T21 Poplar - fell (appears to be completely dead - evident not only by the lack of leaf - other Poplars are producing foliage - but also by the fact that the mistletoe on this tree has also died)T22 Poplar - fell (alive but a considerable proportion of the crown is not coming into leaf. If removed, the only live section will be hanging over Adams Road where cars are regularly parked.)T31 Poplar - Reduce crown to previous pruning points (by approx 7-8m)- to alleviate mechanical loading of heavy branch weight and to minimise likelihood of failure.T10 Cherry - prune from adjacent structure to clear traffic lights by 1m where possible. Select growing points oriented away from traffic lights to maximise longevity of pruning effect. (low crown overhanging footpath and obstructing traffic light)
Trinity Old Field Grange Road Cambridge Cambridgeshire CB3 9AA
T21 Poplar - fell (appears to be completely dead - evident not only by the lack of leaf - other Poplars are producing foliage - but also by the fact that the mistletoe on this tree has also died)T22 Poplar - fell (alive but a considerable proportion of the crown is not coming into leaf. If removed, the only live section will be hanging over Adams Road where cars are regularly parked.)T31 Poplar - Reduce crown to previous pruning points (by approx 7-8m)- to alleviate mechanical loading of heavy branch weight and to minimise likelihood of failure.T10 Cherry - prune from adjacent structure to clear traffic lights by 1m where possible. Select growing points oriented away from traffic lights to maximise longevity of pruning effect. (low crown overhanging footpath and obstructing traffic light)
Reference
24/0476/TTPO
Ward
Newnham
Agent
Eastern Landscape Service Limited
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.