Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Land At Grid Ref 316516 205934 Manmoel Road Manmoel
Last published check: 28 Sept 2026, 21:19. Check the council record for more recent changes.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceConstruct and operate up to 5 turbines of up to 180m maximum tip height and associated crane hardstandings, transformers housed adjacent or in turbines, on-site access tracks plus underground cable runs alongside, an on-site sub-station building, construction compound(s) and access into the site boundary
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsLand At Grid Ref 316516 205934 Manmoel Road Manmoel
This record has no verified map location.
View council map| Document | Published | Action |
|---|---|---|
| WELSH MINISTERS LETTERCorrespondence · PDF | 15 Oct 2024 | View |
| INSPECTORS REPORT - WELSH VERSIONCorrespondence · PDF | 15 Oct 2024 | View |
| INSPECTORS REPORTCorrespondence · PDF | 15 Oct 2024 | View |
| TAFLEN-LEAFLET HCCorrespondence · PDF | 15 Oct 2024 | View |
| WELSH MINISTERS DECISION LETTERDecision · PDF | 15 Oct 2024 | View |
| WELSH MINISTERS LETTERCorrespondence · PDF | 30 Jul 2024 | View |
| ACKNOWLEDGEMENT LETTERCorrespondence | 5 Jun 2024 | View |
| TURBINE DELIVERY ROUTE APPRAISAL REVISION SUMMARYOther · PDF | 13 Mar 2024 | View |
| TURBINE DELIVERY ROUTE APPRAISALReport · PDF | 13 Mar 2024 | View |
| TURBINE DELIVERY ROUTE APPRAISALReport · PDF | 13 Mar 2024 | View |
| MINERALS POLICY PEDW RESPONSE (REPORT - 1338023 - 1 - A1) - 1Report · PDF | 13 Mar 2024 | View |
| MANMOEL WIND FARM UPDATES TO PPW CHAPER 6 (CORRESPOND - 1337601 - 1 - B1) - 1Correspondence · PDF | 13 Mar 2024 | View |
| MANMOEL WIND FARM UPDATES TO PPW CHAPER 6 (CORRESPOND - 1337601 - 1 - B1) - 1Drawing · PDF | 13 Mar 2024 | View |
| MANMOEL COMMON LAND REPORTReport · PDF | 13 Mar 2024 | View |
| HYDROLOGY MANMOEL EMReport · PDF | 13 Mar 2024 | View |
| FIGURE-8-37A_-_5-60F_VIEWPOINT_WIRELINES_MONTAGES_OCT-2023Photo · PDF | 13 Mar 2024 | View |
| COPY OF ECOLOGY ORNITHOLOGY PEDW RESPONSE (CORRESPOND - 1332438 - 1 - A4) - 1Report · PDF | 13 Mar 2024 | View |
| CHAPTER 8 LVIA WITH RED AMENDS FOR SUBMISSION TO INSPECTOR (REPORT - 1338016 - 1Report · PDF | 13 Mar 2024 | View |
| APPENDIX 8 LVIA WITH RED AMENDS FOR INSPECTOR (REPORT - 1338015 - 1 - A4) - 1Report · PDF | 13 Mar 2024 | View |
| 231024 CPAT RESPONSE TO BGCBCCorrespondence · PDF | 13 Mar 2024 | View |
| 231019_22_0191 RESPONSE TO CCBC LIR NOISECorrespondence · PDF | 13 Mar 2024 | View |
| WAG COMMENTSConsultee Comment | 4 Mar 2024 | View |
| LETTER FROM PEDWCorrespondence · PDF | 5 Jan 2024 | View |
| FURTHER INFO - RESPONSE ON MINERALS POLICY - UPDATED REPORTReport · PDF | 5 Jan 2024 | View |
| FURTHER INFO - TURBINE DELIVERY ROUTE APPRAISAL - REVISION DReport · PDF | 5 Jan 2024 | View |
| FURTHER INFO - CRUGLWYN TURBINES - DECISION - 17 0521 FULLDecision · PDF | 6 Dec 2023 | View |
| FURTHER INFO - CRUGLWYN TURBINES - APPROVED PLANDrawing · PDF | 6 Dec 2023 | View |
| FURTHER INFO - CRUGLWYN TURBINES - APPROVED PLANDrawing · PDF | 6 Dec 2023 | View |
| FURTHER INFO - CRUGLWYN TURBINES - DECISION - 14 0761 FULLDecision · PDF | 6 Dec 2023 | View |
| FURTHER INFO - CRUGLWYN TURBINES - GENERAL ARRANGEMENT PLANDrawing · PDF | 6 Dec 2023 | View |
| FURTHER INFO - CRUGLWYN TURBINES - INDICATIVE SWITCHROOMDrawing · PDF | 6 Dec 2023 | View |
| FURTHER INFO - CRUGLWYN TURBINES - LOCATION PLANDrawing · PDF | 6 Dec 2023 | View |
| FURTHER INFO - PLANNING STATEMENT AND DRAWINGSReport · PDF | 6 Dec 2023 | View |
| FURTHER INFO - CRUGLWYN TURBINES - TURBINE ELEVATIONReport · PDF | 6 Dec 2023 | View |
| FURTHER INFO - CCBC AND BGCBC DRAFT PROPOSED CONDITIONSCorrespondence · PDF | 6 Dec 2023 | View |
| FURTHER INFO -AMENDED APPENDIX 8 LVIAReport · PDF | 6 Dec 2023 | View |
| FURTHER INFO - AMENDED CHAPTER 8 LVIAReport · PDF | 6 Dec 2023 | View |
| FURTHER INFO - APPLICANT ECOLOGY AND ORNITHOLOGY RESPONSE TO PEDWReport · PDF | 6 Dec 2023 | View |
| FURTHER INFO - APPLICANT HYDROLOGY RESPONSE TO PEDWReport · PDF | 6 Dec 2023 | View |
| FURTHER INFO - APPLICANT RESPONSE ON UPDATES TO PPW CHAPTER 6Report · PDF | 6 Dec 2023 | View |
| FURTHER INFO - APPLICANT RESPONSE TO CCBC LIR NOISEReport · PDF | 6 Dec 2023 | View |
| FURTHER INFO -APPLICANT RESPONSE TO PEDW NOVEMBER 2023Correspondence · PDF | 6 Dec 2023 | View |
| FURTHER INFO -CPAT RESPONSE TO BGCBCConsultee Comment · PDF | 6 Dec 2023 | View |
| FURTHER INFO - MANMOEL COMMON LAND REPORT AMENDED NOV 23Report · PDF | 6 Dec 2023 | View |
| FURTHER INFO - MANMOEL PEAT INTERPOLATION MAPDrawing · PDF | 6 Dec 2023 | View |
| FURTHER INFO - TURBINE DELIVERY ROUTE APPRAISAL REVISION SUMMARYReport · PDF | 6 Dec 2023 | View |
| ECOLOGY COMMENTSConsultee Comment | 7 Sept 2023 | View |
| ECOLOGY COMMENTSConsultee Comment | 7 Sept 2023 | View |
| ECOLOGIST COMMENTSConsultee Comment · PDF | 7 Sept 2023 | View |
| LANDSCAPE OFFICER COMMENTSConsultee Comment · PDF | 1 Sept 2023 | View |
| LANDSCAPE REVIEW DOCUMENTConsultee Comment · PDF | 1 Sept 2023 | View |
| ENVIRONMENTAL HEALTH OFFICER COMMENTSConsultee Comment · PDF | 30 Aug 2023 | View |
| TRANSPORTATION ENGINEERING MANAGER COMMENTSConsultee Comment · PDF | 29 Aug 2023 | View |
| CHIEF FIRE OFFICER COMMENTSConsultee Comment · PDF | 21 Aug 2023 | View |
| SENIOR DRAINAGE ENGINEER COMMENTSConsultee Comment · PDF | 14 Aug 2023 | View |
| GLAMORGAN-GWENT ARCHAEOLOGICAL TRUST COMMENTSConsultee Comment · PDF | 11 Aug 2023 | View |
| PROW COMMENTSConsultee Comment · PDF | 11 Aug 2023 | View |
| LPAS CONFIRMATION OF RECEIPTCorrespondence · PDF | 7 Aug 2023 | View |
| LETTER EXTENDING ACCEPTANCE PERIOD - MANMOELCorrespondence · PDF | 7 Aug 2023 | View |
| APPLICATION FORMApplication Form · PDF | 4 Aug 2023 | View |
| MANMOEL WIND FARM DESIGN AND ACCESS STATEMENTReport · PDF | 4 Aug 2023 | View |
| SUPPORTING DOCUMENTATION - PRE-APPLICATION CONSULTATION (PAC) REPORTReport · PDF | 4 Aug 2023 | View |
| PLANNING STATEMENTReport · PDF | 4 Aug 2023 | View |
| LPAS CONFIRMATION OF RECEIPTCorrespondence · PDF | 4 Aug 2023 | View |
| MANMOEL LIST OF DOCUMENTSReport · PDF | 4 Aug 2023 | View |
| MANMOEL WIND FARM SECONDARY CONSENT STATEMENTReport · PDF | 4 Aug 2023 | View |
| MANMOEL WIND FARM SECTION 106 WRITTEN STATEMENTReport · PDF | 4 Aug 2023 | View |
| SUPPLEMENTARY IMPACT ASSESSMENTReport · PDF | 4 Aug 2023 | View |
| MANMOEL SITE NOTICESCorrespondence · PDF | 4 Aug 2023 | View |
| 2023-08-04 - EXNOTE001 -ACCEPTANCE OF APPLICATIONCorrespondence · PDF | 4 Aug 2023 | View |
| 2023-08-04 - EXNOTE 001 - ACCEPTANCE OF APPLICATIONCorrespondence · PDF | 4 Aug 2023 | View |
| MANMOEL EIA VOLUME 4 NON-TECHNICAL SUMMARY (NTS) - FRONT COVERReport · PDF | 4 Aug 2023 | View |
| MANMOEL EIA VOLUME 4 NON-TECHNICAL SUMMARY (NTS) - PREFACEReport · PDF | 4 Aug 2023 | View |
| MANMOEL WIND FARM NON-TECHNICAL SUMMARY (NTS)Report · PDF | 4 Aug 2023 | View |
| MANMOEL EIA VOLUME 3 APPENDICES - FRONT COVERReport · PDF | 4 Aug 2023 | View |
| MANMOEL EIA VOLUME 3 APPENDICES - PREFACEReport · PDF | 4 Aug 2023 | View |
| MANMOEL ES APPENDIX 8 - LANDSCAPE AND VISUAL IMPACT ASSESSMENTReport · PDF | 4 Aug 2023 | View |
| MANMOEL ES APPENDIX 9 - CULTURAL HERITAGE ASSESSMENTReport · PDF | 4 Aug 2023 | View |
| MANMOEL WIND FARM ES - APPENDIX 11 - TRAFFIC AND TRANSPORTReport · PDF | 4 Aug 2023 | View |
| MANMOEL WIND FARM ES - APPENDIX 12 - NOISEReport · PDF | 4 Aug 2023 | View |
| MANMOEL WIND FARM ES - APPENDIX 13 - HEALTH AND PUBLIC SAFETYReport · PDF | 4 Aug 2023 | View |
| MANMOEL WIND FARM ES - APPENDIX 14 - AVIATION & EXISTING INFRASTRUCTUREReport · PDF | 4 Aug 2023 | View |
| MANMOEL WIND FARM ES - APPENDIX A3 - APPROACH TO EIAReport · PDF | 4 Aug 2023 | View |
| MANMOEL WIND FARM ES - APPENDIX A6 - ECOLOGYReport · PDF | 4 Aug 2023 | View |
| MANMOEL WIND FARM ES - APPENDIX A7 - ORNITHOLOGYReport · PDF | 4 Aug 2023 | View |
| MANMOEL WIND FARM ES - APPENDIX A10 - HYDROLOGY, GEOLOGY AND HYDROGEOLOGYReport · PDF | 4 Aug 2023 | View |
| MANMOEL WIND FARM ES - CHAPTER 1 - FIGURE 1.1 REGIONAL CONTEXTDrawing · PDF | 4 Aug 2023 | View |
| MANMOEL WIND FARM ES - CHAPTER 1 - FIGURE 1.2 SITE LAYOUTDrawing · PDF | 4 Aug 2023 | View |
| MANMOEL WIND FARM ES - CHAPTER 4 - FIGURE 4.1 CONSTRAINTS TO SITE DESIGNDrawing · PDF | 4 Aug 2023 | View |
| FIGURE 6.1 SITE AND ECOLOGICAL SURVEY AREASDrawing · PDF | 4 Aug 2023 | View |
| FIGURE 6.2 STATIC BAT DETECTOR LOCATIONSDrawing · PDF | 4 Aug 2023 | View |
| FIGURE 6.3 GREAT CRESTED NEWT SURVEY LOCATIONSDrawing · PDF | 4 Aug 2023 | View |
| FIGURE 6.4 STATUTORY DESIGNATED SITES WITH ECOLOGICAL INTERESTDrawing · PDF | 4 Aug 2023 | View |
| FIGURE 6.5 NON-STATUTORY DESIGNATED SITES WITH ECOLOGICAL INTERESTDrawing · PDF | 4 Aug 2023 | View |
| FIGURE 6.6 PRELIMINARY BAT ROOST ASSESSMENT RESULTS 2020Drawing · PDF | 4 Aug 2023 | View |
| FIGURE 6.7 PHASE 1 SURVEY RESULTS 2020-2021Drawing · PDF | 4 Aug 2023 | View |
| FIGURE 6.8 NVC HABITAT SURVEY RESULTS 2020-2021Drawing · PDF | 4 Aug 2023 | View |
| FIGURE A.1 HABITAT MANAGEMENT AREA - PHASE 1 HABITATSDrawing · PDF | 4 Aug 2023 | View |
| FIGURE 7.1 SITE AND ORNITHOLOGICAL SURVEY AREASDrawing · PDF | 4 Aug 2023 | View |
| FIGURE 7.2 VP LOCATIONS AND VIEWSHEDSDrawing · PDF | 4 Aug 2023 | View |
| FIGURE 7.3 DESIGNATED ORNITHOLOGICAL SITES WITHIN DESK STUDY SEARCH AREASDrawing · PDF | 4 Aug 2023 | View |
| FIGURE 7.4 VP SURVEY RESULTS BREEDING SEASON 2020 (MARCH TO AUGUST) - RAPTORSDrawing · PDF | 4 Aug 2023 | View |
| FIGURE 7.5 VP SURVEY RESULTS BREEDING SEASON 2021 (MARCH TO AUGUST) - RAPTORSDrawing · PDF | 4 Aug 2023 | View |
| FIGURE 7.6 VP SURVEY RESULTS BREEDING SEASON 2020 (MARCH TO AUGUST) - GULLSDrawing · PDF | 4 Aug 2023 | View |
| FIGURE 7.7 VP SURVEY RESULTS BREEDING SEASON 2021 (MARCH TO AUGUST) - GULLSDrawing · PDF | 4 Aug 2023 | View |
| FIGURE 7.8 VP SURVEY RESULTS NON-BREEDING SEASON (SEPTEMBER 2019 TO FEBRUARY 202Drawing · PDF | 4 Aug 2023 | View |
| FIGURE 7.9 VP SURVEY RESULTS NON-BREEDING SEASON (SEPTEMBER 2020 TO FEBRUARY 202Drawing · PDF | 4 Aug 2023 | View |
| FIGURE 7.10 RAPTOR SURVEY RESULTS 2020 AND 2021Drawing · PDF | 4 Aug 2023 | View |
| FIGURE 7.11 NIGHTJAR SURVEY RESULTS 2020 AND 2021Drawing · PDF | 4 Aug 2023 | View |
| FIGURE-8-1_45KM_ZTV_TIP_HEIGHTDrawing · PDF | 4 Aug 2023 | View |
| FIGURE-8-2_15KM_ZTV_TIP_HEIGHTDrawing · PDF | 4 Aug 2023 | View |
| FIGURE-8-3_45KM_ZTV_HUB_HEIGHTDrawing · PDF | 4 Aug 2023 | View |
| FIGURE-8-4_15KM_ZTV_HUB_HEIGHTDrawing · PDF | 4 Aug 2023 | View |
| FIGURE-8-5_CUMULATIVE_WINDFARM_LOCATIONDrawing · PDF | 4 Aug 2023 | View |
| FIGURE-8-6_45KM_CUMULATIVE_WINDFARM_ZTV_OPERATIONALDrawing · PDF | 4 Aug 2023 | View |
| FIGURE-8-7_15KM_CUMULATIVE_WINDFARM_ZTV_OPERATIONALDrawing · PDF | 4 Aug 2023 | View |
| FIGURE-8-8_45KM_CUMULATIVE_WINDFARM_ZTV_CONSENTEDDrawing · PDF | 4 Aug 2023 | View |
| FIGURE-8-9_15KM_CUMULATIVE_WINDFARM_ZTV_CONSENTEDDrawing · PDF | 4 Aug 2023 | View |
| FIGURE-8-10_45KM_CUMULATIVE_WINDFARM_ZTV_SUBMITTEDDrawing · PDF | 4 Aug 2023 | View |
| FIGURE-8-11_15KM_CUMULATIVE_WINDFARM_ZTV_SUBMITTEDDrawing · PDF | 4 Aug 2023 | View |
| FIGURE-8-12_45KM_CUMULATIVE_WINDFARM_ZTV_SCOPING (1)Drawing · PDF | 4 Aug 2023 | View |
| FIGURE-8-13_15KM_CUMULATIVE_WINDFARM_ZTV_SCOPINGDrawing · PDF | 4 Aug 2023 | View |
| FIGURE-8-14_45KM_CUMULATIVE_NON_WIND_FARM_DEVELOPMENT_LOCATION_PLAN (1)Drawing · PDF | 4 Aug 2023 | View |
| FIGURE-8-15_15KM_CUMULATIVE_NON_WIND_FARM_DEVELOPMENT_LOCATION_PLANDrawing · PDF | 4 Aug 2023 | View |
| FIGURE-8-16_LOCAL_AUTHORITY_BOUNDARIESDrawing · PDF | 4 Aug 2023 | View |
| FIGURE-8-17_45KM_STATUTORY_LANDSCAPE_DESIGNATIONS_AONB_NATIONAL_PARK_WORLD_HERITDrawing · PDF | 4 Aug 2023 | View |
| FIGURE-8-18_45KM_STATUTORY_LANDSCAPE_DESIGNATIONS_PARKS_&_GARDENSDrawing · PDF | 4 Aug 2023 | View |
| FIGURE-8-19_15KM_STATUTORY_LANDSCAPE_DESIGNATIONSDrawing · PDF | 4 Aug 2023 | View |
| FIGURE-8-20_45KM_NON-STATUTORY_LANDSCAPE_DESIGNATIONS_SPECIAL_LANDSCAPE_AREASDrawing · PDF | 4 Aug 2023 | View |
| FIGURE-8-21_15KM_NON-STATUTORY_LANDSCAPE_DESIGNATIONS_SPECIAL_LANDSCAPE_AREASDrawing · PDF | 4 Aug 2023 | View |
| FIGURE-8-22_45KM_NON-STATUTORY_LANDSCAPE_DESIGNATIONS_VILLS_HERITAGE_COAST_HISTODrawing · PDF | 4 Aug 2023 | View |
| FIGURE-8-23_15KM_NON-STATUTORY_LANDSCAPE_DESIGNATIONS_VILLS_HERITAGE_COAST_HISTODrawing · PDF | 4 Aug 2023 | View |
| FIGURE-8-24_45KM_TRANSPORT_MOVEMENT_ACCESSDrawing · PDF | 4 Aug 2023 | View |
| FIGURE-8-25_15KM_TRANSPORT_MOVEMENT_ACCESSDrawing · PDF | 4 Aug 2023 | View |
| FIGURE-8-26_LANDMAP_GN46_GEOLOGICAL_LANDSCAPE_CLASSIFICATIONDrawing · PDF | 4 Aug 2023 | View |
| FIGURE-8-27_LANDMAP_GN46_GEOLOGICAL_LANDSCAPE_EVALUATIONDrawing · PDF | 4 Aug 2023 | View |
| FIGURE-8-28_LANDMAP_GN46_LANDSCAPE_HABITAT_CLASSIFICATIONDrawing · PDF | 4 Aug 2023 | View |
| FIGURE-8-29_LANDMAP_GN46_LANDSCAPE_HABITAT_EVALUATIONDrawing · PDF | 4 Aug 2023 | View |
| FIGURE-8-30_LANDMAP_GN46_VISUAL_AND_SENSORY_CLASSIFICATIONDrawing · PDF | 4 Aug 2023 | View |
| FIGURE-8-31_LANDMAP_GN46_VISUAL_AND_SENSORY_EVALUATIONDrawing · PDF | 4 Aug 2023 | View |
| FIGURE-8-32_LANDMAP_GN46_HISTORIC_LANDSCAPE_CLASSIFICATIONDrawing · PDF | 4 Aug 2023 | View |
| FIGURE-8-33_LANDMAP_GN46_HISTORIC_LANDSCAPE_EVALUATIONDrawing · PDF | 4 Aug 2023 | View |
| FIGURE-8-34_LANDMAP_GN46_CULTURAL_LANDSCAPE_SERVICES_CLASSIFICATIONDrawing · PDF | 4 Aug 2023 | View |
| FIGURE-8-35_LANDSCAPE_CHARACTER_AREAS_WITH_THEORETICAL_VISIBILITYDrawing · PDF | 4 Aug 2023 | View |
| FIGURE-8-36_LANDSCAPE_CHARACTER_AREAS_POTENTIAL_SIGNIFICANT_EFFECTSDrawing · PDF | 4 Aug 2023 | View |
| FIGURE-8-37A_-_5-60F_VIEWPOINT_WIRELINES_MONTAGESDrawing · PDF | 4 Aug 2023 | View |
| FIGURE-8-66_RVAA_PROPERTIES_SETTLEMENT_GROUPS (1)Drawing · PDF | 4 Aug 2023 | View |
| FIGURE-8-67A_-_8-88D_RVAA_WIRELINESDrawing · PDF | 4 Aug 2023 | View |
| MANMOEL NIGHTTIME ASSESSMENT - PLAN 1 - VIEWPOINT LOCATIONS (1)Drawing · PDF | 4 Aug 2023 | View |
| MANMOEL NIGHTTIME ASSESSMENT FIGURES 1.1-1.3Drawing · PDF | 4 Aug 2023 | View |
| MANMOEL NIGHTTIME ASSESSMENT FIGURES 2.1-2.3Drawing · PDF | 4 Aug 2023 | View |
| MANMOEL NIGHTTIME ASSESSMENT FIGURES 3.1-3.3Drawing · PDF | 4 Aug 2023 | View |
| MANMOEL NIGHTTIME ASSESSMENT FIGURES 4.1-4.3Drawing · PDF | 4 Aug 2023 | View |
| MANMOEL NIGHTTIME ASSESSMENT FIGURES 5.1-5.3Drawing · PDF | 4 Aug 2023 | View |
| FIGURE 9.3 LISTED BUILDINGS & RPGS WITHIN 2 KMDrawing | 4 Aug 2023 | View |
| FIGURE 9.4 SCHEDULED MONUMENTS WITHIN 5 KMDrawing | 4 Aug 2023 | View |
| VOLUME 2 FIGURE 9.1 HISTORIC ASSETS FOR GGAT HER WITHIN AND ADJACENT TO SITEDrawing · PDF | 4 Aug 2023 | View |
| VOLUME 2 FIGURE 9.2 HISTORIC ASSESTS FROM WITHOIN NMRW WITHIN AND ADJACENT TO SIDrawing · PDF | 4 Aug 2023 | View |
| FIGURE 10.4 POTENTIAL GWDTEDrawing · PDF | 4 Aug 2023 | View |
| MANMOEL WIND FARM ES - HYDROLOGY - CHAPTER 10 - FIGURE 10.1 HYDROLOGY OVERVIEWDrawing · PDF | 4 Aug 2023 | View |
| MANMOEL WIND FARM ES - HYDROLOGY - CHAPTER 10 - FIGURE 10.2 TOPGRAPHIC WETNESS IDrawing · PDF | 4 Aug 2023 | View |
| MANMOEL WIND FARM ES - HYDROLOGY - CHAPTER 10 - FIGURE 10.3 FLOW ACCUMULATIONDrawing · PDF | 4 Aug 2023 | View |
| FIGURE 11.1 STUDY AREADrawing · PDF | 4 Aug 2023 | View |
| FIGURE 11.2 INJURY ACCIDENT LOCATIONS AND SEVERITYDrawing · PDF | 4 Aug 2023 | View |
| FIGURE 11.3 CONSTRUCTION TRAFFIC DISTRIBUTIONDrawing · PDF | 4 Aug 2023 | View |
| MANMOEL EIA VOLUME 2 SUPPORTING FIGURES AND VISUALISATIONS - FRONT COVERReport · PDF | 4 Aug 2023 | View |
| MANMOEL EIA VOLUME 2 SUPPORTING FIGURES AND VISUALISATIONS - PREFACEReport · PDF | 4 Aug 2023 | View |
| MANMOEL EIA CHAPTER 8 FOR NRW - FRONT COVERReport · PDF | 4 Aug 2023 | View |
| MANMOEL EIA VOLUME 1 WRITTEN STATEMENT - FRONT COVERReport · PDF | 4 Aug 2023 | View |
| MANMOEL EIA VOLUME 1 WRITTEN STATEMENT - PREFACEReport · PDF | 4 Aug 2023 | View |
| MANMOEL ES - CHAPTER 16 - RESIDUAL EFFECTS, MITIGATION AND ENHANCEMENTReport · PDF | 4 Aug 2023 | View |
| MANMOEL WIND FARM ES - CHAPTER 1 - INTRODUCTIONReport · PDF | 4 Aug 2023 | View |
| MANMOEL WIND FARM ES - CHAPTER 2 - LEGAL AND POLICY CONTEXTReport · PDF | 4 Aug 2023 | View |
| MANMOEL WIND FARM ES - CHAPTER 3 - APPROACH TO EIAReport · PDF | 4 Aug 2023 | View |
| MANMOEL WIND FARM ES - CHAPTER 4 - SITE SELECTION AND DESIGN EVOLUTIONReport · PDF | 4 Aug 2023 | View |
| MANMOEL WIND FARM ES - CHAPTER 5 - PROJECT DESCRIPTIONReport · PDF | 4 Aug 2023 | View |
| MANMOEL WIND FARM ES - CHAPTER 6 - ECOLOGYReport · PDF | 4 Aug 2023 | View |
| MANMOEL WIND FARM ES - CHAPTER 7 - ORNITHOLOGY ASSESSMENTReport · PDF | 4 Aug 2023 | View |
| MANMOEL WIND FARM ES - CHAPTER 8 - LANDSCAPE AND VISUAL IMPACTReport · PDF | 4 Aug 2023 | View |
| MANMOEL WIND FARM ES - CHAPTER 9 - CULTURAL HERITAGEReport · PDF | 4 Aug 2023 | View |
| MANMOEL WIND FARM ES - CHAPTER 10 - HYDROLOGY, GEOLOGY AND HYDROGEOLOGICALReport · PDF | 4 Aug 2023 | View |
| MANMOEL WIND FARM ES - CHAPTER 10 - HYDROLOGY, GEOLOGY AND HYDROGEOLOGICALReport · PDF | 4 Aug 2023 | View |
| MANMOEL WIND FARM ES - CHAPTER 11 - TRAFFIC AND TRANSPORTReport · PDF | 4 Aug 2023 | View |
| MANMOEL WIND FARM ES - CHAPTER 12 - NOISEReport · PDF | 4 Aug 2023 | View |
| MANMOEL WIND FARM ES - CHAPTER 13 - HEALTH AND PUBLIC SAFETYReport · PDF | 4 Aug 2023 | View |
| MANMOEL WIND FARM ES - CHAPTER 14 - AVIATION AND EXISTING INFRASTRUCTURE ASSESSMReport · PDF | 4 Aug 2023 | View |
| MANMOEL WIND FARM ES - CHAPTER 15 - SOCIOECONOMICSReport · PDF | 4 Aug 2023 | View |
| FIGURE 1-2 SITE LAYOUT PLANOS Extract · PDF | 4 Aug 2023 | View |
| MANMOEL SECONDARY CONSENT MAPSDrawing · PDF | 4 Aug 2023 | View |
| SITE LOCATION PLANOS Extract · PDF | 4 Aug 2023 | View |
| S16 TO DE-REGISTER AND RELEASE COMMON LANDReport · PDF | 4 Aug 2023 | View |
| S138 APPLICATION FOR CONSENT TO CONSTRUCT WORKS ON COMMON LANDReport · PDF | 4 Aug 2023 | View |
Documents open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.