WithdrawnCouncil status: Withdrawn

S73 to vary conditions 2 (Approved plans) and 17 (Hard and Soft landscaping) of planning permission 19/1713/FUL (Front and rear extension and improvement works to the existing ground floor library, including demolition of previous front and rear extensions and associated external works) Omission of solar shading Brise Soleil and Change from resin bond gravel surfacing to paving slabs for surfacing.

Cherry Hinton Library High Street Cherry Hinton Cambridge Cambridgeshire CB1 9HZ

Cambridge City CouncilReference 23/04895/S73Section 73 - Remove/Vary Condition

Last published check: 20 Nov 2026, 09:03. Check the council record for more recent changes.

Status and dates

Last published check: 20 Nov 2026, 09:03 (UK)

  1. DoneReceived21 Dec 2023
  2. DoneValidated21 Dec 2023
  3. Not publishedConsultationNo date on council record
  4. Date set by councilAgreed decision date8 Mar 2024
  5. ClosedWithdrawnWithdrawn

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (8)
  1. Application Received

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Last Advertised In Press Date

    Published milestoneCouncil source
  4. Last Site Notice Posted Date

    Published milestoneCouncil source
  5. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Decision Issued Date

    Published milestoneCouncil source
  7. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Section 73 - Remove/Vary Condition
Ward
Cherry Hinton
Documents
22 published

Proposal

S73 to vary conditions 2 (Approved plans) and 17 (Hard and Soft landscaping) of planning permission 19/1713/FUL (Front and rear extension and improvement works to the existing ground floor library, including demolition of previous front and rear extensions and associated external works) Omission of solar shading Brise Soleil and Change from resin bond gravel surfacing to paving slabs for surfacing.

Reference
23/04895/S73
Ward
Cherry Hinton
Agent
Ingleton Wood LLP

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • CONFIRMATION OF WITHDRAWALApplication Officer Correspondence6 Mar 2024View
  • ? VARIATION OD CONDITION (SECTION 73) STATEMENTAgent / Applicant Comments1 Mar 2024View
  • ? VARIATION OD CONDITION (SECTION 73) STATEMENTAgent / Applicant Comments1 Mar 2024View
  • PROPOSED WITH BRISE SOLEILApplication Information1 Mar 2024View
  • PROPOSED WITHOUT BRISE SOLEILApplication Information1 Mar 2024View
  • AGENT/APPLICANT PUBLIC SPEAKING LETTERApplication Officer Correspondence27 Feb 2024View
  • INFORMATION RE. OVERHEATINGApplication Information16 Feb 2024View
  • INFORMATION RE. OVERHEATINGApplication Information16 Feb 2024View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Withdrawn
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.