T001 - London Plane - Reduce northern canopy by up to 3m to provide clearance to the building. Crown lift to 3m for pedestrian clearance. Crown lift to 5.2m for highways clearance.T002 - London Plane - Crown lift to 3m for pedestrian clearance. Crown lift to 5.2m for highways clearance.T003 - Silver Birch - Remove deadwood (all).T004 - London Plane - Reduce where practical to provide up to 1m clearance of streetlight. Crown lift to 3m for pedestrian clearance. Crown lift to 5.2m for highways clearance. T005 - London Plane - Reduce where practical to provide up to 1m clearance of streetlight. Crown lift to 3m for pedestrian clearance. Crown lift to 5.2m for highways clearance. T008 - London Plane - Crown lift to 5.2m for highways clearance.
Bidwell House Maris Lane Cambridge Cambridgeshire CB2 9LD
T001 - London Plane - Reduce northern canopy by up to 3m to provide clearance to the building. Crown lift to 3m for pedestrian clearance. Crown lift to 5.2m for highways clearance.T002 - London Plane - Crown lift to 3m for pedestrian clearance. Crown lift to 5.2m for highways clearance.T003 - Silver Birch - Remove deadwood (all).T004 - London Plane - Reduce where practical to provide up to 1m clearance of streetlight. Crown lift to 3m for pedestrian clearance. Crown lift to 5.2m for highways clearance. T005 - London Plane - Reduce where practical to provide up to 1m clearance of streetlight. Crown lift to 3m for pedestrian clearance. Crown lift to 5.2m for highways clearance. T008 - London Plane - Crown lift to 5.2m for highways clearance.
Reference
25/0287/TTCA
Ward
Trumpington
Agent
RH Tree Consultants Ltd
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.