S73 to vary condition 3 (Operating Hours) of planning permission 23/03389/FUL (Proposed change of use from HMO (use class C4) to create a flexible use (Use Class E and F1) including artists studios and communal / gallery space, as well as office use, educational use and retail use. Retrospective single storey rear extension and two-storey side extension following demolition of rear extension. Retention of barbers premises (Use Class E). Retention of 1no. studio flat. (use class C3)) to amend the wording of condition 3 to read: The uses hereby permitted shall not be used by the public outside of the hours of 08:00 and 21:00 Monday to Saturday, 10:00 and 16:00 on Sundays and Bank Holidays, unless otherwise agreed in writing by the Local Planning Authority.
54 And 54A Cherry Hinton Road Cambridge Cambridgeshire CB1 7AA
S73 to vary condition 3 (Operating Hours) of planning permission 23/03389/FUL (Proposed change of use from HMO (use class C4) to create a flexible use (Use Class E and F1) including artists studios and communal / gallery space, as well as office use, educational use and retail use. Retrospective single storey rear extension and two-storey side extension following demolition of rear extension. Retention of barbers premises (Use Class E). Retention of 1no. studio flat. (use class C3)) to amend the wording of condition 3 to read: The uses hereby permitted shall not be used by the public outside of the hours of 08:00 and 21:00 Monday to Saturday, 10:00 and 16:00 on Sundays and Bank Holidays, unless otherwise agreed in writing by the Local Planning Authority.
Reference
25/01564/S73
Ward
Coleridge
Agent
Cheffins
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.