Council planning record

Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture

Twyn Hywel Energy Park Land North-West Of Caerphilly

DecidedReference: 23/0427/DNSCaerphilly County Borough Council

Last published check: 28 Sept 2026, 21:22. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Decision Issued Date

    Published milestoneCouncil source
  7. Decision Made Date

    Published milestoneCouncil source
  8. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided
Application type
Development of National Significance
Received
1 Jun 2023
Validated
4 Aug 2023
Determination deadline
29 Sept 2023
Local authority
Caerphilly County Borough Council

Application overview

Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture

Proposal details

Reference
23/0427/DNS
Alternative references
DNS/3272053
Ward
Nelson
Agent
Savills

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Twyn Hywel Energy Park Land North-West Of Caerphilly

This record has no verified map location.

View council map

Documents 303 of 303

DocumentPublishedAction
TAFLEN-LEAFLET HCCorrespondence · PDF5 Nov 2024View
WELSH MINISTERS DECISION LETTERCorrespondence · PDF5 Nov 2024View
INSPECTORS REPORTCorrespondence · PDF5 Nov 2024View
ADRODDIAD YR AROLYGYDDCorrespondence · PDF5 Nov 2024View
DECISION NOTICE - VERSION 8Decision · PDF5 Nov 2024View
DECISION - VERSION 9Decision · PDF5 Nov 2024View
WELSH MINISTERS LETTERCorrespondence · PDF25 Sept 2024View
ADDITIONAL LANDSCAPE ARCHITECT COMMENTSConsultee Comment · PDF6 Dec 2023View
OBJECTION COMMENTS FROM NELSON COMMUNITY COUNCILObjection Comment · PDF8 Sept 2023View
ECOLOGIST OFFICER COMMENTSConsultee Comment · PDF6 Sept 2023View
POLICY COMMENTSConsultee Comment6 Sept 2023View
CONSERVATION OFFICER COMMENTSConsultee Comment · PDF1 Sept 2023View
PLACEMAKING COMMENTSConsultee Comment31 Aug 2023View
LANDSCAPE ARCHITECTS COMMENTSConsultee Comment · PDF30 Aug 2023View
LANDSCAPE REVIEWConsultee Comment · PDF30 Aug 2023View
TRANSPORTATION ENGINEERING MANAGER COMMENTSConsultee Comment · PDF29 Aug 2023View
GELLIGAER COMMUNITY COUNCIL COMMENTSConsultee Comment · PDF29 Aug 2023View
LLANBRADACH & PWLLYPANT COMMUNITY COUNCIL COMMENTSConsultee Comment · PDF29 Aug 2023View
COUNTRYSIDE AND RIGHTS OF WAYConsultee Comment · PDF25 Aug 2023View
ENVIRONMENTAL HEALTH COMMENTSConsultee Comment · PDF25 Aug 2023View
SENIOR ARBORICUTURAL OFFICER COMMENTSConsultee Comment · PDF24 Aug 2023View
SENIOR DRAINAGE ENGINEER COMMENTSConsultee Comment · PDF14 Aug 2023View
GLAMORGAN-GWENT ARCHAEOLOGICAL TRUST COMMENTSConsultee Comment · PDF11 Aug 2023View
ACCEPTANCE NOTICEOther · PDF4 Aug 2023View
AMENDED APPLICATION FORMApplication Form · PDF25 Jul 2023View
AMENDED 13.1_TH_COLLABORATIVE BENEFITS REPORT_VERSION2_24 7 23Report · PDF25 Jul 2023View
AMENDED 16 TWYN HYWEL DRAFT CONDITIONS & S106 V2Report · PDF25 Jul 2023View
STRATEGIC RECREATION FRAMEWORK PART 1 OF 9Report · PDF30 Jun 2023View
STRATEGIC RECREATION FRAMEWORK PART 2 OF 9Report · PDF30 Jun 2023View
STRATEGIC RECREATION FRAMEWORK PART 3 OF 9Report · PDF30 Jun 2023View
STRATEGIC RECREATION FRAMEWORK PART 4 OF 9Report · PDF30 Jun 2023View
STRATEGIC RECREATION FRAMEWORK PART 5 OF 9Report · PDF30 Jun 2023View
STRATEGIC RECREATION FRAMEWORK PART 6 OF 9Report · PDF30 Jun 2023View
STRATEGIC RECREATION FRAMEWORK PART 7 OF 9Report · PDF30 Jun 2023View
STRATEGIC RECREATION FRAMEWORK PART 8 OF 9Report · PDF30 Jun 2023View
STRATEGIC RECREATION FRAMEWORK PART 9 OF 9Report · PDF30 Jun 2023View
7.1_PART 1_CH4_PROJECT DESCRIPTION.Report · PDF27 Jun 2023View
FIG-30_VP30-PUBLIC FOOTPATH - TRACK LEADING UP TO MYNYDD LLANGYNIDR_20230313Drawing · PDF27 Jun 2023View
3.1.1 SITE LOCATION PLANOS Extract · PDF6 Jun 2023View
3.1.2 EXISTING COMMUNITIES, INFRASTRUCTURE AND CONSTRAINTSOS Extract · PDF6 Jun 2023View
ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMReport · PDF6 Jun 2023View
7.1 PART 1 INTRODUCTIONReport · PDF6 Jun 2023View
7.1 ENVIRONMENTAL STATEMENT VOLUME 1 - PART 1: CHAPTERS 1-6Report · PDF6 Jun 2023View
7.1_PART 1_CH2_APPROACH TO THE EIAReport · PDF6 Jun 2023View
7.1_PART 1_CH3_SITE SELECTION AND DESIGN STRATEGY.Report · PDF6 Jun 2023View
7.1_PART 1_CH5_ACCESS TRAFFIC AND TRANSPORReport · PDF6 Jun 2023View
7.1_PART 1_CH6_LVIAReport · PDF6 Jun 2023View
7.1_PART 1_CH4_PROJECT DESCRIPTIONReport · PDF6 Jun 2023View
9.1_PART 1_APPENDIX 1.2_GLOSSARY AND ABBREVIATIONSReport · PDF6 Jun 2023View
7.2_PART 2_0_FRONT COVER_PREFACE_CONTENTSReport · PDF6 Jun 2023View
7.2_PART 2_CH 7_GEOLOGY_HYDROLOGY_HYDROGEOLOGY_PEAT.Report · PDF6 Jun 2023View
7.2_PART 2_CH8_ECOLOGYReport · PDF6 Jun 2023View
7.3_PART 3_0_FRONT COVER_PREFACE_CONTENTS PAGEReport · PDF6 Jun 2023View
9.1_PART 1_APPENDIX 2.2_SCOPING DIRECTION.Report · PDF6 Jun 2023View
9.1_PART 1_APPENDIX 2.3_SCOPING RESPONSE TABLEReport · PDF6 Jun 2023View
7.3_PART 3_CH9_ORNITHOLOGYReport · PDF6 Jun 2023View
9.1_PART 1_APPENDIX 2.4_TELECOMMUNICATIONS IMPACT ASSESSMENTReport · PDF6 Jun 2023View
7.3_PART 3_CH10_NOISEReport · PDF6 Jun 2023View
7.3_PART 3_CH11_CULTURAL HERITAGEReport · PDF6 Jun 2023View
9.1_PART 1_APPENDIX 4.1_SCHEDULE OF MITIGATIONReport · PDF6 Jun 2023View
7.3_PART 3_CH12_MININGReport · PDF6 Jun 2023View
9.1_PART 1_APPENDIX 4.2_BORROW PIT APPRAISALReport · PDF6 Jun 2023View
7.3_PART 3_CH13_AVIATIONReport · PDF6 Jun 2023View
7.3_PART 3_CH14_CLIMATE CHANGEReport · PDF6 Jun 2023View
9.1_PART 1_APPENDIX 4.3 OUTLINE CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN.Report · PDF6 Jun 2023View
7.3_PART 3_CH15_SHADOW FLICKERReport · PDF6 Jun 2023View
7.3_PART 3_CH16_SUMMARY OF INTERRELATED EFFECTS AND LIKELY SIGNIFICANT EFFECTSReport · PDF6 Jun 2023View
8.1_TH_ES_V2_0_FRONT COVER_PREFACE_CONTENTS PAGEReport · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 1.1_SITE LOCATIONDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 3.1_TURBINE LAYOUT EVOLUTIONDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 4.1A_INFRASTRUCTURE LAYOUT.Drawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 4.1B-H_DETAILED INFRASTRUCTURE LAYOUT.Drawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 4.2_TURBINE ELEVATIONDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 4.3_TURBINE FOUNDATIONDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 4.4_CRANE HARDSTANDING ARRANGEMENTDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 4.5_INDICATIVE CABLE TRENCH DETAILSDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 4.6_INDICATIVE SUBSTATION LAYOUT AND ELEVATION.Drawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 4.7 INDICATIVE PERMANENT ANEMOMETER MASTDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 4.8 INDICATIVE MAIN CONSTRUCTION COMPOUND LAYOUTDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 4.9 INDICATIVE SATELLITE CONSTRUCTION COMPOUND LAYOUTDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 4.10 BORROW PIT GENERAL ARRANGEMENTDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 4.11 INDICATIVE ACCESS TRACK ARRANGEMENT.Drawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 4.12 INDICATIVE WATERCOURSE CROSSINGDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 4.13_EXISTING PROWDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 4.14_REPLACEMENTCOMMONLANDPLANDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 5.1_STUDY AREADrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 5.2_TRAFFIC COUNT LOCATIONSDrawing · PDF6 Jun 2023View
9.1_PART 1_APPENDIX 5.1_TRANSPORT ASSESSMENT.Report · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 5.3_ACCIDENT LOCATIONSDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 5.4_AIL AND CONSTRUCTION VEHICLES DELIVERY ROUTESDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 6.1_LVIA STUDY AREADrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 6.2A_HUBHEIGHTZTV_28KM_A3LDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 6.2B_HUBHEIGHTZTV_15KM_A3LDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 6.3A_11355_R0_TIPHEIGHTZTV_28KM_A3LDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 6.3B_11355_R0_TIPHEIGHTZTV_15KM_A3LDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 6.4_11355_R0_SITETOPOGRAPHY_A3LDrawing · PDF6 Jun 2023View
.1_PART 1_APPENDIX 5.2_TRANSPORT MANAGEMENT PLAN.Report · PDF6 Jun 2023View
9.2_PART 2_0_FRONT COVER_PREFACE_CONTENTS PAGEReport · PDF6 Jun 2023View
9.2_PART 2_APPENDIX 6.1_LVIA METHODOLOGYReport · PDF6 Jun 2023View
6.5A_11355_R0_PROPOSEDSCHEME_A3LDrawing · PDF6 Jun 2023View
9.2_PART 2_APPENDIX 6.2_ZTV MAPPING AND VISUALISATION METHODOLOGY.Report · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 6.5B_11355_R0_PROPOSEDSCHEMEAERIAL_A3LDrawing · PDF6 Jun 2023View
9.2_PART 2_APPENDIX 6.3_SCOPING OF LANDMAP ASPECT AREASReport · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 6.6_11355_R0_NLCA_A3L.Drawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 6.7A_11355_R0_LANDMAP_VISUALSENSORY_A3Drawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 6.7B_11355_R0_LANDMAP_HISTORICLANDSCAPE_A3LDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 6.7C_11355_R0_LANDMAP_GEOLOGICALLANDSCAPE_A3LDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 6.7D_11355_R0_LANDMAP_LANDSCAPEHABITAT_A3LDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 6.7E_11355_R0_LANDMAP_CULTURALLANDSCAPE_A3LDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 6.8A_11355_R0_LANDSCAPEUNITSZTV_28KM_A3LDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 6.8B_11355_R0_LANDSCAPEUNITSZTV_7KM_A3LDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 6.8C_11355_R0_LANDSCAPEUNITSSCOPEDIN_7KM_A3LDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 6.9A_11355_R0_DESIGNATEDLANDSCAPEZTV_28KM_A3L.Drawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 6.9B_11355_R0_DESIGNATEDLANDSCAPEZTV_10KM_A3LDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 6.10_11355_R0_DARKSKIES_A3LDrawing · PDF6 Jun 2023View
9.2_PART 2_APPENDIX 6.4_LANDSCAPE ASSESSMENT TABLESReport · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 6.11_11355_R0_BRECONBEACONSLCA_A3Drawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 6.12_11355_R0_OPERATIONALSCHEMESCZTV_A3LDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 6.13A_11355_R0_VISUALRECEPTOR_LOCALCOMMUNITIES_A3LDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 6.13B_11355_R0_VISUALRECEPTOR_ROADSRAILWAY_A3LDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 6.13C_11355_R0_VISUALRECEPTOR_OPENACCESSWALKINGCYCLING_A3L.Drawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 6.13D_11355_R0_VISUALRECEPTOR_VISITORATTRACTIONSVIEWPOINTSSUDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 6.13D_11355_R0_VISUALRECEPTOR_VISITORATTRACTIONSVIEWPOINTSSUDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 6.14A_11355_R0_VISUALRECEPTOR_LOCALCOMMUNITIES_ZTV_A3LDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 6.14B_11355_R0_VISUALRECEPTOR_ROADSZTV_A3LDrawing · PDF6 Jun 2023View
9.2_PART 2_APPENDIX 6.5_VISUAL ASSESSMENT TABLESReport · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 6.14C_11355_R0_VISUALRECEPTOR_OPENACCESSWALKINGCYCLINGZTV_A3Drawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 6.14D_11355_R0_VISUALRECEPTOR_VISITORATTRACTIONSVIEWPOINTSSUDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 6.15A_11355_R0_VIEWPOINTS_28KM_A3LDrawing · PDF6 Jun 2023View
9.2_PART 2_APPENDIX 6.6_ASSESSMENT OF DESIGNATED LANDSCAPESReport · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 6.15B_11355_R0_VIEWPOINTS_15KM_A3LDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 6.16_11355_R0_CUMULATIVEASSESSMENT_A3LDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 6.17A_11355_R0_CZTV_SCENARIOA_WITHIN5KMGROUP_15KM_A3LDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 6.17B_11355_R0_SOLARFARMCZTV_10KM_A3LDrawing · PDF6 Jun 2023View
9.2_PART 2_APPENDIX 6.8_ AVIATION LIGHTING ASSESSMENTReport · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 6.18A_11355_R0_CZTV_SCENARIOA_5_15KMGROUP_15KM_A3LDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 6.18B_11355_R0_CZTV_SCENARIOB_5_15KMGROUP_15KM_A3LDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 6.18B_11355_R0_CZTV_SCENARIOB_5_15KMGROUP_15KM_A3LDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 6.19B_11355_R0_CZTV_SCENARIOB_15KMGROUP_15KM_A3LDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 6.20_11355_R0_ADDRESSBASEDATA_A3LDrawing · PDF6 Jun 2023View
9.3_TH_ES_V3_PART 3A_APPENDIX 6.7_RESIDENTIAL VISUAL AMENITY ASSESSMENT_CONFIDENReport · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 6.21_11355_R0_PROPERTYLOCATIONS_HUBHZTV_A3LDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 6.22_11355_R0_PROPERTYLOCATIONS_TIPHZTV_A3LDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 6.22_11355_R0_PROPERTYLOCATIONS_TIPHZTV_A3LDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 6.23A_11355_R0_LIGHTINGINTENSITY_28KM_A3LDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 6.23B_11355_R0_LIGHTINGINTENSITY_15KM_A3L.Drawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 6.23C_11355_R0_LIGHTINGINTENSITY_2KM_A3Drawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 6.24_11355_R0_VP_ILLUMINANCE_15KM_A3LDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 6.25_11355_R0_LANDSCAPESIGNIFICANTEFFECTS_A3LDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 6.26_11355_R0_VISUALSIGNIFICANTEFFECTS_A3LDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 7.1_ENVIRONMENTAL DESIGNATIONSDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 7.2_HYDROLOGICAL OVERVIEWDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 7.3_BEDROCK GEOLOGYDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 7.4_SUPERFICIAL GEOLOGYDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 7.5_PEAT DEPTHDrawing · PDF6 Jun 2023View
9.3_TH_ES_V3_PART 3B_APPENDIX 6.7_RESIDENTIAL VISUAL AMENITY ASSESSMENT_CONFIDENReport · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 8.1A_I-V_NATURE CONSERVATION DESIGNATIONS_STATUTORYDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 8.1B_I-VI_NATURE CONSERVATION DESIGNATIONS_NON STATUTORYDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 8.2_I-IV_PHASE 1 HABITATSDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 8.3_I-IV_NVC HABITATSDrawing · PDF6 Jun 2023View
9.3_TH_ES_V3_PART 3C_APPENDIX 6.7_RESIDENTIAL VISUAL AMENITY ASSESSMENT_CONFIDENReport · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 8.4_I-IV_GWDTEDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 8.5 OTTER AND WATER VOLEDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 8.6 DRYSTONE WALL LOSSDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 9.1_VANTAGE POINT LOCATIONS AND VIEWSHEDS.Drawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 9.1_VANTAGE POINT LOCATIONS AND VIEWSHEDS.Drawing · PDF6 Jun 2023View
9.3_TH_ES_V3_PART 3D_APPENDIX 6.7_RESIDENTIAL VISUAL AMENITY ASSESSMENT_CONFIDENReport · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 9.2_NATURE CONSERVATION DESIGNATIONSDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 11.1A_HISTORIC ASSETS WITHIN THE SITEDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 11.1B_HISTORIC ASSETS WITHIN THE SITEDrawing · PDF6 Jun 2023View
9.3_TH_ES_V3_PART 3E_APPENDIX 6.7_RESIDENTIAL VISUAL AMENITY ASSESSMENT_CONFIDENReport · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 11.1C_HISTORIC ASSETS WITHIN THE SITEDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 11.2_SETTING STUDY AREADrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 11.3_SETTING WITHIN THE SITEDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 12.1_MINING CONSTRAINTS PLANDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 12.1_MINING CONSTRAINTS PLANDrawing · PDF6 Jun 2023View
9.3_TH_ES_V3_PART 3F_APPENDIX 6.7_RESIDENTIAL VISUAL AMENITY ASSESSMENT_CONFIDENReport · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE 15.1_MAXIMUM THEORETICAL SHADOW FLICKER AND ASSESSMENT PROPEDrawing · PDF6 Jun 2023View
9.4_TH_ES_V3_PART 4_0_FRONT COVER_PREFACE_CONTENTS PAGEReport · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE10.1_NOISESURVEYLOCATIONSDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE10.2_NOISEASSESSMENTCONTOURSDrawing · PDF6 Jun 2023View
8.1_TH_ES_V2_FIGURE10.2_NOISEASSESSMENTCONTOURSDrawing · PDF6 Jun 2023View
9.4_TH_ES_V3_PART 4_APPENDIX 7.1_FCA.Report · PDF6 Jun 2023View
9.4_TH_ES_V3_PART 4_APPENDIX 7.2_SCHEDULE OF WCX.Report · PDF6 Jun 2023View
9..4_TH_ES_V3_PART 4_APPENDIX 7.3_PWS.Report · PDF6 Jun 2023View
9.4_TH_ES_V3_PART 4_APPENDIX 7.4_DRAINAGE STATEMENT.Report · PDF6 Jun 2023View
9.4_TH_ES_V3_PART 4_APPENDIX 7.5_PLHRA.Report · PDF6 Jun 2023View
9.4_TH_ES_V3_PART 4_APPENDIX 7.6_PMPReport · PDF6 Jun 2023View
9.4_TH_ES_V3_PART 4_APPENDIX 7.7_GWDTEReport · PDF6 Jun 2023View
9.5_TH_ES_V3_PART 5_0_FRONT COVER_PREFACE_CONTENTS PAGEReport · PDF6 Jun 2023View
9.5_TH_ES_V3_PART 5_APPENDIX 8.1_DESK STUDY REPORTReport · PDF6 Jun 2023View
9.5_TH_ES_V3_PART 5_APPENDIX 8.2_PHASE 1 HABITAT AND NATIONAL VEGETATION CLASSIFReport · PDF6 Jun 2023View
9.5_TH_ES_V3_PART 5_APPENDIX 8.3A-C_BAT SURVEYS 2020-2021 AND BAT RISK ASSESSMENReport · PDF6 Jun 2023View
9.5_TH_ES_V3_PART 5_APPENDIX 8.5_OTTER AND WATER VOLE SURVEYReport · PDF6 Jun 2023View
9.5_TH_ES_V3_PART 5_APPENDIX 8.6_DORMOUSE SURVEYReport · PDF6 Jun 2023View
9.5_TH_ES_V3_PART 5_APPENDIX 8.7_HABITAT MANAGEMENT PLAN AND BNG ASSESSMENT.Report · PDF6 Jun 2023View
9.5_TH_ES_V3_PART 5_APPENDIX 9.1_AVIAN TECHNICAL REPORTReport · PDF6 Jun 2023View
9.5_TH_ES_V3_PART 5_APPENDIX 9.2_COLLISION RISK MODELLING REPORT.Report · PDF6 Jun 2023View
9.6_TH_ES_V3_PART 6_0_FRONT COVER_PREFACE_CONTENTS PAGEReport · PDF6 Jun 2023View
9.6_TH_ES_V3_PART 6_APPENDIX 10.1_NOISE TECHNICAL REPORTReport · PDF6 Jun 2023View
9.6_TH_ES_V3_PART 6_APPENDIX 11.1_ARCHAEOLOGICAL DBAReport · PDF6 Jun 2023View
9.6_TH_ES_V3_PART 6_APPENDIX 11.2_GEOPHYSICAL SURVEY REPORTReport · PDF6 Jun 2023View
9.6_TH_ES_V3_PART 6_APPENDIX 12.1_GEO-ENVIRONMENTAL DESK STUDY AND MINING RISK AReport · PDF6 Jun 2023View
9.6_TH_ES_V3_PART 6_APPENDIX 12.3_FIELD SURVEY SUMMARY REPORT AND GROUNDWATER LAReport · PDF6 Jun 2023View
9.6_TH_ES_V3_PART 6_APPENDIX 13.1_AVIATION LIGHTING REPORT.Report · PDF6 Jun 2023View
9.6_TH_ES_V3_PART 6_APPENDIX 14.1_CARBON BALANCE ASSESSMENT_3.Report · PDF6 Jun 2023View
9.6_TH_ES_V3_PART 6_APPENDIX 15.1_SHADOW FLICKER ASSESSMENT REPORT.Report · PDF6 Jun 2023View
PAGES FROM 9.1_PART 1_APPENDIX 2.1_SCOPING REPORT (1 OF 6).Report · PDF6 Jun 2023View
PAGES FROM 9.1_PART 1_APPENDIX 2.1_SCOPING REPORT (2 OF 6)Report · PDF6 Jun 2023View
PAGES FROM 9.1_PART 1_APPENDIX 2.1_SCOPING REPORT (3 OF 6)Report · PDF6 Jun 2023View
PAGES FROM 9.1_PART 1_APPENDIX 2.1_SCOPING REPORT (4 OF 6)Report · PDF6 Jun 2023View
PAGES FROM 9.1_PART 1_APPENDIX 2.1_SCOPING REPORT (5 OF 6).Report · PDF6 Jun 2023View
PAGES FROM 9.1_PART 1_APPENDIX 2.1_SCOPING REPORT (6 OF 6)Report · PDF6 Jun 2023View
10.1_TH_ES_V4_0_FRONT COVER_PREFACE_CONTENTS PAGEReport · PDF6 Jun 2023View
10.2.1_TWYN HYWEL_ES VOL 4 FIGURE CH1_CAERPHILLY CASTLE BY TOMMY COOPER STATUE.Photo · PDF6 Jun 2023View
10.2.2_TWYN HYWEL_ES VOL 4 FIGURE CH2_CAERPHILLY CASTLE NW TOWERPhoto · PDF6 Jun 2023View
10.2.3_TWYN HYWEL_ES VOL 4 FIGURE CH3_CAERPHILLY CASTLE VIEW FROM VANPhoto · PDF6 Jun 2023View
FIG-32B_VP32B-BEACONS WAY, CRAIG Y FAN DDU_20230313Photo · PDF6 Jun 2023View
FIG-32_VP32-BEACONS WAY, GWAUN CERRIG LLWYDION_20230313Drawing · PDF6 Jun 2023View
FIG-31_VP31-MYNYDD GARNCLOCHDY_20230313.Drawing · PDF6 Jun 2023View
FIG-29_VP29-MANMOEL ROAD - SIRHOWY VALLEY WALK_20230313.Drawing · PDF6 Jun 2023View
FIG-28_VP28-UNNAMED ROAD AT MYNYDD BEDWELLTE_20230313Drawing · PDF6 Jun 2023View
FIG-27_VP27-PENGARNBUGAIL_20230313Drawing · PDF6 Jun 2023View
FIG-26_VP26-TWMBARLWM_20230313Drawing · PDF6 Jun 2023View
10.2.4_TWYN HYWEL_ES VOL 4 FIGURE CH4_INSIDE LLANCAIACH FAWR MANOR.Photo · PDF6 Jun 2023View
10.2.5_TWYN HYWEL_ES VOL 4 FIGURE CH5_LLANBRADACH FAWRPhoto · PDF6 Jun 2023View
10.2.6_TWYN HYWEL_ES VOL 4 FIGURE CH6_CHURCH OF ST ILANPhoto · PDF6 Jun 2023View
10.2.7_TWYN HYWEL_ES VOL 4 FIGURE CH7_GROESWEN CHAPEL (LISTED BUILDING 13573Photo · PDF6 Jun 2023View
10.2.8_TWYN HYWEL_ES VOL 4 FIGURE CH8_WATFORD CHAPEL (LISTED BUILDING 21380).Photo · PDF6 Jun 2023View
10.2.9_TWYN HYWEL_ES VOL 4 FIGURE CH9_PARC MAWR FARMHOUSE (LISTED BUILDING 21960Drawing · PDF6 Jun 2023View
FIG-25_VP25-OAKDALE PARK_20230313Drawing · PDF6 Jun 2023View
FIG-24_VP24-GARTH HILL, PENTRYCH_20230313.Drawing · PDF6 Jun 2023View
FIG-23_VP23-CEFN-GLAS (CRAIG YR EFAIL)_20230313.Drawing · PDF6 Jun 2023View
FIG-22_VP22-RHYMNEY VALLEY RIDGEWAY WALK AT GELLI-GAER COMMON_20230313Drawing · PDF6 Jun 2023View
FIG-21_VP21-CAERPHILLY COMMON_20230503.Drawing · PDF6 Jun 2023View
FIG-20_VP20-TWYNYGARREG, TREHARRIS_20230313Drawing · PDF6 Jun 2023View
FIG-19_VP19-PUBLIC FOOTPATH OFF TONYREFAIL ROAD NEAR PEN-Y-COEDCAE_20230313.Drawing · PDF6 Jun 2023View
FIG-18_VP18-CAERPHILLY CASTLE (BY TOMMY COOPER STATUE)_202303131Drawing · PDF6 Jun 2023View
FIG-17_VP17-RHYMNEY VALLEY WALK AT MYNYDD Y GRUG_20221013Drawing · PDF6 Jun 2023View
FIG-16_VP16-ANEURIN BEVAN AVENUE, GELLIGAER_20230503.Photo · PDF6 Jun 2023View
FIG-15_VP15-SALISBURY ROAD, ABERCYNON_20230313.Photo · PDF6 Jun 2023View
FIG-14_VP14-LLANCAIACH FAWR MANOR AND ESTATE (SOUTH-EAST OF TRELEWIS)_20230503.Photo · PDF6 Jun 2023View
FIG-13_VP13-TENBY COURT, HENDREDENNY_202303013.Photo · PDF6 Jun 2023View
FIG-13_VP13-TENBY COURT, HENDREDENNY_202303013.Photo · PDF6 Jun 2023View
FIG-13_VP13-TENBY COURT, HENDREDENNY_202303013.Photo · PDF6 Jun 2023View
FIG-12_VP12-JUNCTION OF HEOL TASKER AND CAE LLWYNDU, NELSON_20230503.Photo · PDF6 Jun 2023View
FIG-11_VP11-RHYMNEY VALLEY WALK AT MYNYDD MEIO_20230503Photo · PDF6 Jun 2023View
FIG-10_VP10-MYRTLE GROVE, HENGOED, YSTRAD MYNYCH_20230313Photo · PDF6 Jun 2023View
10.2.9_TWYN HYWEL_ES VOL 4 FIGURE CH9_PARC MAWR FARMHOUSE (LISTED BUILDING 21960Photo · PDF6 Jun 2023View
10.2.10_TWYN HYWEL_ES VOL 4 FIGURE CH10_PEN-Y-WAUN FARMHOUSE (LISTED BUILDING 24Photo · PDF6 Jun 2023View
10.2.11_TWYN HYWEL_ES VOL 4 FIGURE CH11_CASTLE SQUARE TREFOREST CONSERVATION AREDrawing · PDF6 Jun 2023View
10.2.12_TWYN HYWEL_ES VOL 4 FIGURE CH12_NELSON CONSERVATION AREA 1Drawing · PDF6 Jun 2023View
10.2.13_TWYN HYWEL_ES VOL 4 FIGURE CH13_NELSON CONSERVATION AREA 2Drawing · PDF6 Jun 2023View
10.2.14_TWYN HYWEL_ES VOL 4 FIGURE CH14_TREDOMEN CONSERVATION AREADrawing · PDF6 Jun 2023View
10.2.15_TWYN HYWEL_ES VOL 4 FIGURE CH15_TAF CONSERVATION AREA.Drawing · PDF6 Jun 2023View
10.2.16_TWYN HYWEL_ES VOL 4 FIGURE CH16_GRAIGWEN CONSERVATION AREADrawing · PDF6 Jun 2023View
10.2.17_TWYN HYWEL_ES VOL 4 FIGURE CH17_GELLIHAF CONSERVATION AREA.Drawing · PDF6 Jun 2023View
10.2.18_TWYN HYWEL_ES VOL 4 FIGURE CH18_CHURCH OF HOLY TRINITY.Drawing · PDF6 Jun 2023View
12.1 TWYN HYWEL PLANNING STATEMENTReport · PDF6 Jun 2023View
12.2 TWYN HYWEL STATEMENTS OF COMMON GROUNDReport · PDF6 Jun 2023View
FIG-1_VP01-BWLCH CARNYGELLI, JUST SOUTH OF JUNCTION WITH HEOL LAS_20230322.Drawing · PDF6 Jun 2023View
FIG-2_VP02-EGLWYSILAN ROAD_20230313.Drawing · PDF6 Jun 2023View
FIG-3_VP03-ALEXANDRA TERRACE, SENGHENYDD_20230313.Drawing · PDF6 Jun 2023View
FIG-4_VP04-BYWAY (SOUTHERN PART OF MYNYDD EGLWYSILIAN SLA)_20230313.Drawing · PDF6 Jun 2023View
FIG-5_VP05-PARC TERRACE, SENGHENYDD_20230313.Drawing · PDF6 Jun 2023View
FIG-6_VP06-GARTH ESTATE, ABERTRIDWR_20230313.Drawing · PDF6 Jun 2023View
FIG-7_VP07-TAFF TRAIL - NCN ROUTE 8 (EAST OF GLYNCOCH)_20230313Drawing · PDF6 Jun 2023View
FIG-8_VP08-UPPER ALMA TERRACE, TREFOREST, PONTYPRIDD_20230313Drawing · PDF6 Jun 2023View
FIG-9_VP09-THE OBSERVATORY AT PARC PENALLTA COUNTRY PARK_20230322.Drawing · PDF6 Jun 2023View
PAGES FROM 5.1_PRE-APPLICATION_CONSULTATION_REPORT_APPENDIX_9 REDUCED (1 OF 13).Report · PDF6 Jun 2023View
PAGES FROM 5.1_PRE-APPLICATION_CONSULTATION_REPORT_APPENDIX_9 REDUCED (2 OF 13)Report · PDF6 Jun 2023View
PAGES FROM 5.1_PRE-APPLICATION_CONSULTATION_REPORT_APPENDIX_9 REDUCED (3 OF 13).Report · PDF6 Jun 2023View
PAGES FROM 5.1_PRE-APPLICATION_CONSULTATION_REPORT_APPENDIX_9 REDUCED (4 OF 13)Report · PDF6 Jun 2023View
PAGES FROM 5.1_PRE-APPLICATION_CONSULTATION_REPORT_APPENDIX_9 REDUCED (5 OF 13).Report · PDF6 Jun 2023View
PAGES FROM 5.1_PRE-APPLICATION_CONSULTATION_REPORT_APPENDIX_9 REDUCED (6 OF 13Report · PDF6 Jun 2023View
PAGES FROM 5.1_PRE-APPLICATION_CONSULTATION_REPORT_APPENDIX_9 REDUCED (7 OF 13).Report · PDF6 Jun 2023View
PAGES FROM 5.1_PRE-APPLICATION_CONSULTATION_REPORT_APPENDIX_9 REDUCED (8 OF 13)Report · PDF6 Jun 2023View
PAGES FROM 5.1_PRE-APPLICATION_CONSULTATION_REPORT_APPENDIX_9 REDUCED (9 OF 13)Report · PDF6 Jun 2023View
PAGES FROM 5.1_PRE-APPLICATION_CONSULTATION_REPORT_APPENDIX_9 REDUCED (10 OF 13)Report · PDF6 Jun 2023View
PAGES FROM 5.1_PRE-APPLICATION_CONSULTATION_REPORT_APPENDIX_9 REDUCED (11 OF 13)Report · PDF6 Jun 2023View
PAGES FROM 5.1_PRE-APPLICATION_CONSULTATION_REPORT_APPENDIX_9 REDUCED (12 OF 13)Report · PDF6 Jun 2023View
PAGES FROM 5.1_PRE-APPLICATION_CONSULTATION_REPORT_APPENDIX_9 REDUCED (13 OF 13Report · PDF6 Jun 2023View
14.1_TWYN HYWEL_SOCIO-ECONOMIC IMPACT APPRAISALReport · PDF6 Jun 2023View
15.1 WRITTEN STATEMENT ABOUT SECONDARY CONSENTSCorrespondence · PDF6 Jun 2023View
15.2 SECTION 16 COMMON LAND APPLICATION FORM (CL61).Report · PDF6 Jun 2023View
15.3 SECTION 16 COMMON LAND APPLICATION PLANSOS Extract · PDF6 Jun 2023View
15.3 SECTION 16 COMMON LAND APPLICATION PLANS.OS Extract · PDF6 Jun 2023View
15.4 SECTION 38 COMMON LAND APPLICATION FORM (CL61).Report · PDF6 Jun 2023View
15.5 SECTION 38 COMMON LAND APPLICATION PLANS.Report · PDF6 Jun 2023View
15.5 SECTION_38_PLANS.OS Extract · PDF6 Jun 2023View
15.7 COMMON LAND REGISTER PLAN CL61 - MYNYDD EGWYSILANOS Extract · PDF6 Jun 2023View
15.8 COMMON LAND REPORT_REDACTED.Report · PDF6 Jun 2023View
15.9 SECTION 57 CHANGE OF USE APPLICATION FORMSApplication Form · PDF6 Jun 2023View
15.9 SECTION 57 CHANGE OF USE PLANNING STATEMENTReport · PDF6 Jun 2023View
15.9 SECTION 57 CHANGE OF USE SITE LOCATION PLANOS Extract · PDF6 Jun 2023View
APPLICATION PLANOS Extract · PDF6 Jun 2023View
0.1 APPLICATION COVER LETTERCorrespondence · PDF24 May 2023View
0.2 ELECTRONIC DOCUMENT INDEXOther · PDF24 May 2023View
1.3 DNS NOTICE 16 (1)Report · PDF24 May 2023View
1.2 CERTIFICATE IN RELATION TO NOTIFICATION OF APPLICATIONApplication Form · PDF24 May 2023View
9.1 PART 1_0_FRONT COVER PREFACE CONTENTS PAGEReport · PDF30 Apr 2023View
4.1_TH_DESIGN_AND_ACCESS_STATEMENTReport · PDF1 Apr 2023View
2.1 ACCEPTANCE OF NOTIFICATIONReport · PDF28 Oct 2022View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Granted
WELSH MINISTERS DECISION LETTER DECISION NOTICE - VERSION 8 DECISION - VERSION 9
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.