S73 to vary condition 1 of planning permission 23/00525/S73 (S73 application to vary condition 1 of planning permission 22/01137/S73 (S73 to vary condition 1 of ref: 19/0535/FUL (retention of the existing temporary cabins accommodation beyond 31 May 2019 to facilitate the ongoing construction and refurbishment works at the College) - The temporary structures hereby permitted shall be removed from the site and the land restored to its former condition by 31 March 2023) - The temporary structures hereby permitted shall be removed from the site and the land restored to its former condition by 31 May 2025) - The temporary structures hereby permitted shall be removed from the site and the land restored to its former condition once the structures are no longer required or by 31 January 2026 whichever is sooner.
Clare College Trinity Lane Cambridge Cambridgeshire CB2 1TL
S73 to vary condition 1 of planning permission 23/00525/S73 (S73 application to vary condition 1 of planning permission 22/01137/S73 (S73 to vary condition 1 of ref: 19/0535/FUL (retention of the existing temporary cabins accommodation beyond 31 May 2019 to facilitate the ongoing construction and refurbishment works at the College) - The temporary structures hereby permitted shall be removed from the site and the land restored to its former condition by 31 March 2023) - The temporary structures hereby permitted shall be removed from the site and the land restored to its former condition by 31 May 2025) - The temporary structures hereby permitted shall be removed from the site and the land restored to its former condition once the structures are no longer required or by 31 January 2026 whichever is sooner.
Reference
25/00295/S73
Ward
Newnham
Agent
Turley
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.