Council planning record

Construct and operate up to 5 turbines of up to 180m maximum tip height and associated crane hardstandings, transformers housed adjacent or in turbines, on-site access tracks plus underground cable runs alongside, an on-site sub-station building, construction compound(s) and access into the site boundary

Land At Grid Ref 316516 205934 Manmoel Road Manmoel

DecidedReference: 23/0529/DNSCaerphilly County Borough Council

Last published check: 28 Sept 2026, 21:19. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Standard Consultation Date

    Published milestoneCouncil source
  5. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Decision Issued Date

    Published milestoneCouncil source
  7. Decision Made Date

    Published milestoneCouncil source
  8. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided
Application type
Development of National Significance
Received
4 Aug 2023
Validated
4 Aug 2023
Determination deadline
29 Sept 2023
Local authority
Caerphilly County Borough Council

Application overview

Construct and operate up to 5 turbines of up to 180m maximum tip height and associated crane hardstandings, transformers housed adjacent or in turbines, on-site access tracks plus underground cable runs alongside, an on-site sub-station building, construction compound(s) and access into the site boundary

Proposal details

Reference
23/0529/DNS
Alternative references
3239181
Ward
Argoed
Agent
Natural Power Consultants Limited

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Land At Grid Ref 316516 205934 Manmoel Road Manmoel

This record has no verified map location.

View council map

Documents 192 of 192

DocumentPublishedAction
WELSH MINISTERS LETTERCorrespondence · PDF15 Oct 2024View
INSPECTORS REPORT - WELSH VERSIONCorrespondence · PDF15 Oct 2024View
INSPECTORS REPORTCorrespondence · PDF15 Oct 2024View
TAFLEN-LEAFLET HCCorrespondence · PDF15 Oct 2024View
WELSH MINISTERS DECISION LETTERDecision · PDF15 Oct 2024View
WELSH MINISTERS LETTERCorrespondence · PDF30 Jul 2024View
ACKNOWLEDGEMENT LETTERCorrespondence5 Jun 2024View
TURBINE DELIVERY ROUTE APPRAISAL REVISION SUMMARYOther · PDF13 Mar 2024View
TURBINE DELIVERY ROUTE APPRAISALReport · PDF13 Mar 2024View
TURBINE DELIVERY ROUTE APPRAISALReport · PDF13 Mar 2024View
MINERALS POLICY PEDW RESPONSE (REPORT - 1338023 - 1 - A1) - 1Report · PDF13 Mar 2024View
MANMOEL WIND FARM UPDATES TO PPW CHAPER 6 (CORRESPOND - 1337601 - 1 - B1) - 1Correspondence · PDF13 Mar 2024View
MANMOEL WIND FARM UPDATES TO PPW CHAPER 6 (CORRESPOND - 1337601 - 1 - B1) - 1Drawing · PDF13 Mar 2024View
MANMOEL COMMON LAND REPORTReport · PDF13 Mar 2024View
HYDROLOGY MANMOEL EMReport · PDF13 Mar 2024View
FIGURE-8-37A_-_5-60F_VIEWPOINT_WIRELINES_MONTAGES_OCT-2023Photo · PDF13 Mar 2024View
COPY OF ECOLOGY ORNITHOLOGY PEDW RESPONSE (CORRESPOND - 1332438 - 1 - A4) - 1Report · PDF13 Mar 2024View
CHAPTER 8 LVIA WITH RED AMENDS FOR SUBMISSION TO INSPECTOR (REPORT - 1338016 - 1Report · PDF13 Mar 2024View
APPENDIX 8 LVIA WITH RED AMENDS FOR INSPECTOR (REPORT - 1338015 - 1 - A4) - 1Report · PDF13 Mar 2024View
231024 CPAT RESPONSE TO BGCBCCorrespondence · PDF13 Mar 2024View
231019_22_0191 RESPONSE TO CCBC LIR NOISECorrespondence · PDF13 Mar 2024View
WAG COMMENTSConsultee Comment4 Mar 2024View
LETTER FROM PEDWCorrespondence · PDF5 Jan 2024View
FURTHER INFO - RESPONSE ON MINERALS POLICY - UPDATED REPORTReport · PDF5 Jan 2024View
FURTHER INFO - TURBINE DELIVERY ROUTE APPRAISAL - REVISION DReport · PDF5 Jan 2024View
FURTHER INFO - CRUGLWYN TURBINES - DECISION - 17 0521 FULLDecision · PDF6 Dec 2023View
FURTHER INFO - CRUGLWYN TURBINES - APPROVED PLANDrawing · PDF6 Dec 2023View
FURTHER INFO - CRUGLWYN TURBINES - APPROVED PLANDrawing · PDF6 Dec 2023View
FURTHER INFO - CRUGLWYN TURBINES - DECISION - 14 0761 FULLDecision · PDF6 Dec 2023View
FURTHER INFO - CRUGLWYN TURBINES - GENERAL ARRANGEMENT PLANDrawing · PDF6 Dec 2023View
FURTHER INFO - CRUGLWYN TURBINES - INDICATIVE SWITCHROOMDrawing · PDF6 Dec 2023View
FURTHER INFO - CRUGLWYN TURBINES - LOCATION PLANDrawing · PDF6 Dec 2023View
FURTHER INFO - PLANNING STATEMENT AND DRAWINGSReport · PDF6 Dec 2023View
FURTHER INFO - CRUGLWYN TURBINES - TURBINE ELEVATIONReport · PDF6 Dec 2023View
FURTHER INFO - CCBC AND BGCBC DRAFT PROPOSED CONDITIONSCorrespondence · PDF6 Dec 2023View
FURTHER INFO -AMENDED APPENDIX 8 LVIAReport · PDF6 Dec 2023View
FURTHER INFO - AMENDED CHAPTER 8 LVIAReport · PDF6 Dec 2023View
FURTHER INFO - APPLICANT ECOLOGY AND ORNITHOLOGY RESPONSE TO PEDWReport · PDF6 Dec 2023View
FURTHER INFO - APPLICANT HYDROLOGY RESPONSE TO PEDWReport · PDF6 Dec 2023View
FURTHER INFO - APPLICANT RESPONSE ON UPDATES TO PPW CHAPTER 6Report · PDF6 Dec 2023View
FURTHER INFO - APPLICANT RESPONSE TO CCBC LIR NOISEReport · PDF6 Dec 2023View
FURTHER INFO -APPLICANT RESPONSE TO PEDW NOVEMBER 2023Correspondence · PDF6 Dec 2023View
FURTHER INFO -CPAT RESPONSE TO BGCBCConsultee Comment · PDF6 Dec 2023View
FURTHER INFO - MANMOEL COMMON LAND REPORT AMENDED NOV 23Report · PDF6 Dec 2023View
FURTHER INFO - MANMOEL PEAT INTERPOLATION MAPDrawing · PDF6 Dec 2023View
FURTHER INFO - TURBINE DELIVERY ROUTE APPRAISAL REVISION SUMMARYReport · PDF6 Dec 2023View
ECOLOGY COMMENTSConsultee Comment7 Sept 2023View
ECOLOGY COMMENTSConsultee Comment7 Sept 2023View
ECOLOGIST COMMENTSConsultee Comment · PDF7 Sept 2023View
LANDSCAPE OFFICER COMMENTSConsultee Comment · PDF1 Sept 2023View
LANDSCAPE REVIEW DOCUMENTConsultee Comment · PDF1 Sept 2023View
ENVIRONMENTAL HEALTH OFFICER COMMENTSConsultee Comment · PDF30 Aug 2023View
TRANSPORTATION ENGINEERING MANAGER COMMENTSConsultee Comment · PDF29 Aug 2023View
CHIEF FIRE OFFICER COMMENTSConsultee Comment · PDF21 Aug 2023View
SENIOR DRAINAGE ENGINEER COMMENTSConsultee Comment · PDF14 Aug 2023View
GLAMORGAN-GWENT ARCHAEOLOGICAL TRUST COMMENTSConsultee Comment · PDF11 Aug 2023View
PROW COMMENTSConsultee Comment · PDF11 Aug 2023View
LPAS CONFIRMATION OF RECEIPTCorrespondence · PDF7 Aug 2023View
LETTER EXTENDING ACCEPTANCE PERIOD - MANMOELCorrespondence · PDF7 Aug 2023View
APPLICATION FORMApplication Form · PDF4 Aug 2023View
MANMOEL WIND FARM DESIGN AND ACCESS STATEMENTReport · PDF4 Aug 2023View
SUPPORTING DOCUMENTATION - PRE-APPLICATION CONSULTATION (PAC) REPORTReport · PDF4 Aug 2023View
PLANNING STATEMENTReport · PDF4 Aug 2023View
LPAS CONFIRMATION OF RECEIPTCorrespondence · PDF4 Aug 2023View
MANMOEL LIST OF DOCUMENTSReport · PDF4 Aug 2023View
MANMOEL WIND FARM SECONDARY CONSENT STATEMENTReport · PDF4 Aug 2023View
MANMOEL WIND FARM SECTION 106 WRITTEN STATEMENTReport · PDF4 Aug 2023View
SUPPLEMENTARY IMPACT ASSESSMENTReport · PDF4 Aug 2023View
MANMOEL SITE NOTICESCorrespondence · PDF4 Aug 2023View
2023-08-04 - EXNOTE001 -ACCEPTANCE OF APPLICATIONCorrespondence · PDF4 Aug 2023View
2023-08-04 - EXNOTE 001 - ACCEPTANCE OF APPLICATIONCorrespondence · PDF4 Aug 2023View
MANMOEL EIA VOLUME 4 NON-TECHNICAL SUMMARY (NTS) - FRONT COVERReport · PDF4 Aug 2023View
MANMOEL EIA VOLUME 4 NON-TECHNICAL SUMMARY (NTS) - PREFACEReport · PDF4 Aug 2023View
MANMOEL WIND FARM NON-TECHNICAL SUMMARY (NTS)Report · PDF4 Aug 2023View
MANMOEL EIA VOLUME 3 APPENDICES - FRONT COVERReport · PDF4 Aug 2023View
MANMOEL EIA VOLUME 3 APPENDICES - PREFACEReport · PDF4 Aug 2023View
MANMOEL ES APPENDIX 8 - LANDSCAPE AND VISUAL IMPACT ASSESSMENTReport · PDF4 Aug 2023View
MANMOEL ES APPENDIX 9 - CULTURAL HERITAGE ASSESSMENTReport · PDF4 Aug 2023View
MANMOEL WIND FARM ES - APPENDIX 11 - TRAFFIC AND TRANSPORTReport · PDF4 Aug 2023View
MANMOEL WIND FARM ES - APPENDIX 12 - NOISEReport · PDF4 Aug 2023View
MANMOEL WIND FARM ES - APPENDIX 13 - HEALTH AND PUBLIC SAFETYReport · PDF4 Aug 2023View
MANMOEL WIND FARM ES - APPENDIX 14 - AVIATION & EXISTING INFRASTRUCTUREReport · PDF4 Aug 2023View
MANMOEL WIND FARM ES - APPENDIX A3 - APPROACH TO EIAReport · PDF4 Aug 2023View
MANMOEL WIND FARM ES - APPENDIX A6 - ECOLOGYReport · PDF4 Aug 2023View
MANMOEL WIND FARM ES - APPENDIX A7 - ORNITHOLOGYReport · PDF4 Aug 2023View
MANMOEL WIND FARM ES - APPENDIX A10 - HYDROLOGY, GEOLOGY AND HYDROGEOLOGYReport · PDF4 Aug 2023View
MANMOEL WIND FARM ES - CHAPTER 1 - FIGURE 1.1 REGIONAL CONTEXTDrawing · PDF4 Aug 2023View
MANMOEL WIND FARM ES - CHAPTER 1 - FIGURE 1.2 SITE LAYOUTDrawing · PDF4 Aug 2023View
MANMOEL WIND FARM ES - CHAPTER 4 - FIGURE 4.1 CONSTRAINTS TO SITE DESIGNDrawing · PDF4 Aug 2023View
FIGURE 6.1 SITE AND ECOLOGICAL SURVEY AREASDrawing · PDF4 Aug 2023View
FIGURE 6.2 STATIC BAT DETECTOR LOCATIONSDrawing · PDF4 Aug 2023View
FIGURE 6.3 GREAT CRESTED NEWT SURVEY LOCATIONSDrawing · PDF4 Aug 2023View
FIGURE 6.4 STATUTORY DESIGNATED SITES WITH ECOLOGICAL INTERESTDrawing · PDF4 Aug 2023View
FIGURE 6.5 NON-STATUTORY DESIGNATED SITES WITH ECOLOGICAL INTERESTDrawing · PDF4 Aug 2023View
FIGURE 6.6 PRELIMINARY BAT ROOST ASSESSMENT RESULTS 2020Drawing · PDF4 Aug 2023View
FIGURE 6.7 PHASE 1 SURVEY RESULTS 2020-2021Drawing · PDF4 Aug 2023View
FIGURE 6.8 NVC HABITAT SURVEY RESULTS 2020-2021Drawing · PDF4 Aug 2023View
FIGURE A.1 HABITAT MANAGEMENT AREA - PHASE 1 HABITATSDrawing · PDF4 Aug 2023View
FIGURE 7.1 SITE AND ORNITHOLOGICAL SURVEY AREASDrawing · PDF4 Aug 2023View
FIGURE 7.2 VP LOCATIONS AND VIEWSHEDSDrawing · PDF4 Aug 2023View
FIGURE 7.3 DESIGNATED ORNITHOLOGICAL SITES WITHIN DESK STUDY SEARCH AREASDrawing · PDF4 Aug 2023View
FIGURE 7.4 VP SURVEY RESULTS BREEDING SEASON 2020 (MARCH TO AUGUST) - RAPTORSDrawing · PDF4 Aug 2023View
FIGURE 7.5 VP SURVEY RESULTS BREEDING SEASON 2021 (MARCH TO AUGUST) - RAPTORSDrawing · PDF4 Aug 2023View
FIGURE 7.6 VP SURVEY RESULTS BREEDING SEASON 2020 (MARCH TO AUGUST) - GULLSDrawing · PDF4 Aug 2023View
FIGURE 7.7 VP SURVEY RESULTS BREEDING SEASON 2021 (MARCH TO AUGUST) - GULLSDrawing · PDF4 Aug 2023View
FIGURE 7.8 VP SURVEY RESULTS NON-BREEDING SEASON (SEPTEMBER 2019 TO FEBRUARY 202Drawing · PDF4 Aug 2023View
FIGURE 7.9 VP SURVEY RESULTS NON-BREEDING SEASON (SEPTEMBER 2020 TO FEBRUARY 202Drawing · PDF4 Aug 2023View
FIGURE 7.10 RAPTOR SURVEY RESULTS 2020 AND 2021Drawing · PDF4 Aug 2023View
FIGURE 7.11 NIGHTJAR SURVEY RESULTS 2020 AND 2021Drawing · PDF4 Aug 2023View
FIGURE-8-1_45KM_ZTV_TIP_HEIGHTDrawing · PDF4 Aug 2023View
FIGURE-8-2_15KM_ZTV_TIP_HEIGHTDrawing · PDF4 Aug 2023View
FIGURE-8-3_45KM_ZTV_HUB_HEIGHTDrawing · PDF4 Aug 2023View
FIGURE-8-4_15KM_ZTV_HUB_HEIGHTDrawing · PDF4 Aug 2023View
FIGURE-8-5_CUMULATIVE_WINDFARM_LOCATIONDrawing · PDF4 Aug 2023View
FIGURE-8-6_45KM_CUMULATIVE_WINDFARM_ZTV_OPERATIONALDrawing · PDF4 Aug 2023View
FIGURE-8-7_15KM_CUMULATIVE_WINDFARM_ZTV_OPERATIONALDrawing · PDF4 Aug 2023View
FIGURE-8-8_45KM_CUMULATIVE_WINDFARM_ZTV_CONSENTEDDrawing · PDF4 Aug 2023View
FIGURE-8-9_15KM_CUMULATIVE_WINDFARM_ZTV_CONSENTEDDrawing · PDF4 Aug 2023View
FIGURE-8-10_45KM_CUMULATIVE_WINDFARM_ZTV_SUBMITTEDDrawing · PDF4 Aug 2023View
FIGURE-8-11_15KM_CUMULATIVE_WINDFARM_ZTV_SUBMITTEDDrawing · PDF4 Aug 2023View
FIGURE-8-12_45KM_CUMULATIVE_WINDFARM_ZTV_SCOPING (1)Drawing · PDF4 Aug 2023View
FIGURE-8-13_15KM_CUMULATIVE_WINDFARM_ZTV_SCOPINGDrawing · PDF4 Aug 2023View
FIGURE-8-14_45KM_CUMULATIVE_NON_WIND_FARM_DEVELOPMENT_LOCATION_PLAN (1)Drawing · PDF4 Aug 2023View
FIGURE-8-15_15KM_CUMULATIVE_NON_WIND_FARM_DEVELOPMENT_LOCATION_PLANDrawing · PDF4 Aug 2023View
FIGURE-8-16_LOCAL_AUTHORITY_BOUNDARIESDrawing · PDF4 Aug 2023View
FIGURE-8-17_45KM_STATUTORY_LANDSCAPE_DESIGNATIONS_AONB_NATIONAL_PARK_WORLD_HERITDrawing · PDF4 Aug 2023View
FIGURE-8-18_45KM_STATUTORY_LANDSCAPE_DESIGNATIONS_PARKS_&_GARDENSDrawing · PDF4 Aug 2023View
FIGURE-8-19_15KM_STATUTORY_LANDSCAPE_DESIGNATIONSDrawing · PDF4 Aug 2023View
FIGURE-8-20_45KM_NON-STATUTORY_LANDSCAPE_DESIGNATIONS_SPECIAL_LANDSCAPE_AREASDrawing · PDF4 Aug 2023View
FIGURE-8-21_15KM_NON-STATUTORY_LANDSCAPE_DESIGNATIONS_SPECIAL_LANDSCAPE_AREASDrawing · PDF4 Aug 2023View
FIGURE-8-22_45KM_NON-STATUTORY_LANDSCAPE_DESIGNATIONS_VILLS_HERITAGE_COAST_HISTODrawing · PDF4 Aug 2023View
FIGURE-8-23_15KM_NON-STATUTORY_LANDSCAPE_DESIGNATIONS_VILLS_HERITAGE_COAST_HISTODrawing · PDF4 Aug 2023View
FIGURE-8-24_45KM_TRANSPORT_MOVEMENT_ACCESSDrawing · PDF4 Aug 2023View
FIGURE-8-25_15KM_TRANSPORT_MOVEMENT_ACCESSDrawing · PDF4 Aug 2023View
FIGURE-8-26_LANDMAP_GN46_GEOLOGICAL_LANDSCAPE_CLASSIFICATIONDrawing · PDF4 Aug 2023View
FIGURE-8-27_LANDMAP_GN46_GEOLOGICAL_LANDSCAPE_EVALUATIONDrawing · PDF4 Aug 2023View
FIGURE-8-28_LANDMAP_GN46_LANDSCAPE_HABITAT_CLASSIFICATIONDrawing · PDF4 Aug 2023View
FIGURE-8-29_LANDMAP_GN46_LANDSCAPE_HABITAT_EVALUATIONDrawing · PDF4 Aug 2023View
FIGURE-8-30_LANDMAP_GN46_VISUAL_AND_SENSORY_CLASSIFICATIONDrawing · PDF4 Aug 2023View
FIGURE-8-31_LANDMAP_GN46_VISUAL_AND_SENSORY_EVALUATIONDrawing · PDF4 Aug 2023View
FIGURE-8-32_LANDMAP_GN46_HISTORIC_LANDSCAPE_CLASSIFICATIONDrawing · PDF4 Aug 2023View
FIGURE-8-33_LANDMAP_GN46_HISTORIC_LANDSCAPE_EVALUATIONDrawing · PDF4 Aug 2023View
FIGURE-8-34_LANDMAP_GN46_CULTURAL_LANDSCAPE_SERVICES_CLASSIFICATIONDrawing · PDF4 Aug 2023View
FIGURE-8-35_LANDSCAPE_CHARACTER_AREAS_WITH_THEORETICAL_VISIBILITYDrawing · PDF4 Aug 2023View
FIGURE-8-36_LANDSCAPE_CHARACTER_AREAS_POTENTIAL_SIGNIFICANT_EFFECTSDrawing · PDF4 Aug 2023View
FIGURE-8-37A_-_5-60F_VIEWPOINT_WIRELINES_MONTAGESDrawing · PDF4 Aug 2023View
FIGURE-8-66_RVAA_PROPERTIES_SETTLEMENT_GROUPS (1)Drawing · PDF4 Aug 2023View
FIGURE-8-67A_-_8-88D_RVAA_WIRELINESDrawing · PDF4 Aug 2023View
MANMOEL NIGHTTIME ASSESSMENT - PLAN 1 - VIEWPOINT LOCATIONS (1)Drawing · PDF4 Aug 2023View
MANMOEL NIGHTTIME ASSESSMENT FIGURES 1.1-1.3Drawing · PDF4 Aug 2023View
MANMOEL NIGHTTIME ASSESSMENT FIGURES 2.1-2.3Drawing · PDF4 Aug 2023View
MANMOEL NIGHTTIME ASSESSMENT FIGURES 3.1-3.3Drawing · PDF4 Aug 2023View
MANMOEL NIGHTTIME ASSESSMENT FIGURES 4.1-4.3Drawing · PDF4 Aug 2023View
MANMOEL NIGHTTIME ASSESSMENT FIGURES 5.1-5.3Drawing · PDF4 Aug 2023View
FIGURE 9.3 LISTED BUILDINGS & RPGS WITHIN 2 KMDrawing4 Aug 2023View
FIGURE 9.4 SCHEDULED MONUMENTS WITHIN 5 KMDrawing4 Aug 2023View
VOLUME 2 FIGURE 9.1 HISTORIC ASSETS FOR GGAT HER WITHIN AND ADJACENT TO SITEDrawing · PDF4 Aug 2023View
VOLUME 2 FIGURE 9.2 HISTORIC ASSESTS FROM WITHOIN NMRW WITHIN AND ADJACENT TO SIDrawing · PDF4 Aug 2023View
FIGURE 10.4 POTENTIAL GWDTEDrawing · PDF4 Aug 2023View
MANMOEL WIND FARM ES - HYDROLOGY - CHAPTER 10 - FIGURE 10.1 HYDROLOGY OVERVIEWDrawing · PDF4 Aug 2023View
MANMOEL WIND FARM ES - HYDROLOGY - CHAPTER 10 - FIGURE 10.2 TOPGRAPHIC WETNESS IDrawing · PDF4 Aug 2023View
MANMOEL WIND FARM ES - HYDROLOGY - CHAPTER 10 - FIGURE 10.3 FLOW ACCUMULATIONDrawing · PDF4 Aug 2023View
FIGURE 11.1 STUDY AREADrawing · PDF4 Aug 2023View
FIGURE 11.2 INJURY ACCIDENT LOCATIONS AND SEVERITYDrawing · PDF4 Aug 2023View
FIGURE 11.3 CONSTRUCTION TRAFFIC DISTRIBUTIONDrawing · PDF4 Aug 2023View
MANMOEL EIA VOLUME 2 SUPPORTING FIGURES AND VISUALISATIONS - FRONT COVERReport · PDF4 Aug 2023View
MANMOEL EIA VOLUME 2 SUPPORTING FIGURES AND VISUALISATIONS - PREFACEReport · PDF4 Aug 2023View
MANMOEL EIA CHAPTER 8 FOR NRW - FRONT COVERReport · PDF4 Aug 2023View
MANMOEL EIA VOLUME 1 WRITTEN STATEMENT - FRONT COVERReport · PDF4 Aug 2023View
MANMOEL EIA VOLUME 1 WRITTEN STATEMENT - PREFACEReport · PDF4 Aug 2023View
MANMOEL ES - CHAPTER 16 - RESIDUAL EFFECTS, MITIGATION AND ENHANCEMENTReport · PDF4 Aug 2023View
MANMOEL WIND FARM ES - CHAPTER 1 - INTRODUCTIONReport · PDF4 Aug 2023View
MANMOEL WIND FARM ES - CHAPTER 2 - LEGAL AND POLICY CONTEXTReport · PDF4 Aug 2023View
MANMOEL WIND FARM ES - CHAPTER 3 - APPROACH TO EIAReport · PDF4 Aug 2023View
MANMOEL WIND FARM ES - CHAPTER 4 - SITE SELECTION AND DESIGN EVOLUTIONReport · PDF4 Aug 2023View
MANMOEL WIND FARM ES - CHAPTER 5 - PROJECT DESCRIPTIONReport · PDF4 Aug 2023View
MANMOEL WIND FARM ES - CHAPTER 6 - ECOLOGYReport · PDF4 Aug 2023View
MANMOEL WIND FARM ES - CHAPTER 7 - ORNITHOLOGY ASSESSMENTReport · PDF4 Aug 2023View
MANMOEL WIND FARM ES - CHAPTER 8 - LANDSCAPE AND VISUAL IMPACTReport · PDF4 Aug 2023View
MANMOEL WIND FARM ES - CHAPTER 9 - CULTURAL HERITAGEReport · PDF4 Aug 2023View
MANMOEL WIND FARM ES - CHAPTER 10 - HYDROLOGY, GEOLOGY AND HYDROGEOLOGICALReport · PDF4 Aug 2023View
MANMOEL WIND FARM ES - CHAPTER 10 - HYDROLOGY, GEOLOGY AND HYDROGEOLOGICALReport · PDF4 Aug 2023View
MANMOEL WIND FARM ES - CHAPTER 11 - TRAFFIC AND TRANSPORTReport · PDF4 Aug 2023View
MANMOEL WIND FARM ES - CHAPTER 12 - NOISEReport · PDF4 Aug 2023View
MANMOEL WIND FARM ES - CHAPTER 13 - HEALTH AND PUBLIC SAFETYReport · PDF4 Aug 2023View
MANMOEL WIND FARM ES - CHAPTER 14 - AVIATION AND EXISTING INFRASTRUCTURE ASSESSMReport · PDF4 Aug 2023View
MANMOEL WIND FARM ES - CHAPTER 15 - SOCIOECONOMICSReport · PDF4 Aug 2023View
FIGURE 1-2 SITE LAYOUT PLANOS Extract · PDF4 Aug 2023View
MANMOEL SECONDARY CONSENT MAPSDrawing · PDF4 Aug 2023View
SITE LOCATION PLANOS Extract · PDF4 Aug 2023View
S16 TO DE-REGISTER AND RELEASE COMMON LANDReport · PDF4 Aug 2023View
S138 APPLICATION FOR CONSENT TO CONSTRUCT WORKS ON COMMON LANDReport · PDF4 Aug 2023View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Granted
WELSH MINISTERS DECISION LETTER FURTHER INFO - CRUGLWYN TURBINES - DECISION - 17 0521 FULL FURTHER INFO - CRUGLWYN TURBINES - DECISION - 14 0761 FULL
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.