Council planning record

Outline planning application with all matters reserved (save for means of access), for a flexible phased development in separate and severable components comprising the demolition and retention of existing buildings and erection of new buildings to provide: (i) employment generating floorspace comprising Use Class E(g)(i) (offices) and Use Class E(g)(ii) (research and development),flexible Class E(a-f) and Classes F1 and F2 for retail, leisure, community uses and Sui Generis including associated plant, (ii) residential development in Use Class C3 and Sui Generis (co-living), and associated plant, (iii) erection of mobility hubs (Sui Generis) for vehicular and cycle parking and associated plant, and (iv) means of access comprising new pedestrian, cycle and vehicular accesses from Cowley Road, new pedestrian and cycle accesses from the Cambridgeshire Guided Busway, provision of a new bus stop and crossing points of the Guided Busway, open spaces, landscaping, and associated infrastructure.

Cambridge Business Park Cowley Road Cambridge CB4 0WZ

Awaiting decisionReference: 26/02567/OUTCambridge City Council

Last published check: 3 Oct 2026, 09:33. Check the council record for more recent changes.

Application location

Cambridge Business Park Cowley Road Cambridge CB4 0WZ

This record has no verified map location.

View council map

Application summary

Status
Awaiting decision
Application type
Outline Application
Received
2 Jul 2026
Validated
10 Jul 2026
Determination deadline
30 Oct 2026
Local authority
Cambridge City Council

Application overview

Outline planning application with all matters reserved (save for means of access), for a flexible phased development in separate and severable components comprising the demolition and retention of existing buildings and erection of new buildings to provide: (i) employment generating floorspace comprising Use Class E(g)(i) (offices) and Use Class E(g)(ii) (research and development),flexible Class E(a-f) and Classes F1 and F2 for retail, leisure, community uses and Sui Generis including associated plant, (ii) residential development in Use Class C3 and Sui Generis (co-living), and associated plant, (iii) erection of mobility hubs (Sui Generis) for vehicular and cycle parking and associated plant, and (iv) means of access comprising new pedestrian, cycle and vehicular accesses from Cowley Road, new pedestrian and cycle accesses from the Cambridgeshire Guided Busway, provision of a new bus stop and crossing points of the Guided Busway, open spaces, landscaping, and associated infrastructure.

Proposal details

Reference
26/02567/OUT
Ward
East Chesterton
Agent
WSP

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 181 of 181

DocumentPublishedAction
NATIONAL HIGHWAYS (EXTN. OF HOLDING RECOMMENDATION PERIOD)Consultee Comments · PDF18 Sept 2026View
CONSERVATION OFFICER COMMENTSConsultee Comments · PDF10 Sept 2026View
COUNTY TRANSPORT TEAMConsultee Comments · PDF2 Sept 2026View
ANGLIAN WATERConsultee Comments · PDF27 Aug 2026View
CAMCYCLEThird Party Comments · PDF21 Aug 2026View
ECOLOGYConsultee Comments · PDF21 Aug 2026View
LANDSCAPE DESIGNConsultee Comments20 Aug 2026View
PUBLIC ARTConsultee Comments · PDF18 Aug 2026View
NHSConsultee Comments · PDF14 Aug 2026View
URBAN DESIGNConsultee Comments · PDF14 Aug 2026View
SUSTAINABLE DESIGNConsultee Comments14 Aug 2026View
NATIONAL HIGHWAYSConsultee Comments · PDF14 Aug 2026View
LOCAL HIGHWAY AUTHORITYConsultee Comments · PDF13 Aug 2026View
EAST WEST RAILWAY COMPANY LIMITED (EWR CO)Consultee Comments · PDF12 Aug 2026View
APPENDIX 10.8 - BNG METRIC (WITH MACRO)Application Survey / Assessment / Statement10 Aug 2026View
APPENDIX 10.8 - BNG METRIC (W/O MACRO)Application Survey / Assessment / Statement10 Aug 2026View
CAMBRIDGE AIRPORT (UPDATED CONSULTATION RESPONSE)Consultee Comments · PDF10 Aug 2026View
NATURAL ENGLANDConsultee Comments · PDF7 Aug 2026View
COUNTY EDUCATION, HOUSEHOLD WASTE AND RECYCLING AND LIBRARIESConsultee Comments · PDF7 Aug 2026View
ENVIRONMENT AGENCYConsultee Comments · PDF4 Aug 2026View
TREESConsultee Comments · PDF4 Aug 2026View
COUNTY MINERALS AND WASTEConsultee Comments · PDF4 Aug 2026View
PARISHConsultee Comments · PDF3 Aug 2026View
LOCAL LEAD FLOOD AUTHORITYConsultee Comments · PDF28 Jul 2026View
WASTE - SHARED SERVICEConsultee Comments21 Jul 2026View
WASTE - SHARED SERVICEConsultee Comments21 Jul 2026View
MINISTRY OF DEFENCEConsultee Comments · PDF20 Jul 2026View
AIRPORT SAFEGUARDING (SUPERSEDED)Consultee Comments · PDF17 Jul 2026View
JDMC BRIEFING PACK - PREPARED AND ISSUED BY TCECorrespondence · PDF17 Jul 2026View
HISTORIC ENGLANDConsultee Comments · PDF16 Jul 2026View
ACKNOWLEDGEMENT LETTERApplication Officer Correspondence · PDF15 Jul 2026View
MAP OF NOTIFIED NEIGHBOURSNeighbour/Consultee Notification List · PDF15 Jul 2026View
SITE NOTICEApplication Press/Site Notices · PDF15 Jul 2026View
CAMBRIDGE FIRST PUBLIC DRAIN HYDRAULIC MODELLING REPORT PART 1Application Information · PDF10 Jul 2026View
CAMBRIDGE FIRST PUBLIC DRAIN HYDRAULIC MODELLING REPORT PART 2Application Information · PDF10 Jul 2026View
CAMBRIDGE FIRST PUBLIC DRAIN HYDRAULIC MODELLING REPORT PART 3Application Information · PDF10 Jul 2026View
CAMBRIDGE FIRST PUBLIC DRAIN HYDRAULIC MODELLING REPORT PART 4Application Information · PDF10 Jul 2026View
DESIGN AND ACCESS STATEMENT PART 1Design and Access Statement · PDF10 Jul 2026View
DESIGN AND ACCESS STATEMENT PART 10Design and Access Statement · PDF10 Jul 2026View
DESIGN AND ACCESS STATEMENT PART 11Design and Access Statement · PDF10 Jul 2026View
DESIGN AND ACCESS STATEMENT PART 12Design and Access Statement · PDF10 Jul 2026View
DESIGN AND ACCESS STATEMENT PART 13Design and Access Statement · PDF10 Jul 2026View
DESIGN AND ACCESS STATEMENT PART 14Design and Access Statement · PDF10 Jul 2026View
DESIGN AND ACCESS STATEMENT PART 15Design and Access Statement · PDF10 Jul 2026View
DESIGN AND ACCESS STATEMENT PART 16Design and Access Statement · PDF10 Jul 2026View
DESIGN AND ACCESS STATEMENT PART 17Design and Access Statement · PDF10 Jul 2026View
DESIGN AND ACCESS STATEMENT PART 18Design and Access Statement · PDF10 Jul 2026View
DESIGN AND ACCESS STATEMENT PART 19Design and Access Statement · PDF10 Jul 2026View
DESIGN AND ACCESS STATEMENT PART 2Design and Access Statement · PDF10 Jul 2026View
DESIGN AND ACCESS STATEMENT PART 20Design and Access Statement · PDF10 Jul 2026View
DESIGN AND ACCESS STATEMENT PART 3Design and Access Statement · PDF10 Jul 2026View
DESIGN AND ACCESS STATEMENT PART 4Design and Access Statement · PDF10 Jul 2026View
DESIGN AND ACCESS STATEMENT PART 5Design and Access Statement · PDF10 Jul 2026View
DESIGN AND ACCESS STATEMENT PART 6Design and Access Statement · PDF10 Jul 2026View
DESIGN AND ACCESS STATEMENT PART 7Design and Access Statement · PDF10 Jul 2026View
DESIGN AND ACCESS STATEMENT PART 8Design and Access Statement · PDF10 Jul 2026View
DESIGN AND ACCESS STATEMENT PART 9Design and Access Statement · PDF10 Jul 2026View
DEVELOPMENT SPECIFICATIONApplication Information · PDF10 Jul 2026View
ENVIRONMENTAL STATEMENT VOL 2 CHAPTER 5 TOWNSCAPE LANDSCAPE AND VISUALApplication Survey / Assessment / Statement · PDF10 Jul 2026View
PLANNING STATEMENTApplication Survey / Assessment / Statement · PDF10 Jul 2026View
TOWNSCAPE SUMMARY PART 1Application Information · PDF10 Jul 2026View
TOWNSCAPE SUMMARY PART 2Application Information · PDF10 Jul 2026View
TOWNSCAPE SUMMARY PART 3Application Information · PDF10 Jul 2026View
TOWNSCAPE SUMMARY PART 4Application Information · PDF10 Jul 2026View
APPLICATION FORM - NO PERSONAL INFOApplication Information · PDF6 Jul 2026View
FEE CALCULATIONApplication Information · PDF6 Jul 2026View
ATTACHMENT SUMMARY FROM PORTALAttachment Summary · PDF6 Jul 2026View
APPENDIX 13.1 -WIND MICROCLIMATE CFD STUDYApplication Information · PDF6 Jul 2026View
APPENDIX 2.1 - SITE LOCATION PLANDrawings · PDF6 Jul 2026View
APPENDIX 5.1 TVIA METHODOLOGYApplication Information · PDF6 Jul 2026View
APPENDIX 5.2 - TOWNSCAPE AND LANDSCAPE ASSESSMENTApplication Information · PDF6 Jul 2026View
APPENDIX 2.2 - RELEVANT PARAMETER PLANS FOR ESApplication Information · PDF6 Jul 2026View
APPENDIX 5.3 - VISUAL ASSESSMENTApplication Survey / Assessment / Statement · PDF6 Jul 2026View
APPENDIX 5.4 ZTV WITH VIEWPOINT LOCATIONSDrawings6 Jul 2026View
APPENDIX 5.4 LANDSCAPE CHARACTER NATIONAL AND LOCALLDrawings · PDF6 Jul 2026View
APPENDIX 5.4 LANDSCAPE DESIGNATIONSDrawings · PDF6 Jul 2026View
APPENDIX 5.4 - FIGURE 5.5 - RECREATIONAL AND TRANSPORT ROUTESDrawings · PDF6 Jul 2026View
APPENDIX 5.4 VISITOR AND TOURIST DESTINATIONSDrawings · PDF6 Jul 2026View
APPENDIX 1.2 - EIA SCOPING OPINIONApplication Information · PDF6 Jul 2026View
APPENDIX 5.4 SUMMER WIRELINESApplication Information · PDF6 Jul 2026View
APPENDIX 5.4 RENDERS (AVR3)Application Information · PDF6 Jul 2026View
APPENDIX 5.4 ZTV WITH VIEWPOINT LOCATIONSDrawings6 Jul 2026View
APPENDIX 5.4 TOWNSCAPE CHARACTER AREASDrawings · PDF6 Jul 2026View
APPENDIX 6.1 TRANSPORT ASSESSMENT APPENDICES A-CApplication Survey / Assessment / Statement · PDF6 Jul 2026View
APPENDIX 6.1 TRANSPORT ASSESSMENT APPENDICES D-EApplication Survey / Assessment / Statement · PDF6 Jul 2026View
APPENDIX 6.1 TRANSPORT ASSESSMENT APPENDICES F-GDrawings · PDF6 Jul 2026View
APPENDIX 6.1 TRANSPORT ASSESSMENT MAIN REPORTApplication Information · PDF6 Jul 2026View
APPENDIX 6.2 FRAMEWORK TRAVEL PLANApplication Information · PDF6 Jul 2026View
APPENDIX 7.1 - FLOOD RISK ASSESSMENTApplication Survey / Assessment / Statement · PDF6 Jul 2026View
APPENDIX 7.2 -OUTLINE DRAINAGE STRATEGYDrawings · PDF6 Jul 2026View
APPENDIX 7.3 - WATER CONSERVATION REPORTApplication Information · PDF6 Jul 2026View
APPENDIX 9.1 GLOSSARYApplication Information · PDF6 Jul 2026View
APPENDIX 9.2 LEGISLATION POLICY AND GUIDANCEApplication Information · PDF6 Jul 2026View
APPENDIX 9.3 BASELINE CONDITIONSApplication Information · PDF6 Jul 2026View
APPENDIX 9.4 CONSTRUCTION NOISE AND VIBRATIONApplication Information · PDF6 Jul 2026View
APPENDIX 5.4WINTER WIRELINES - 1 OF 3Application Information · PDF6 Jul 2026View
APPENDIX 9.6 SITE SUITABILITY ASSESSMENTApplication Survey / Assessment / Statement · PDF6 Jul 2026View
APPENDIX 1.1 - EIA SCOPING REQUEST REPORTApplication Information · PDF6 Jul 2026View
APPENDIX 5.4 WINTER WIRELINES - 2 OF 3Application Information · PDF6 Jul 2026View
ARBORICULTURAL IMPACT ASSESSMENTApplication Survey / Assessment / Statement · PDF6 Jul 2026View
APPENDIX 5.4 WINTER WIRELINES - 3 OF 3Application Information · PDF6 Jul 2026View
CHAPTER 10 - BAT ACTIVITY SURVEYApplication Survey / Assessment / Statement · PDF6 Jul 2026View
APPENDIX 9.5 OPERATIONAL NOISEApplication Information · PDF6 Jul 2026View
CHAPTER 10 - BIODIVERSITY NET GAIN ASSESSMENTApplication Survey / Assessment / Statement · PDF6 Jul 2026View
CHAPTER 10 - GCN EDNA SURVEYApplication Survey / Assessment / Statement · PDF6 Jul 2026View
CHAPTER 10 - OTTER AND WATER VOLE SURVEYApplication Information · PDF6 Jul 2026View
CHAPTER 10 - PRELIMINARY ECOLOGICAL APPRAISALApplication Survey / Assessment / Statement · PDF6 Jul 2026View
CHAPTER 10 - PRELIMINARY ROOST ASSESSMENTApplication Survey / Assessment / Statement · PDF6 Jul 2026View
CHAPTER 12 APPENDIX A FACADE MAPPINGDrawings · PDF6 Jul 2026View
CHAPTER 12 DAYLIGHT AND SUNLIGHT APPENDICESApplication Information · PDF6 Jul 2026View
CHAPTER 12 - APPENDIX 12.3 C TRANSIENT OVERSHADOWDrawings · PDF6 Jul 2026View
CHAPTER 12 - APPENDIX 12.3 C TRANSIENT OVERSHADOWDrawings · PDF6 Jul 2026View
CHAPTER 12 - APPENDIX 12.4 D MODEL CONFIGURATIONApplication Information · PDF6 Jul 2026View
CHAPTER 12 - APPENDIX 12.5 E DSO CALCULATIONSApplication Information · PDF6 Jul 2026View
CHAPTER 8 - AIR QUALITY APPENDICESApplication Information · PDF6 Jul 2026View
COVERING LETTERApplication Information · PDF6 Jul 2026View
CHAPTER 10 - BAT EMERGENCE SURVEYApplication Survey / Assessment / Statement · PDF6 Jul 2026View
DESIGN CODE PART 1Application Information · PDF6 Jul 2026View
DESIGN CODE PART 2Application Information · PDF6 Jul 2026View
DESIGN CODE PART 3Application Information · PDF6 Jul 2026View
DESIGN CODE PART 4Application Information · PDF6 Jul 2026View
DESIGN CODE PART 5Application Information · PDF6 Jul 2026View
DESIGN CODE PART 6Application Information · PDF6 Jul 2026View
ENERGY STRATEGY REPORTApplication Information · PDF6 Jul 2026View
ENVIRONMENTAL CONSTRAINT PLANApplication Information · PDF6 Jul 2026View
HEALTH IMPACT ASSESSMENTApplication Survey / Assessment / Statement · PDF6 Jul 2026View
HISTORIC ENVIRONMENT DESK BASED ASSESSMENTApplication Survey / Assessment / Statement · PDF6 Jul 2026View
LIGHTING STRATEGYApplication Information · PDF6 Jul 2026View
OPERATIONAL WASTE MANAGEMENT STATEMENTApplication Survey / Assessment / Statement · PDF6 Jul 2026View
PARAMETER PLAN 01 EXISTING SITE PLANDrawings · PDF6 Jul 2026View
PARAMETER PLAN 02 DEMOLITION PLANDrawings · PDF6 Jul 2026View
PARAMETER PLAN 03 ACCESS AND CIRCULATION PLANDrawings · PDF6 Jul 2026View
PARAMETER PLAN 04 LAND USE PLAN - BASEMENTDrawings · PDF6 Jul 2026View
PARAMETER PLAN 05 LAND USE PLAN GROUND FLOORDrawings · PDF6 Jul 2026View
PARAMETER PLAN 06 LAND USE PLAN - UPPER LEVELSDrawings · PDF6 Jul 2026View
PARAMETER PLAN 07 OPEN SPACE PLANDrawings · PDF6 Jul 2026View
PARAMETER PLAN 08 MAXIMUM PLOT EXTENTS - BELOW GROUNDDrawings · PDF6 Jul 2026View
PARAMETER PLAN 09 PROPOSED MAXIMUM HEIGHTS - ABOVE GROUNDDrawings · PDF6 Jul 2026View
PARAMETER PLAN 10 DEVELOPMENT ZONES MAX BUILDING LINES AND PUBLIC REALMDrawings · PDF6 Jul 2026View
PARAMETER PLAN 11 URBAN DESIGN PLANDrawings · PDF6 Jul 2026View
PHASE 1 CONTAMINATED LAND PRELIMINARY RISK ASSESSMENTApplication Survey / Assessment / Statement · PDF6 Jul 2026View
PROPOSED LANDSCAPE LEVEL 00 PLANDrawings · PDF6 Jul 2026View
PROPOSED LEVEL 00 PLAN EMPLOYMENT SWITCHDrawings · PDF6 Jul 2026View
PROPOSED LEVEL 00 PLAN RESIDENTIAL SWITCHDrawings · PDF6 Jul 2026View
PROPOSED LEVEL 02 PLAN EMPLOYMENT SWITCHDrawings · PDF6 Jul 2026View
PROPOSED LEVEL 02 PLAN RESIDENTIAL SWITCHDrawings · PDF6 Jul 2026View
PROPOSED LEVEL 09 PLAN EMPLOYMENT SWITCHDrawings · PDF6 Jul 2026View
PROPOSED ROOF PLAN EMPLOYMENT SWITCHDrawings · PDF6 Jul 2026View
PROPOSED ROOF PLAN RESIDENTIAL SWITCHDrawings · PDF6 Jul 2026View
PUBLIC ART STRATEGYApplication Information · PDF6 Jul 2026View
RETAIL AND GROUND FLOOR STRATEGYApplication Information · PDF6 Jul 2026View
SITE CONSTRAINT PLANDrawings · PDF6 Jul 2026View
SITE LOCATION PLANDrawings · PDF6 Jul 2026View
SITE WASTE MANAGEMENT STATEMENTApplication Survey / Assessment / Statement · PDF6 Jul 2026View
SOCIAL AND ECONOMIC IMPACT STATEMENTApplication Survey / Assessment / Statement · PDF6 Jul 2026View
STATEMENT OF COMMUNITY ENGAGEMENT PART1Application Survey / Assessment / Statement · PDF6 Jul 2026View
STATEMENT OF COMMUNITY ENGAGEMENT PART2Application Information · PDF6 Jul 2026View
STATEMENT OF COMMUNITY ENGAGEMENT PART3Application Information · PDF6 Jul 2026View
SUSTAINABILITY STATEMENTApplication Survey / Assessment / Statement · PDF6 Jul 2026View
ENVIRONMENTAL STATEMENT VOL 2 CHAPTER 1Application Survey / Assessment / Statement · PDF6 Jul 2026View
ENVIRONMENTAL STATEMENT VOL 2 CHAPTER 10 BIODIVERSITY AND NATURE CONSERVATIONApplication Survey / Assessment / Statement · PDF6 Jul 2026View
ENVIRONMENTAL STATEMENT VOL 2 REPORT SOCIO-ECONOMICSApplication Survey / Assessment / Statement · PDF6 Jul 2026View
ENVIRONMENTAL STATEMENT VOL 2 CHAPTER 12 DAYLIGHT VOL 2 SUNLIGHT AND OVERSHADOWINGApplication Survey / Assessment / Statement · PDF6 Jul 2026View
ENVIRONMENTAL STATEMENT VOL 2 CHAPTER 13 WIND MICROCLIMATEApplication Survey / Assessment / Statement · PDF6 Jul 2026View
ENVIRONMENTAL STATEMENT VOL 2 CHAPTER 2 DESCRIPTION OF THE PROPOSED DEVELOPMENTApplication Survey / Assessment / Statement · PDF6 Jul 2026View
ENVIRONMENTAL STATEMENT VOL 2 CHAPTER 3 APPROACH TO ENVIRONMENTAL IMPACT ASSESSMENTApplication Survey / Assessment / Statement · PDF6 Jul 2026View
ENVIRONMENTAL STATEMENT VOL 2 CHAPTER 4 REASONABLE ALTERNATIVES CONSIDEREDApplication Survey / Assessment / Statement · PDF6 Jul 2026View
ENVIRONMENTAL STATEMENT VOL 2 CHAPTER 6 TRANSPORT MOVEMENT AND ACCESSApplication Survey / Assessment / Statement · PDF6 Jul 2026View
ENVIRONMENTAL STATEMENT VOL 2 CHAPTER 7 HYDROLOGY DRAINAGE AND WATER RESOURCESApplication Survey / Assessment / Statement · PDF6 Jul 2026View
ENVIRONMENTAL STATEMENT VOL 2 CHAPTER 8 AIR QUALITY ODOUR AND DUSTDrawings · PDF6 Jul 2026View
ENVIRONMENTAL STATEMENT VOL 2 CHAPTER 9 NOISE AND VIBRATIONApplication Information · PDF6 Jul 2026View
ENVIRONMENTAL STATEMENT VOLUME 1 NON-TECHNICAL SUMMARYApplication Survey / Assessment / Statement · PDF6 Jul 2026View
UTILITIES REPORTApplication Information · PDF6 Jul 2026View
YOUTH ENGAGEMENT REPORTApplication Information · PDF6 Jul 2026View
ENVIRONMENTAL STATEMENT VOL 2 CHAPTER 13 WIND MICROCLIMATEApplication Information · PDF6 Jul 2026View
ENVIRONMENTAL STATEMENT VOL 2 CHAPTER 8 AIR QUALITY ODOUR AND DUSTDrawings · PDF6 Jul 2026View
ENVIRONMENTAL STATEMENT VOL 2 CHAPTER 8 AIR QUALITY ODOUR AND DUSTDrawings · PDF6 Jul 2026View
ENVIRONMENTAL STATEMENT VOL 2 CHAPTER 9 NOISE AND VIBRATIONApplication Information · PDF6 Jul 2026View
ENVIRONMENTAL STATEMENT VOL 2 CHAPTER 12 DAYLIGHT VOL 2 SUNLIGHT AND OVERSHADOWINGApplication Information · PDF6 Jul 2026View
ENVIRONMENTAL STATEMENT VOL 2 CHAPTER 13 WIND MICROCLIMATEApplication Information · PDF6 Jul 2026View
LETTER TO JOINT DEVELOPMENT MANAGEMENT COMMITTEE PREPARED AND ISSUED ON BEHALF OF BY TCECorrespondence · PDF29 Jun 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Last Site Notice Posted Date

    Published milestoneCouncil source
  4. Last Advertised In Press Date

    Published milestoneCouncil source
  5. Determination Deadline

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.