026View
EOT REQUESTExtension of Time Request · PDF1 Oct 2026View
DEMOLITIONS AND ALTERATIONSDrawings · PDF30 Sept 2026View
ROOM Y1 EXISTINGDrawings · PDF30 Sept 2026View
ROOM Y1 PROPOSEDDrawings · PDF30 Sept 2026View
EXISTING GROUND FLOOR PLANDrawings · PDF30 Sept 2026View
PROPOSED FIRST FLOOR PLANDrawings · PDF30 Sept 2026View
STAGE 3Design and Access Statement · PDF30 Sept 2026View
FIRE STRATEGY HERITAGE STATEMENTDesign and Access Statement · PDF30 Sept 2026View
HERITAGE STATEMENTDesign and Access Statement · PDF30 Sept 2026View
CEILING REPORTApplication Survey / Assessment / Statement · PDF30 Sept 2026View
PLASTER CEILING SURVEYApplication Survey / Assessment / Statement · PDF30 Sept 2026View
YST SCHEDULES - DOOR SCHEDULEApplication Information · PDF30 Sept 2026View
YST SCHEDULES - WINDOW SCHEDULEApplication Information · PDF30 Sept 2026View
DEMOLITIONS AND ALTERATIONS - 4TH FLOORDrawings · PDF30 Sept 2026View
DEMOLITIONS AND ALTERATIONS - FIRST TO FOURTH FLOORDrawings · PDF30 Sept 2026View
EOT REQUESTExtension of Time Request · PDF16 Sept 2026View
LOCAL HIGHWAY AUTHORITYConsultee Comments · PDF10 Sept 2026View
ENVIRONMENTAL QUALITY AND GROWTHConsultee Comments9 Sept 2026View
ENVIRONMENTAL QUALITY AND GROWTHConsultee Comments9 Sept 2026View
EOT REQUESTExtension of Time Request · PDF4 Sept 2026View
ACKNOWLEDGEMENT LETTERApplication Officer Correspondence · PDF19 Aug 2026View
MAP OF NOTIFIED NEIGHBOURSNeighbour/Consultee Notification List · PDF19 Aug 2026View
SITE NOTICEApplication Press/Site Notices · PDF19 Aug 2026View
FEE CALCULATIONApplication Information · PDF11 Aug 2026View
APPLICATION FORM - NO PERSONAL INFOApplication Information · PDF11 Aug 2026View
ATTACHMENT SUMMARY FROM PORTALAttachment Summary · PDF11 Aug 2026View
DESIGN AND ACCESS STATEMENTSuperseded Documents · PDF11 Aug 2026View
HERITAGE STATEMENTSuperseded Documents · PDF11 Aug 2026View
LOCATION PLANDrawings · PDF11 Aug 2026View
FIRE SAFETY STRATEGY REPORTSuperseded Documents · PDF11 Aug 2026View
SERIES 10 SLIMLINE WINDOWApplication Information · PDF11 Aug 2026View
SERIES 20 SLIMLINE WINDOWApplication Information · PDF11 Aug 2026View
DOOR SCHEDULESuperseded Documents · PDF11 Aug 2026View
WINDOW SCHEDULESuperseded Documents · PDF11 Aug 2026View
EXISTING ROOM SHEETSDrawings · PDF11 Aug 2026View
ROOM Y7 EXISTINGDrawings · PDF11 Aug 2026View
ROOM 1 Y1 EXISTINGSuperseded Documents · PDF11 Aug 2026View
ROOM 2 Y2 EXISTINGDrawings · PDF11 Aug 2026View
ROOM 2 Y3 EXISTINGDrawings · PDF11 Aug 2026View
ROOM 2 Y6 EXISTINGDrawings · PDF11 Aug 2026View
ROOM 2 Y8 EXISTINGDrawings · PDF11 Aug 2026View
ROOM Y9 EXISTINGDrawings · PDF11 Aug 2026View
ROOM Y10 EXISTINGDrawings · PDF11 Aug 2026View
ROOM Y12 EXISTINGDrawings · PDF11 Aug 2026View
ROOM Y14 EXISTINGDrawings · PDF11 Aug 2026View
ROOM Y15 EXISTINGDrawings · PDF11 Aug 2026View
ROOM 4 Y16 EXISTINGDrawings · PDF11 Aug 2026View
ROOM Y14 EXISTINGDrawings · PDF11 Aug 2026View
ROOM YLOFT EXISTINGDrawings · PDF11 Aug 2026View
PROPOSED GROUND FLOOR PLANDrawings · PDF11 Aug 2026View
PROPOSED FIRST FLOOR PLANDrawings · PDF11 Aug 2026View
PROPOSED SECOND FLOOR PLANDrawings · PDF11 Aug 2026View
PROPOSED THIRD FLOOR PLANDrawings · PDF11 Aug 2026View
PROPOSED FOURTH FLOOR PLANDrawings · PDF11 Aug 2026View
PROPOSED ROOF PLANDrawings · PDF11 Aug 2026View
PROPOSED SECTION AADrawings · PDF11 Aug 2026View
PROPOSED SECTION BBDrawings · PDF11 Aug 2026View
PROPOSED SECTION CCDrawings · PDF11 Aug 2026View
PROPOSED SECTION DDDrawings · PDF11 Aug 2026View
PROPOSED SECTION EEDrawings · PDF11 Aug 2026View
PROPOSED SECTION FFDrawings · PDF11 Aug 2026View
PROPOSED SECTION GG AND HHDrawings · PDF11 Aug 2026View
PROPOSED ELEVATION A AND BDrawings · PDF11 Aug 2026View
PROPOSED ELEVATION CDrawings · PDF11 Aug 2026View
PROPOSED ELEVATION D E F AND GDrawings · PDF11 Aug 2026View
DEMOLITION AND ALTERATIONS FIRST TO FOURTH FLOORSuperseded Documents · PDF11 Aug 2026View
DEMOLITION AND ALTERATIONS FOURTH FLOORSuperseded Documents · PDF11 Aug 2026View
DEMOLITION AND ALTERATIONS SECTION CC TO HHSuperseded Documents · PDF11 Aug 2026View
PROPOSED WALL LININGDrawings · PDF11 Aug 2026View
TYPICAL BATHROOMDrawings · PDF11 Aug 2026View
FIRE DOORSDrawings · PDF11 Aug 2026View
PROPOSED SHOWER DETAILDrawings · PDF11 Aug 2026View
FIRE DOORS TYPE WITH SALTO LOCKDrawings · PDF11 Aug 2026View
SECONDARY GLAZING EXISTING AND PROPOSED PART 1Drawings · PDF11 Aug 2026View
SECONDARY GLAZING EXISTING PART 2Drawings · PDF11 Aug 2026View
SECONDARY GLAZING EXISTING AND PROPOSED PART 3Drawings · PDF11 Aug 2026View
SECONDARY GLAZING PROPOSED AND EXISTING PART 4Drawings · PDF11 Aug 2026View
GROUND FLOOR FIRE PLANDrawings · PDF11 Aug 2026View
FIRST FLOOR FIRE PLANDrawings · PDF11 Aug 2026View
SECOND FLOOR FIRE PLANDrawings · PDF11 Aug 2026View
THIRD FLOOR FIRE PLANDrawings · PDF11 Aug 2026View
FOURTH FLOOR FIRE PLANDrawings · PDF11 Aug 2026View
ROOF FIRE PLANDrawings · PDF11 Aug 2026View
ROOM 4 S01 PLANT ROOM PROPOSEDDrawings · PDF11 Aug 2026View
ROOM 1 Y1 PROPOSEDSuperseded Documents · PDF11 Aug 2026View
ROOM 2 Y2 PROPOSEDDrawings · PDF11 Aug 2026View
ROOM 2 Y3 PROPOSEDDrawings · PDF11 Aug 2026View
ROOM 2 Y6 PROPOSEDDrawings · PDF11 Aug 2026View
ROOM 2 Y7 PROPOSEDDrawings · PDF11 Aug 2026View
ROOM 2 Y9 PROPOSEDDrawings · PDF11 Aug 2026View
ROOM 3 Y11 PROPOSEDDrawings · PDF11 Aug 2026View
ROOM 3 Y12 PROPOSEDDrawings · PDF11 Aug 2026View
ROOM 3 Y13 PROPOSEDDrawings · PDF11 Aug 2026View
ROOM 3 Y13 EXISTINGDrawings · PDF11 Aug 2026View
ROOM 3 Y14 PROPOSEDDrawings · PDF11 Aug 2026View
ROOM 4 Y15 PROPOSEDDrawings · PDF11 Aug 2026View
ROOM 4 Y16 PROPOSEDDrawings · PDF11 Aug 2026View
ROOM 4 Y17 PROPOSEDDrawings · PDF11 Aug 2026View
ROOM 3 Y14 PROPOSEDDrawings · PDF11 Aug 2026View
EXISTING GROUND FLOOR PLANSuperseded Documents · PDF11 Aug 2026View
EXISTING FIRST FLOOR PLANDrawings · PDF11 Aug 2026View
EXISTING SECOND FLOOR PLANDrawings · PDF11 Aug 2026View
EXISTING THIRD FLOOR PLANDrawings · PDF11 Aug 2026View
EXISTING FOURTH FLOOR PLANDrawings · PDF11 Aug 2026View
EXISTING ROOF PLANDrawings · PDF11 Aug 2026View
EXISTING SECTION AADrawings · PDF11 Aug 2026View
EXISTING SECTION BBDrawings · PDF11 Aug 2026View
EXISTING SECTION CCDrawings · PDF11 Aug 2026View
EXISTING SECTION DDDrawings · PDF11 Aug 2026View
EXISTING SECTION EEDrawings · PDF11 Aug 2026View
EXISTING SECTION FFDrawings · PDF11 Aug 2026View
EXISTING SECTION GG AND HHDrawings · PDF11 Aug 2026View
EXISTING ELEVATION A AND BDrawings · PDF11 Aug 2026View
EXISTING ELEVATION CDrawings · PDF11 Aug 2026View
EXISTING ELEVATION D AND EDrawings · PDF11 Aug 2026View
EXISTING DORMER REFURB DETAILSDrawings · PDF11 Aug 2026View
PROPOSED LOGGIA DETAILSDrawings · PDF11 Aug 2026View
PROPOSED LOGGIA DETAILSDrawings · PDF11 Aug 2026View
ROOF DETAILS VALLEYDrawings · PDF11 Aug 2026View
ROOF DETAILS RIDGEDrawings · PDF11 Aug 2026View
ROOM 2 Y7 EXISTINGDrawings · PDF11 Aug 2026View
ROOM 3 Y11 EXISTINGDrawings · PDF11 Aug 2026View
TYPICAL BATHROOMDrawings · PDF11 Aug 2026View
FIRE DOORS D10 AND D09Drawings · PDF11 Aug 2026View
ROOM 2 Y7 PROPOSEDDrawings · PDF11 Aug 2026View
ROOM 3 Y10 PROPOSEDDrawings · PDF11 Aug 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Last Advertised In Press Date

    Published milestoneCouncil source
  4. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Agreed Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Decision not yet published

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.