Council planning record

Seek approval of a non material amendment to planning consent 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the wording of condition 22 (Borrow Pit Restoration Plan) to allow the construction works which would not impact upon the borrow pits to commence

Twyn Hywel Energy Park Land North-West Of Caerphilly

DecidedReference: 25/0541/NMACaerphilly County Borough Council

Last published check: 21 Sept 2026, 06:13. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Decision Issued Date

    Published milestoneCouncil source
  4. Decision Made Date

    Published milestoneCouncil source
  5. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided
Application type
Non-Material Amendments
Received
4 Aug 2025
Validated
4 Aug 2025
Determination deadline
1 Sept 2025
Local authority
Caerphilly County Borough Council

Application overview

Seek approval of a non material amendment to planning consent 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the wording of condition 22 (Borrow Pit Restoration Plan) to allow the construction works which would not impact upon the borrow pits to commence

Proposal details

Reference
25/0541/NMA
Ward
Nelson
Agent
Savills (UK) Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Twyn Hywel Energy Park Land North-West Of Caerphilly

This record has no verified map location.

View council map

Documents 6 of 6

DocumentPublishedAction
DELEGATED REPORTDelegated Report · PDF1 Sept 2025View
DECISIONDecision · PDF1 Sept 2025View
LOCATION PLANOS Extract · PDF4 Aug 2025View
DECISION NOTICE 23/0427/DNSDecision · PDF4 Aug 2025View
COVERING LETTERCorrespondence · PDF4 Aug 2025View
APPLICATION FORMApplication Form · PDF4 Aug 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Granted
DECISION DECISION NOTICE 23/0427/DNS
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.