Council planning record

Discharge condition 39 (Micrositing) of planning consent 25/0342/NCC (Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor)

Twyn Hywel Energy Park Land North-West Of Caerphilly

DecidedReference: 26/0018/CONDCaerphilly County Borough Council

Last published check: 14 Oct 2026, 04:25. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Standard Consultation Date

    Published milestoneCouncil source
  3. Application Validated Date

    Published milestoneCouncil source
  4. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Decision Issued Date

    Published milestoneCouncil source
  8. Decision Made Date

    Published milestoneCouncil source
  9. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided
Application type
Condition Discharge
Received
9 Jan 2026
Validated
12 Jan 2026
Determination deadline
9 Mar 2026
Local authority
Caerphilly County Borough Council

Application overview

Discharge condition 39 (Micrositing) of planning consent 25/0342/NCC (Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor)

Proposal details

Reference
26/0018/COND
Ward
Nelson
Agent
Savills (UK) Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Twyn Hywel Energy Park Land North-West Of Caerphilly

This record has no verified map location.

View council map

Documents 16 of 16

DocumentPublishedAction
DECISIONDecision · PDF22 Apr 2026View
DELEGATED REPORTDelegated Report · PDF22 Apr 2026View
MICROSITING PROTOCOLReport · PDF6 Mar 2026View
NATURAL RESOURCES WALES COMMENTSConsultee Comment · PDF29 Jan 2026View
HENEB COMMENTSConsultee Comment · PDF28 Jan 2026View
DWR CYMRU COMMENTSConsultee Comment · PDF26 Jan 2026View
CADW COMMENTSConsultee Comment · PDF26 Jan 2026View
SENIOR ENGINEER (DRAINAGE) COMMENTSConsultee Comment · PDF19 Jan 2026View
MINING REMEDIATION AUTHORITY COMMENTSConsultee Comment · PDF16 Jan 2026View
NATIONAL GAS TRANSMISSION COMMENTSConsultee Comment · PDF13 Jan 2026View
NATIONAL GRID ELECTRICITY DISTRIBUTION COMMENTSConsultee Comment · PDF12 Jan 2026View
APPLICATION FORMApplication Form · PDF9 Jan 2026View
COVERING LETTERCorrespondence · PDF9 Jan 2026View
SITE LOCATION PLANOS Extract · PDF9 Jan 2026View
25/0342/NCC DECISION NOTICECorrespondence · PDF9 Jan 2026View
COVERING EMAILCorrespondence9 Jan 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Decide Cond Discharge case
DECISION 25/0342/NCC DECISION NOTICE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.