Council planning record

Non material amendment of planning permission 25/00259/FUL Reduction of reinforced ground extent for fire tender access, Inclusion of a tool storage box in the south woodland near the Gardener's Hut, Inclusion of electrical kiosk behind covered bicycle and bin store, Omission of buried rainwater harvesting tank and addition of a rainwater barrel, Replacement of rooflight above central stairwell with roof lantern with clerestory glazing, Change to roofing material to single ply membrane from bitumen and metal, Relocation of roof access hatch, Reduction in extent and material change of escape stair enclosure/screen, Relocation of the ASHPs, Replacement of a secondary access door with a window, Relocation of west-facing windows at ground floor level, Omission of east-facing window at ground floor level, Inclusion of stove flue in section drawing and slight adjustment in plan location, Omission of batten cladding in recessed fa�ade areas, Introduction of small zone of cladding or fixed glazing panes beneath high-level clerestory windows, Introduction of louvred access door to raised plinth and vary the wording of condition 7 ( Archaeological Evaluation).

Addenbrookes NHS Hospital Trust 28 Long Road Cambridge Cambridgeshire CB2 8PS

DecidedReference: 25/00259/NMA1Cambridge City Council

Last published check: 9 Oct 2026, 18:45. Check the council record for more recent changes.

Application location

Addenbrookes NHS Hospital Trust 28 Long Road Cambridge Cambridgeshire CB2 8PS

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Non-Material Amendment
Received
6 Feb 2026
Validated
6 Feb 2026
Determination deadline
6 Mar 2026
Local authority
Cambridge City Council

Application overview

Non material amendment of planning permission 25/00259/FUL Reduction of reinforced ground extent for fire tender access, Inclusion of a tool storage box in the south woodland near the Gardener's Hut, Inclusion of electrical kiosk behind covered bicycle and bin store, Omission of buried rainwater harvesting tank and addition of a rainwater barrel, Replacement of rooflight above central stairwell with roof lantern with clerestory glazing, Change to roofing material to single ply membrane from bitumen and metal, Relocation of roof access hatch, Reduction in extent and material change of escape stair enclosure/screen, Relocation of the ASHPs, Replacement of a secondary access door with a window, Relocation of west-facing windows at ground floor level, Omission of east-facing window at ground floor level, Inclusion of stove flue in section drawing and slight adjustment in plan location, Omission of batten cladding in recessed fa�ade areas, Introduction of small zone of cladding or fixed glazing panes beneath high-level clerestory windows, Introduction of louvred access door to raised plinth and vary the wording of condition 7 ( Archaeological Evaluation).

Proposal details

Reference
25/00259/NMA1
Ward
Queen Ediths
Agent
Bidwells LLP

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 32 of 32

DocumentPublishedAction
DECISION NOTICEApplication Decision Notice · PDF14 Apr 2026View
DELEGATED REPORTApplication Committee / Delegated Report · PDF14 Apr 2026View
NMA COVER LETTERApplication Information · PDF7 Apr 2026View
DRAWING SCHEDULEApplication Information · PDF7 Apr 2026View
PROPOSED SITE PLANDrawings · PDF7 Apr 2026View
PROPOSED LOWER FLOORS PLANDrawings · PDF7 Apr 2026View
PROPOSED UPPER FLOORS PLANDrawings · PDF7 Apr 2026View
PROPOSED ROOF PLANDrawings · PDF7 Apr 2026View
PROPOSED SECTION AADrawings · PDF7 Apr 2026View
PROPOSED SECTION BBDrawings · PDF7 Apr 2026View
PROPOSED NORTH ELEVATIONDrawings · PDF7 Apr 2026View
PROPOSED SOUTH ELEVATIONDrawings · PDF7 Apr 2026View
PROPOSED EAST ELEVATIONDrawings · PDF7 Apr 2026View
PROPOSED WEST ELEVATIONDrawings · PDF7 Apr 2026View
ACKNOWLEDGEMENT LETTERApplication Officer Correspondence · PDF10 Feb 2026View
APPLICATION FORM - NO PERSONAL INFOApplication Information · PDF6 Feb 2026View
FEE CALCULATIONApplication Information · PDF6 Feb 2026View
ATTACHMENT SUMMARY FROM PORTALAttachment Summary · PDF6 Feb 2026View
CORRESPONDENCE WITH CHET_REDACTEDApplication Information · PDF6 Feb 2026View
CONDITION 7 WORDING CLARIFICATION FROM CASE OFFICERApplication Information · PDF6 Feb 2026View
PROPOSED SITE PLANDrawings · PDF6 Feb 2026View
PROPOSED LOWER FLOORS PLANDrawings · PDF6 Feb 2026View
PROPOSED UPPER FLOORS PLANDrawings · PDF6 Feb 2026View
PROPOSED ROOF PLANDrawings · PDF6 Feb 2026View
PROPOSED SECTION AADrawings · PDF6 Feb 2026View
PROPOSED SECTION BBDrawings · PDF6 Feb 2026View
PROPOSED NORTH ELEVATIONDrawings · PDF6 Feb 2026View
PROPOSED SOUTH ELEVATIONDrawings · PDF6 Feb 2026View
PROPOSED EAST ELEVATIONDrawings · PDF6 Feb 2026View
PROPOSED WEST ELEVATIONDrawings · PDF6 Feb 2026View
NMA COVER LETTERApplication Information · PDF6 Feb 2026View
NMA DRAWING REVISION SCHEDULEApplication Information · PDF6 Feb 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Issued Date

    Published milestoneCouncil source

Decision & conditions

Granted Permission
DECISION NOTICE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.